INDOT Height Modernization Project Ryan C. Swingley, PLS Andrew D. Baxter, PLS.

Slides:



Advertisements
Similar presentations
Vietnam NSDI Strategic Plan
Advertisements

Best Practices for Real-Time GNSS Network Administration Webinar July 31, pm ET RTK/RTN Precision vs. Accuracy & Occupation Time Mark L. Armstrong,
Indiana Height Modernization Update Definition (programs goals for each): Improve geodetic infrastructure -HARN Project Benefit of following 47 other.
New Geometric Datum: plans Modernizing the U.S. National Spatial Reference System FGCS San Diego, California Monday 11 July 2011.
US Army Corps of Engineers BUILDING STRONG ® 5/7/2015 Adopting National Standards for Tidal and Geodetic Datums Jim Garster US Army Corps of Engineers.
Geodetic Control Framework Theme 6 th of the CA Core Framework Themes Marti Ikehara Geodetic Advisor for California NOAA’s National Geodetic Survey Sacramento,
Assistant Administrator National Oceanic and Atmospheric Administration National Ocean Service September 18, 2008 John H. Dunnigan Toward National Height.
Alabama Height Modernization Project, NAD 83(2011), and GEOID 12 in Alabama Overview of Height Modernization Project Overview of Height Modernization.
Mission Statement SC Height Modernization Status In the NGS Database (Height Mod Project) In progress Proposed.
National Height Modernization Program (NHMP) Update Great Lakes Region Height Modernization Consortium Meeting Columbus, OH October 13, 2011.
REAL TIME POSITIONING “ IT DEPENDS” REAL TIME POSITIONING PDOP MULTIPATH SATELLITES BASE ACCURACY BASE SECURITY REDUNDANCY, REDUNDANCY, REDUNDANCY PPM.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting Tuesday, November 3, 2009 Juliana Blackwell Director,
Ohio Height Modernization Related Activities Great Lakes Regional Forum Sept 24-25, 2008 Madison, Wisconsin David Conner Geodetic Advisor to the State.
2015 Height Modernization Partner Meeting April 14, 2015.
Better Positions and Improved Access to the National Spatial Reference System  Multi-Year CORS Solution  National Adjustment of 2011  New NGS Datasheet.
Refinements to the North American Datum of 1983 Multi-Year CORS Solution and the National Adjustment of 2011 Dr. Neil D. Weston Chief, Spatial Reference.
Federal Geodetic Control Subcommittee Update to Coordination Group Ronnie Taylor alternate Subcommittee Chair Deputy Director, National Geodetic Survey.
Feedback on the New Datums 2015 Geospatial Summit April 13 to 14, 2015 North Carolina Geodetic Survey Gary W. Thompson.
Education for Height Modernization Dr. Stacey D. Lyle, RPLS.
NATIONAL HEIGHT MODERNIZATION PARTNER MEETING APRIL 30 TO MAY 1, FRANKFORT, KY 1 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013.
NATIONAL HEIGHT MODERNIZATION PARTNER MEETING APRIL 29 to 30 MOBILE, AL 1 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2014.
Surveying & Mapping. GPS on Bench Marks Campaign.
Juliana Blackwell, Director National Geodetic Survey, NOAA
Streamgage Datum Conversion Great Lakes Region Height Modernization Consortium meeting New Cumberland, PA April 13, 2011.
International Great Lakes Datum Overview Presented at a Height Modernization Program meeting January 9, 2014 by David Conner Geodetic Advisor to the State.
Streamgage Datum Conversion Eastern Region Height Modernization Consortium Webinar March 4, 2014 Jim Kolva, USGS, Office of Surface Water.
Mission Statement SC Height Modernization Status In the NGS Database (Height Mod Project) In progress Proposed.
GEODETIC INFRASTRUCTURE Walter Volkmann Manager of Technical Operations L. D. Bradley Land Surveyors Gainesville, Florida.
NGS HSRP Update Ronnie Taylor, Acting Director National Geodetic Survey, NOAA October 13, 2010.
The Future of the National Geodetic Survey Dr. Dru A. Smith Chief Geodesist, NGS/NOAA CSRC, Coordinating Council Spring Meeting La Jolla, CA April 28,
≥107 RTN USA ≥35 DOT ACADEMIC/SCIENTIFIC SPATIAL REFERENCE CENTERS VARIOUS DOTS + MACHINE GUIDANCE COUNTY CITY GEODETICSURVEYS(NC,SC) MANUFACTURERS VENDOR.
A New & Improved National Spatial Reference System Refinements of the North American Datum of 1983 through the Multi-Year CORS Solution and the National.
Great Lakes Regional Height Modernization Meeting March 23, 2010 Height Modernization in Indiana Who we are How we got here Thomas A. Mahon, LS.
National Height Modernization Program Overview January 24, 2006 Juliana Blackwell Height Modernization Program Manager.
GPS and Geodetic News You Can Use David Conner Geodetic Advisor to the State of Ohio National Geodetic Survey, NOAA 2008 Ohio GIS Conference September.
Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships Building.
Wisconsin Between 1998 and 2005, the State of Wisconsin invested over $6.5M to the Wisconsin Height Modernization Plan (WI-HMP), using a combination of.
2010 Hydrographic Services Review Panel David Steele, PLS DNR Geodetic Survey Director & Spatial Reference Center of Washington.
NOAA’s National Height Modernization Program Zelda LeCoat National Geodetic Survey National Oceanic and Atmospheric Administration.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting Tuesday, November 3, 2009 Juliana Blackwell Director,
Height Modernization Making the Most of the Indiana HARN and the INDOT CORS March 14, 2007 By William A. Schmidt, PE, LS Manager of Aerial Engineering,
AEC Summit NOAA’s National Geodetic Survey Update Brian Shaw Geodesist.
National Geodetic Survey – Continuously Operating Reference Stations & Online Positioning User Service (CORS & OPUS) William Stone Southwest Region (UT,
Real Time Network Activities at The National Geodetic Survey Neil D. Weston National Geodetic Survey, NOS, NOAA Silver Spring, Maryland January,
The National Geodetic Survey Gravity Program Benefits and Opportunities Juliana Blackwell, Director National Geodetic Survey (NGS)
Positioning America for the Future NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION National Ocean Service National Geodetic Survey Real-Time Mantra Pass.
2013 Height Modernization Partnership Meeting HMOD Western Regional Webinar November 19, 2013.
MISSISSIPPI HEIGHT MODERNIZATION PROJECT JUNE 11, 2009 By Ronnie L. Taylor Chief, Geodetic Advisor Branch NOAA, National Geodetic Survey.
IGIC Committees and Resources Bill Holder, Kosciusko County GIS Director Jill Saligoe-Simmel, IGIC Executive Director.
The INDOT CORS Indiana GIS Conference February 19, 2008 By William A. Schmidt, PE, LS Manager of Aerial Engineering, INDOT Thomas A. Mahon, PE, LS Survey.
2015 International Great Lakes Datum Height Modernization Project Dave Rigney NGS Geodetic Advisor Michigan Great Lakes Region Height.
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Laura Rear McLaughlin Center for Operational.
The Height Modernization Program in the United States and the Future of the National Vertical Reference Frame 1 Renee Shields National Geodetic Survey,
VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey January 10, 2012.
National Geodetic Survey’s National Height Modernization Program Overview Monroe, Louisiana June 11-12, 2009 Renee Shields Height Modernization Manager.
Height Modernization in the U.S.: Implementing a Vertical Datum Referenced to a Gravimetric Geoid Model Renee Shields National Geodetic Survey, U.S.A.
IGIC Committee and Workgroup Initiatives Bill Holder, GISP Kosciusko County GIS IGIC President.
2012 Government Geospatial Coordinator Forum Welcome!
Height Modernization Activities at NGS Christine Gallagher National Partner Meeting April 30, 2014.
Geodetic Applications of GNSS within the United States Dr. Gerald L. Mader National Geodetic Survey NOS/NOAA Silver Spring, Maryland USA Munich Satellite.
Height Mod in Kentucky Height Modernization Forum Flint, Michigan January 26, 2006 Ross Mackay Kentucky Geodetic Advisor.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting 11 January 2011 Ronnie Taylor Acting Director,
GRAV-D: NGS Gravity for the Re- definition of the American Vertical Datum Project V. A. Childers, D. R. Roman, D. A. Smith, and T. M. Diehl* U.S. National.
WESTERN REGION HEIGHT MOD WEBINAR NOVEMBER 19,
SC – VRS Network To Support Surveying and Machine Control.
October 24, 2005 Silver Spring, Maryland MinnesotaDixon Hoyle MichiganDave Rigney Illinois Chris Pearson Ohio Dave Conner KentuckyRoss Mackay Convocation.
Colorado Height Modernization Forum Zelda LeCoat Zelda LeCoat.
The Future of the National Geodetic Survey Dr. Dru A. Smith Chief Geodesist, NGS/NOAA NGS Convocation Silver Spring, MD October 24, 2005.
Elevation and Geodetic Control Workgroup
IGIC/ISPLS Geodetic Control Workgroup
Presentation transcript:

INDOT Height Modernization Project Ryan C. Swingley, PLS Andrew D. Baxter, PLS

Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships What is Ht. Mod.? A National Oceanic and Atmospheric Administration Program Uses GPS and other new technologies to improve elevation accuracy Program Objectives  Improve Transportation by reducing design and construction costs  Accurate determination of floodplains  Study runoff amounts and effects  Improve agricultural yields  Manage coastal resources

Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships Why is Ht. Mod. Needed? National Spatial Reference System (NSRS) monuments set between 1874 to 1979 Only 2514 monuments have been reported as recovered since 2000 These monuments are the foundation for all Geospatial Infrastructure, GIS, construction and development

Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships Why is Ht. Mod. Needed? National Geographic Vertical Datum of 1929 North American Vertical Datum of1988 INDOT – mixed datums, sometimes unknown These different datums cause potential harm to the public Ht. Mod will create a densified and unified datum for the scientific, geospatial, construction and agricultural communities NGS will implement a new vertical datum in 2021

Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships Why is Ht. Mod. Needed? Regions of Changing Height

Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships Why is Ht. Mod. Needed? New NGS datum will based solely on airborne gravitation measurements Ht. Mod. will facilitate the current datum to be updated for 2021  Bring previous work (survey, construction, GIS) to be more accurately updated to 2021 datum

Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships Indiana Ht. Mod. History IGIC/ISPLS joint committee since 2006 Held a Ht. Mod. Forum in 2008 Implementation of the InCORS in 2009 Submitted an Indiana Ht. Mod. Plan to NOAA/NGS in 2009 Joined the Great Lakes Region Ht. Mod. Consortium in 2010 INDOT Benchmark Inventory (2010) Hamilton County Ht. Mod. Pilot Project in 2011 SPR Funds requested and granted in 2012

Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships InCORS 45 GNSS CORS CORS eliminated 2 days of GPS obs.

Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships InCORS Registered Users:  Survey = 664  Construction= 121  GIS= 81  AG= 607  RTN Usage:  2012 average per day = 134  2013 seeing increase of 26 more users per day  676 different companies using network

Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships State-wide Ht. Mod. Project Phase I - Planning Phase  Recover existing 1 st and 2 nd order Benchmarks  20 km spacing  GPS and bluebook using NGS TM 58 and 59

Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships State-wide Ht. Mod. Project Current Geoid 12a Consists of 137 BM Current number of BM created several gaps in 20 KM spacing

Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships State-wide Ht. Mod. Project

Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships State-wide Ht. Mod. Project Phase I DistrictNew Stations# of Tie Points LaPorte1560 Fort Wayne1040 Crawfordsville1040 Greenfield1040 Vincennes25100 Seymour2080 SUB-TOTAL90360

Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships What is next? Request more SPR Funds for Expansion New INDOT standards for leveling benchmark Expansion of network to more localized areas and project specific control More Accurate elevations on existing CORS 2 cm Geoid Head start on 2021 vertical datum change

Coordination of Indiana GIS through dissemination of data and data products, education and outreach, adoption of standards, and building partnerships Questions? Ryan C. Swingley, PLS  Seiler Instruments  Dee Baxter, PLS  INDOT 