LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
1  1 =.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
TQM05 (coil #36) Test Summary 1. TQ coil #36 in a mirror structure Coil #36 tested with a radiation resistant impregnation material 0.7-mm diameter Nb.
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
O X Click on Number next to person for a question.
© S Haughton more than 3?
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
Coil TQ 36 size measurements F. Nobrega/ R. Bossert
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
BNL - FNAL – LBNL - SLAC US LHC Accelerator Research Program LQ Reaction/Impregnation DR’s & Travelers at FNAL CM15 Magnet Systems Working Groups HQ Coils.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev May 7, 2007.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LQ Winding and Curing Tooling Internal Review F. Nobrega, N. Andreev April 9, 2007.
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Week 1.
Number bonds to 10,
We will resume in: 25 Minutes.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
O X Click on Number next to person for a question.
E. Todesco DIPOLES FOR HIGH ENERGY LHC E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Bordini, L. Bottura, G. De Rijk, L. Evans, P. Fessia, J.
1 LARP Magnet Program G. Ambrosio Many slides from (with a few modifications): Jim Kerby for the LARP Magnet Collaboration 25 October 2006 Rad-Hard Insulation.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Long Racetrack (LR) strategy – G. Ambrosio 1 LARP DOE review - FNAL, June 12-14, 2006 BNL - FNAL - LBNL - SLAC OUTLINE: LR R&D goals & plans Long Racetrack.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
F LARP magnet R&D program Giorgio Ambrosio TD/MSD FNAL Annual Program Review September 07 OUTLINE LARP goals FNAL contribution to LARP FNAL core-program.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
BNL - FNAL - LBNL - SLAC Progress Report on LQ Program Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
LQ03 Titanium Pole Length Study Fred Nobrega LQ Collaboration Video Meeting June 27, 2008 BNL - FNAL - LBNL - SLAC.
LQS03 Readiness Review, Feb 21, 2012Introduction – G. Ambrosio 11 Introduction Giorgio Ambrosio LQS03 Readiness Review LBNL February 21, 2012 BNL - FNAL.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
LARP DOE Review, 7/9/2012Long Quadrupole – G. Ambrosio 1 Long Quadrupole Program Giorgio Ambrosio DOE Review of the LARP Program SLAC July 9-10, 2011 LQ.
BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse.
LHC Performance Workshop 2012Nb 3 Sn IR Magnets – G. Sabbi 1 New Magnets for the IR How far are we from the HL-LHC Target? BNL - FNAL - LBNL - SLAC GianLuca.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Long Coil Manufacturing Plan and QA/QC by US HL-LHC-AUP Fred Nobrega / Jesse Schmalzle International Review of the MQXF Inner Triplet Quadrupoles for HL-LHC.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
P. Ferracin on behalf of the MQXF collaboration
BNL Progress with LR, application to LQ
QXF Coil Fabrication & Tooling Reaction / Impregnation
11 T Dipole Integration & Plans M. Karppinen
New Magnets for the IR How far are we from the HL-LHC Target?
Presentation transcript:

LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and Plan Fred Nobrega Long Quadrupole (LQ) Workshop February 7-9, 2007

LM dipole status & plans – Fred Nobrega 2 Long Quadrupole (LQ) Workshop, February 7-9, 2007 LM Status 2m copper cable practice coil impregnation complete 2m (LM01) PIT mirror:  cured, reacted, and impregnation complete  coil measurement complete  begin instrumentation followed by yoke assy 4m (LM02) RRP mirror :  winding tooling ready for installation & shake down Long magnet infrastructure:  ~ 90% complete Dipole Mirror Cross Section Schematic

LM dipole status & plans – Fred Nobrega 3 Long Quadrupole (LQ) Workshop, February 7-9, 2007 LM01, 2m PIT Coil Winding Ceramic cable insulation w/50% overlap.

LM dipole status & plans – Fred Nobrega 4 Long Quadrupole (LQ) Workshop, February 7-9, 2007 LM01, 2m PIT & Coil Lifting Fixture

LM dipole status & plans – Fred Nobrega 5 Long Quadrupole (LQ) Workshop, February 7-9, m Reaction Furnace 6m of thermal load PIT Heat treat cycle 5 witness samples Argon supply line for reaction fixture

LM dipole status & plans – Fred Nobrega 6 Long Quadrupole (LQ) Workshop, February 7-9, 2007 LM01, 2m Coil Heat Treat

LM dipole status & plans – Fred Nobrega 7 Long Quadrupole (LQ) Workshop, February 7-9, 2007 LM01, 2m Coil After Heat Treat LM01 preparation for impregnation.

LM dipole status & plans – Fred Nobrega 8 Long Quadrupole (LQ) Workshop, February 7-9, 2007 LM01, 2m Impregnation Prep.

LM dipole status & plans – Fred Nobrega 9 Long Quadrupole (LQ) Workshop, February 7-9, m O.D. x 8m, t = 60° C, pressure 30  m Hg Vacuum Oven

LM dipole status & plans – Fred Nobrega 10 Long Quadrupole (LQ) Workshop, February 7-9, 2007 LM01, 2m PIT Coil After Impreg.

LM dipole status & plans – Fred Nobrega 11 Long Quadrupole (LQ) Workshop, February 7-9, 2007 LM01 Coil X-Section Measurement TQC coil # 018 Cross section measurements taken in body of coil.

LM dipole status & plans – Fred Nobrega 12 Long Quadrupole (LQ) Workshop, February 7-9, 2007 IB3 Fabrication Floor Jan. 2006

LM dipole status & plans – Fred Nobrega 13 Long Quadrupole (LQ) Workshop, February 7-9, 2007 IB3 Fabrication Floor, Feb 2007

LM dipole status & plans – Fred Nobrega 14 Long Quadrupole (LQ) Workshop, February 7-9, 2007 ICB, LHCIR Quad Production

LM dipole status & plans – Fred Nobrega 15 Long Quadrupole (LQ) Workshop, February 7-9, 2007 ICB, February 2007

LM dipole status & plans – Fred Nobrega 16 Long Quadrupole (LQ) Workshop, February 7-9, 2007 FY07 LM Plan Start (PIT) 2m dipole mirror winding, Oct 2006 Analyze practice coil process results, Nov m winding, curing, impregnation tooling shake down, Nov 2006 Start 4m practice winding, Dec 2006 Test (PIT) 2m dipole mirror, Jan 2007 Complete ICB tooling move to IB3, Jan 2007 Test (RRP) 4m dipole mirror, Jun 2007

LM dipole status & plans – Fred Nobrega 17 Long Quadrupole (LQ) Workshop, February 7-9, 2007 Scale-up Schedule

LM dipole status & plans – Fred Nobrega 18 Long Quadrupole (LQ) Workshop, February 7-9, 2007 Conclusion The scale up of the 1m model PIT magnets to 2m (PIT) & 4m (RRP) long mirror magnets is progressing without major surprises (so far). Design specific long tooling and manufacturing processes are a scale up of the 1m dipole magnet. Long generic tooling is from the LHC quadrupole program and will soon all be in IB3.