HT-C22 and C23 LARP Video-Mtg. 2013-09-12 Arup K. Ghosh Arup Ghosh12013-09-12.

Slides:



Advertisements
Similar presentations
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 14.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL1 Insulation Status for QXF Cables D.R. Dietderich, LBNL LARP-CERN Collaboration meeting April 9, 2013.
QXF Cable, 1 st generation Giorgio Ambrosio, Paolo Ferracin Fermilab CERN QXF Video-meeting June 18, 2013 The HiLumi LHC Design Study is included in the.
Highlights From the Survey on the Use of Funds Under Title II, Part A
LARP MSM Conductor, Cable and Procurement - A. Ghosh1 Strand, Cable and Procurement BNL -FNAL - LBNL - SLAC Magnet Systems Meeting Jan 09, 2014.
Results of Radiant Panel Testing Round Robin 8 Pat Cahill
Oct , 2013, CDP D.R. Dietderich LARP Conductor & Cable Review 1 Conductor Development Program Support for LARP and HiLumi LARP- HiLumi Conductor.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
DOE Review of LARP – February 17-18, 2014 QXF Conductor and Cable Arup K. Ghosh Feb
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
HQ Splice Insulation QXF Coil working group Video Meeting August 22, 2013 Dan Cheng August 22, 2013.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Status of MQXF Conductor LARP Update
RRP & PIT Deformation & RRR Comparison: M. Brown, C. Tarantini, W. Starch, W. Oates, P.J. Lee, D.C. Larbalestier ASC – NHMFL – FSU M2OrA – 05 06/30/15.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC.
Dan Cheng 6/11/2015 QXF coil measurements plan at LBNL.
BNL - FNAL - LBNL - SLAC Progress Report on LQ Program Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Summary of LARP Magnets 1 Summary of LARP magnets (incomplete & to be checked) G. Ambrosio Conductor Video Mtg. April 20, 2015.
LQ Quench Protection – G. Ambrosio 1 LQ DS video Mtg – May. 23, 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole Quench Protection Giorgio Ambrosio LQ DS.
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 11 Introduction Giorgio Ambrosio LQS03 Readiness Review LBNL February 21, 2012 BNL - FNAL.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
D.R. Dietderich Frascati, Italy Nov , 2012 RRP-NbSn Conductor for the LHC Upgrade Magnets RRP-Nb 3 Sn Conductor for the LHC Upgrade Magnets A. K.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL1 LARP Cable R&D FY05 & FY-06 Plans D.R. Dietderich, LBNL Geneva, IL October 5-6, 2005 bnl – fnal – lbnl.
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
US-side contributions to the EUCARD2 collaboration Planning video meeting May 16, 2013.
HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 1 Lessons Learnt from LARP experience Arup. K. Ghosh HL-LHC/LARP International.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
1 Cable Functional Specification March Conductor Working Group Arup K. Ghosh (BNL)
Bi-2212 cable transverse pressure tests in Twente A. Godeke, J. Jiang, E.E. Hellstrom, D.C. Larbalestier – MS&T & ASC – NHMFL - FSU L.D. Cooley, T. Shen.
QXF protection meeting, 4/29/14HQ High Miits Study – H. Bajas, G. Sabbi 1 HQ02 High MIITs Studies Preliminary findings and next steps Hugo Bajas, GianLuca.
Department of Materials Science and Engineering WAMSDO 2008 Stability in Nb 3 Sn -- Explicit Functional Dependence of J s on d eff and RRR, Local RRR Degradation,
April-20, 2015MQXF Strand :Specification choices - A. Ghosh1 MQXF Strand: Available Implementations of various Cu/No-Cu in RRP April-20, 2015 LARP-CERN.
HQ02A2 TEST RESULTS November 7, 2013 FERMILAB. HQ02 test at Fermilab 2  First HQ quadrupole with coils (#15-17, #20) of the optimized design o Only coil.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Helene Felice With input from Dan C, Maxim… Possible options for coil wiring.
LARP DOE Review July 13-14, 2009Materials – Conductor Support - A. Ghosh1 LARP DOE Review July , 2009 FNAL 2.4 Materials – Conductor Support Arup.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
Chris Segal September 5th, 2016
HQ01e-3 magnetic measurements
الاسبوع الإرشادي.
Thermoregulation and Q10 (The Temperature Coefficient)
Strong and Weak Acids and Bases
PROGRESS TOWARDS AN OPEN MIDPLANE SEPARATION DIPOLE
What things affect the rate of reactions?
Greenhouse Gases Lesson 69.
C.2.10 Sample Questions.
C.2.8 Sample Questions.
Resistance.
C.2.8 Sample Questions.
Development of Nb3Sn wire for high magnetic field at WST
Long term behavior and high MIITs test in the LARP program
Presentation transcript:

HT-C22 and C23 LARP Video-Mtg Arup K. Ghosh Arup Ghosh

C22 Reacted at BNL C23 Reacted at LBNL This comparison is for the BNL sample retorts at the two locations.  Effect on I c, and RRR  By Comparing round wire data Arup Ghosh2 Comparison of HT Temperature for HQ-C22 and C23

Arup Ghosh3 650ᵒC HT Plateau ᵒC Difference

Ic and RRR Comparison Arup Ghosh % Difference in I c H K is 0.6 T higher for C23 More pronounced effect on RRR