FERC Scoping Meeting Project No. 2305 Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas.

Slides:



Advertisements
Similar presentations
Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.
Advertisements

The Future of Wixom Lake
J2 Regulating Reservoir Project
State Waters and Stream Buffers
D. Y. Patil Collage of Engg & Tech.
Flood Profile Modeling with Split Flows and Weirs
Seymour Capilano Filtration Project Seymour Capilano Twin Tunnels
WINDY LAND OWNERS SYMPOSIUM 10/17/09 Alternative Energy Institute WEST TEXAS A&M UNIVERSITY.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
Cove Point On The One-yard Line WVONGA Fall Meeting September 11, 2013.
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
Earth and Rockfill Dams
Doosti Dam on shared river of Harirood: A Friendship Bridge Between Iran and Turkmenistan Saeed Nairizi Head of the Board & Managing Director, Toossab.
Lake Livingston Map Cape Royale North Strong North/Northwest Winds ~ 40 to 60 MPH sustained Livingston Dam.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
Conowingo Hydroelectric Power Station and Muddy Run Pump Storage Facility Welcomes the Citizens Advisory Committee.
PRESENTATION ON MANGLA DAM MADE BY: SYED ALI ZULQADAR. ROLL NO: 37.MAJOR: SES 5 th.
Hydropower 1700 ’ s ~ Early 1800 ’ s Bernard Forest de B é lidor, Architecture Hydraulique,
‘The world’s greatest plumbing system’ An example of how a river is managed to use its water as a resource.
Tennessee Valley Authority
Hydro Electricity Generation What is Hydroelectricity?  the production of electrical power through the use of the gravitational force of falling.
Hydroelectric Power
HYDROPOWER DAMS By Hydro Power Group PYP 6 – Sekolah Ciputra
Green Energy Hydro Power (Hydroelectric Inflow Dam System) By IP Management Pte Ltd
Asia Pacific Partnership United States of America Power Generation Task Force August 13 – 17, 2007 Overview of FirstEnergy Pumped Hydro Seneca & Yards.
Hydro Power Plant Prepared by: Nimesh Gajjar
By: Kelsea and Troy.. What is hydropower? Hydropower is energy that comes from the force of moving water. The fall and movement of water is part of a.
The Importance of Hydropower and the Dam of Włoczławek
What is Hydropower? Hydropower ( from hydro meaning water) is energy that comes from the force moving water. The fall and movement of water is part of.
Lake Columbia Water Supply Reservoir Project TWCA March 4, 2010.
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
Emerging Legal Issues Chuck Sensiba, Van Ness Feldman LLP Northwest Hydroelectric Association Annual Conference February 18, 2014.
contents INTRODUCTION. HYDRO POWER PLANT IN INDIA. WORKING.
US Army Corps of Engineers ® Engineer Research and Development Center Coastal and Hydraulics Laboratory Greenup Locks and Dam, Ohio River.
Martin Informational Meeting. May 24, 2007Martin Informational Meeting2 Agenda 9:00 – 9:30 AM Welcome & Overview of the January Issues Identification.
Electric Energy Resources Chris Nelson Commissioner SD Public Utilities Commission October 2012.
Citizens Advisory Committee to the Chesapeake Executive Council November 29, 2012.
Manitoba’s 2011 Flood Mark Lee, M.Sc., P.Eng. Manager, Surface Water Management Manitoba Conservation and Water Stewardship January 29 th, 2013.
Hydro Electric Power Plant
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
Jack W. Tatum Sabine River Authority of Texas Chair – Sabine and Neches Rivers and Sabine Lake Bay Basin and Bay Expert Science Team.
By: Michael Brannon and Anthony Nguyen. Outline:  Advantages/Disadvantages  How it works  Where to find Hydro power  Production time  Energy Provided.
Middle Fork Project Project Description April 25, 2006.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
US Army Corps of Engineers ® Southwestern Division Pacesetters – Army Strong – Engineer Ready! The U.S. Army Corps of Engineers and its Southwestern Division.
Salinity Control on the Pecos River Robert E. Mace, Ph.D., P.G. presented at the Multi-State Salinity Coalition’s Salinity Summit January 26, 2012; Las.
1 Power Resource Management with assistance of Kevin Gawne Karl Reznichek and Dave Cormie.
Controlling Rivers. Niagra Falls
Hydro Power Plants A dam is built to trap water, usually in a valley where there is an existing lake. Water is allowed to flow through tunnels in the dam,
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Shasta County Board of Supervisors March 4, 2008.
1 Institute of Energy & Gia Lam Joint Stock Company Development of Krong Pa 2 and implementation issues Dissemination and Training workshop Hanoi December.
Micro-hydropower for the home, farm, or ranch: A brief overview
KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute.
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
Joint California Energy Commission and California Public Utilities Commission Bulk Storage Workshop November 20, 2015 Kelly Rodgers Energy Program Manager.
Impacts of Salinity on El Paso’s Surface Water Supply presented at the Annual Salinity Management and Desalination Summit December 8, 2003 Michael P. Fahy.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
Hydroelectric Power By: Danasha Harris, Haley King, Sarah Christopher, Peyton Mitchell, and Stephanie Williams.
Teton Basin Study Teton Lake vs Teton Dam.
Reclamation and Hoover Dam It’s All About The Water.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
Paper Presented by At the Zambezi River Basin Stakeholder Conference : 22 – 23 Nov Windhoek, Namibia Eng. S. Z. Mhlanga Senior Manager (Projects.
Warren A. Witt Director of Hydro Operations Ameren Missouri
From: Nuclear Power as a Basis for Future Electricity Generation
NC EMC – Water Allocation Committee
Reservoirs With the exception of Caddo, all of the lakes in Texas are reservoirs, which are artificial lakes used to store water. Reservoirs may be created.
Martin Informational Meeting
Transverse Shear Objective:
Sacramento Municipal Utility District
Presentation transcript:

FERC Scoping Meeting Project No Federal Energy Regulatory Commission Sabine River Authority State of Louisiana & Sabine River Authority of Texas December 16, 2008

Length – 560 miles Drainage Area – 9,952 sq. mi. 25% -Louisiana 75% in Texas Boundary reach covered by Sabine River Compact. Available water is split equally between States. Toledo Bend Dam is located 147 miles from top of Sabine Lake. Sabine River Basin Facts

Toledo Bend Project Owned jointly by –Sabine River Authority State of Louisiana –Sabine River Authority of Texas Operated by the Toledo Bend Joint Operation

Toledo Bend Joint Operation 6 Member Executive Committee 2 Board members appoint from the SRA-TX Board of Directors 2 Board members appoint from the SRA-LA Board of Directors The General Managers of SRA-TX and SRA-LA

Toledo Bend Joint Operation Responsible for setting policy for the operations and maintenance and power sales of the jointly held assets which include the spillway, dam and power house and other related facilities.

65 mile long reservoir 185,000 surface acres 1263 miles of shoreline 4,477,000 acre-feet controlled storage Water Supply and Hydro-Electric Toledo Bend Project

Toledo Bend Dam 11,250 feet long. Max height 112 feet. Top width 25 feet. Rolled earth fill with soil-cement on upstream slope for erosion control.

Toledo Bend Dam Spillway Length – 838 Feet 11 40X28 Foot tainter gates. Low flow sluiceway Design discharge capacity 290,000 cfs

Toledo Bend Hydroelectric Operations Two Vertical Units utilizing Kaplan turbines Authorized installed capacity of 81MW

Toledo Bend Dam Hydroelectric Proposed Mini-Hydro Unit Designed to capture energy associated with routine spillway flow releases. Horizontal Kaplan machine Electric Capacity of MW Annually 5.4 to 7.0 million kW-hrs produced

Turbine Transformer and Control System

FERC License Current license issued in October, 1963 Project became operational in License expires September 30, Filed NOI/PAD September 22, 2008 Prepare relicensing application File license application September, 2011

Additional Information Public Web site Melvin Swoboda or

Toledo Bend Project Tour December 17, 2008 Gather in Lobby 7:45 AM Depart at 8:00 AM Box Lunches will the served Returning at ~ 2:45 PM