Profiting from Connecticut’s C-PACE Financing Program Presented by: Brian McCarter CEO March 19, 2013.

Slides:



Advertisements
Similar presentations
Energy Audit Process For Data Centers Len Kientz
Advertisements

Financing Energy Efficiency: Credit Enhancements and Leveraging Strategies Matthew H. Brown ConoverBrown LLC
Pay-As-You-Save (PAYS®) March 8, 2005 Paul A. Cillo Harlan Lachman Energy Efficiency Institute, Inc.
4 basic approaches to determining energy efficiency benefits (savings) 1.Stipulated or deemed savings 2.Individual Building Metering – Measurement and.
Energy Conservation Energy Management.
1 Energy Efficiency and Iowa Utilities Presentation to the Energy Policy Advisory Forum, convened by Governor-Elect Chet Culver January 4, 2007 Presented.
New Paradigms for Measuring Savings
C-PACE: A financing tool for building owners Clean Energy Finance and Investment Authority.
Financing Energy Efficiency Projects: Credit Enhancements for Commercial Finance September 26, 2011 Presented by: Dan Clarkson Energy Efficiency Finance.
CPUC CSI Workshop CPUC CSI Stakeholder Workshop San Francisco, CA February 15, 2012.
The Power to Make a Difference PPL Electric Utilities April 2010.
FLORIDA PACE FUNDING AGENCY Delivered by SAIC. FloridaPACE.gov 2 FLORIDA PACE FUNDING AGENCY Delivered by SAIC What is PACE? –Property Assessed Clean.
AN OVERVIEW OF PROJECT FINANCE IN PRIVATE-PUBLIC PARTNERSHIPS FINANCE 101 T ERRI S MALINSKY Managing Director B.C.
AECS, LLC Show Me the Money. AECS, LLC Energy Efficiency.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
Energy Financing for Municipalities Andrew Brydges Director, Institutional Programs Clean Energy Finance and Investment Authority (CEFIA) April 2014.
ASSESS TARGET DELIVER MEASURE Understanding Building Energy Audits Joe Hofstetter P.E., CEM, LEED AP Karpinski Engineering.
Property Assessed Clean Energy (PACE) Financing. What is PACE Energy Efficiency and Renewable Energy Financing Private sector buildings Put in place by.
C-PACE: A financing tool for building owners Clean Energy Finance and Investment Authority.
By: R.M. Chitranshi. ECBC With the background of high energy saving potential and its benefits bridging the gap between demand and supply, reducing environmental.
ENPM808W Energy Efficiency/Energy Audit and Conservation Week III, Lecture 1: Energy Audit Procedures and Energy Benchmarking Dr. Michael Ohadi Spring.
ENERGY PERFORMANCE CONTRACTS Field Office Staff Training November 17, 2010 Tedd T. Termunde, P.A Joseph E. Nemedi, F.A.
Welcome Home to Savings Renewable Energy in Subsidized Multifamily Housing Building Revolutionaries.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Overview of Property Assessed Clean Energy (PACE) Program San Antonio Office of Environmental Policy December 16, 2009.
ESTHER TOPOROVSKY Program Director Green Communities.
Energy Performance Analysis with RETScreen
Alabama Department of Economic and Community Affairs.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Economic Realities for Sustainable Real Estate Green Retrofit Lending 34 th Annual Real Estate & Economics Symposium Fisher Center for Real Estate & Urban.
Financing Your Weatherization Projects The Institute for Energy & Sustainability Weatherization Roundtable September 13, 2010 Sam Nutter N.E. Business.
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Need for a Professional Approach in Building Energy Audit Pradeep Kumar Sr. Technical Specialist.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Tax Credits & Financing for Energy Efficiency & Renewable Energy Projects Presented by: The Morgantown Green Team.
Rachel Weaver Program Manager Maryland Energy Administration
Total Energy Usage As A Measure of Building Performance 30% Building Energy Savings Through an Energy Lifecycle Approach to Building Construction, Retro-fitting,
Presented By: Matt Bell Partner, Viridian. Buildings and the Environment Buildings account for 36% of greenhouse gas emissions Buildings account for 72%
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
PACE Technical Standards Eddy Trevino, P.E., Program Manager State Energy Conservation Office August 2015.
Pay As You Save® (PAYS®) March 21, 2006 Fred Zalcman Pace Energy Project Paul A. Cillo Energy Efficiency Institute, Inc.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Sheri Ginett, IIDA, NCIDQ, Interior Architects Carol Fadden, Duke Energy September 9, 2015 OPERATIONAL EXCELLENCE PROGRESSIVE + STRATEGIC WORKPLACE.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Phoenix Convention Center Phoenix, Arizona Facility Energy Audits Mike Gutowski Johnson Controls August 12, 2015 Agency Energy ManagerEnergy Audits: Implementing.
PAGE 1 Sustainable Buildings 2030 © 2008 THE WEIDT GROUP Building Energy Benchmarks THE WEIDT GROUP.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Energy Efficiency Financing October 15, About Virginia Community Capital  Founded in 2006, then Governor Mark Warner privatized $15M state loan.
Comparison of CA Evaluation Protocols, CA Framework, IPMVP and CPUC Policy Manual* A preface to group discussion *In terms of how they define.
Energy Project M&V: Reports that Add Value October 27, 2015.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
Overview for Local Energy Committees February 10, 2016.
Commercial PACE Project Development Presenter: Mike Bahr CEO ReNewAll PACE Nation Summit March 1, 2016.
NORTHWEST ENERGY EFFICIENCY ALLIANCE Community Retrofit Program Residential Advisory Committee Anne Brink February 3, 2011.
Sustainability Summit – April 12, 2016 Beau Engman 825 North Jefferson, Suite 300 Milwaukee, WI 53202
Reduce Your Operating Expenses, Increase Your Profits a Story of Energy Efficiency.
1 Program Overview Part I March 2, Paul Scharfenberger: Director, Finance & Operations, CO Energy Office Chairman, New Energy Improvement District.
Josh Campbell, JD What is PACE? PACE is Property Assessed Clean Energy. PACE is an innovative.
Fort Stanwix National Monument Energy Audit Contract
Seminar On Energy Audit Submitted To: Submitted By:
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
Community Retrofit Program
Keeping PACE on The Texas Border
The ESCO Retrofit Model Financing energy efficient HVAC improvements through ESCOs Stephane le Gentil - November 2017.
EPAD-Louisville 101 EPAD-Louisville 101 Making Cent$ of Energy
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Presentation transcript:

Profiting from Connecticut’s C-PACE Financing Program Presented by: Brian McCarter CEO March 19, 2013

 Connecticut Commercial Property Assessed Clean Energy (C-PACE) Program Background  Power of C-PACE in Commercial Real Estate (CRE)  Benefits to ESCOs, Energy Auditors, Project Developers, Contractors  Underwriting Energy Efficiency Financing  Financial  Technical  Conclusion Overview

 July 2011 – CT passed statewide enabling C-PACE legislation  Clean Energy Finance & Investment Authority (CEFIA) directed to establish & administer the program  Municipalities that “opt-in” are authorized to place a benefit assessment on a property whose owner has secured financing through C-PACE Program Background

Nov 2012 – CEFIA selected 3 rd party program administration team to support technical underwriting process  Buonicore Partners (BP): energy & CRE advisory firm provides C-PACE project management & technical oversight for CEFIA  Celtic Energy: energy engineering consultancy provides BP team’s 3 rd party technical reviews  Sustainable Real Estate Solutions (SRS): software firm powers CEFIA Data Management Platform providing all stakeholders transparent access to technical & financial underwriting data Program Background

C-PACE provides an innovative financing structure enabling commercial, industrial, & multi-family property owners to access financing for qualified energy upgrades and repay through a benefit assessment on their property. Private capital provides 100% long-term funding Repayment through property taxes A senior PACE lien is put on the property and stays regardless of ownership Program Background

 Taxes, to repay assessment, collected in normal course by municipality  Process is entirely consistent with other benefit assessments  The PACE assessment has priority over existing mortgages  The owner must secure written consent from the mortgage holder prior to project approval Program Background

 The goal: Attract private capital to fund EE & RE initiatives  Owners may recruit their own capital providers  8 capital providers have been pre-approved to fund projects Program Background

Anything that saves from baseline  High efficiency lighting  HVAC upgrades  New automated building and HVAC controls  Variable speed drives (VSDs) on motors fans and pumps  High efficiency chillers, boilers, and furnaces  High efficiency hot water heating systems ECM Upgrades: What’s Eligible? … as long as it isn’t going anywhere  Combustion and burner upgrades  Fuel switching (e.g., oil to gas)  Water conservation  Heat recovery and steam traps  Building enclosure/envelope improvements  BMS  Renewable energy systems

 Appliances, e.g., refrigerators, dishwashers, etc.  Plug load devices  Vending machine controls  Any package of measures with a weighted average effective useful life (EUL) that does not meet or exceed life of the loan  Any package of measures that does not achieve an energy savings to investment ratio > 1 ECM Upgrades: What’s Not Eligible?  Any measure that is easily removed/not permanently installed  Any measure that does not result in improved energy efficiency  Extending natural gas lines to a property line to enable a PACE-eligible gas conversion project.

 Capital improvements without capital expense  100% of project cost covered  Engineering and construction costs  Energy audits  Renewable energy feasibility studies  Post-construction measurement & verification of energy savings  PACE assessment is an obligation of the property, not the owner  Repayment made through property tax bill The Power of C-PACE Financing

 Property tax payments may qualify as an operating expense  Obligation not accelerated at the time of sale  Tax payments may be passed through to tenants who enjoy the benefits  Long-term financing  Energy savings will exceed investment cost  Well-developed projects can achieve positive cash flow from day one  Increases building value  Enhances building’s competitive position in the marketplace The Power of C-PACE Financing

 CEFIA:  Acts as a conduit for private investment  Encourages CRE owners to arrange their own financing  Can connect owners to capital providers  CRE owners:  Negotiate rate, terms, conditions & schedules with capital provider  Can undertake deeper more capital intensive retrofits with greater savings potential & longer payback periods The Power of C-PACE Financing

Deeper energy retrofits with longer payback times can be pursued Facilitates new energy efficiency projects or re-activates projects that had been put on hold due to the “Great Recession” Market expansion beyond MUSH market to the much larger multi- tenant CRE market where turnover is more frequent and property owner credit quality may not be investment grade (single purpose LLCs) Whole building or targeted ECM retrofits (“pent-up demand”) Cost of up-front energy audits, renewable energy feasibility studies and M&V costs can be bundled into the financing Win-win for everyone! Benefits to Auditors, ESCOs & Prj Developers

 Financial  Technical C-PACE Underwriting Standards

Benefit assessment holds a senior (priority) position Consent of property mortgage holder required Total savings over the financing term must exceed the total project investment (SIR > 1) C-PACE may not be ideal for highly leveraged properties where existing debt plus a C-PACE assessment is greater than the property value CEFIA conducts review, including building’s debt, equity, income, & occupancy C-PACE Financial Underwriting

Property must have clear title with no encumbrances Property taxes should be current There should be no outstanding tax liens or notices of default Mortgage payments must be current No easements or subordination agreements that would conflict with PACE assessment Project useful life must be longer than the financing term C-PACE Financial Underwriting

Key challenge: “Will the projected energy savings be realized?”  Problem #1: Energy savings can’t be measured directly  Problem #2: No standard methodology to underwrite energy efficiency  Problem #3: Without a solution to #1 & #2, EE Financing cannot become a mainstream financial asset class with a high degree of standardization, predictability and scale that attracts capital providers No longer true today! C-PACE Technical Underwriting

Nationally recognized technical standards define the process from data collection to energy savings measurement and verification  Energy savings can be forecast with a high degree of confidence  Actual energy savings performance can be measured and verified in a reliable, consistent and fully-transparent manner  Risk of underperformance is low C-PACE Technical Underwriting

 Rely on three established industry protocols:  ASTM Building Energy Performance Assessment Standard E Methodology for collecting & analyzing baseline energy data  ASHRAE Level I, II, III Energy Audit Guidelines Methodology to identify energy conservation measures (ECMs) & project energy savings with high degree of confidence  International Performance Measurement & Verification Protocol (IPMVP) Methodology for energy savings measurement & verification  Underwriting methodology is technically sound, standardized, reliable & fully-transparent C-PACE Technical Underwriting

Project data are entered & tracked in CDMP for use by all deal stakeholders across the entire project life cycle  Project development through M&V  Powered by SRS’s cloud-based software platform  Facilitates consistency & transparency  Compliance with 3 industry protocols CEFIA Data Management Platform (CDMP)

 All deal stakeholders have access to CDMP  CEFIA  Building owner  Capital provider  Auditor, ESCO, Project Developer, Contractors  Insurer (where Energy Savings Insurance is used)  CDMP follows the project post-installation through M&V  CDMP meets reporting needs of multiple interdependent stakeholders CEFIA Data Management Platform (CDMP)

Calculate Baseline Performance CDMP enables auditor upload of utility bill data in excel format Normalize for calendar month, weather, occupancy, etc.

Recommend ECMs CDMP enables auditor upload of ECM data in excel format Create scenarios to determine optimized bundle of ECMs

Project Energy Savings Scenarios

Calculate Key Financial Metrics CDMP enables capital provider financial underwriting

Project Cash Flows over C-PACE Term CDMP enables capital provider financial underwriting

Financials establish loan amount & term CEFIA facilitates interest from capital providers, where needed Provide CDMP technical & financial underwriting data access Include credit enhancements (performance guarantees, insurance) Owner secures most “commercially-attractive” financing Existing mortgage holder 3 rd party capital provider ESCO arranged Secure “Commercially-Attractive” Financing

Measure & Verify Energy Savings

 Beacon Falls  Bridgeport  Durham  Hartford  Middletown  Norwalk  Old Saybrook  Southbury Coming soon: Waterbury, East Granby, Fairfield, Manchester, Wethersfield, New Haven, Meriden, Plymouth, Cheshire, Putnam  Simsbury  Stamford  Stratford  West Hartford  Westport  Wilton  Windham Municipalities Opting in to C-PACE (as of Mar 2013)

 C-PACE technical underwriting enables energy savings to be forecast with a high degree of confidence resulting in a low risk of underperformance  Actual energy savings performance can be measured and verified in a reliable, consistent and fully-transparent manner  C-PACE is enabling EE financing to become a mainstream financial asset class with high degree of standardization, predictability & scale  C-PACE financing structure is very attractive to CRE owners and provides “an offer that is very difficult to refuse”  C-PACE represents a significant opportunity for ESCOs, auditors, project developers, consultants and contractors to increase their CRE business Summary

 First round of training sessions:  March 22, 2013Berlin, CT  March 26, 2013Norwalk, CT  April 1, 2013Berlin, CT  Registration link and application on Auditor, Contractor & ESCO C-PACE Training

Understanding Connecticut’s C-PACE Technical Requirements Presented by: Paul Popinchalk Director of Engineering March 19, 2013

C-PACE Program Industry Protocols  ASTM Building Energy Performance Assessment Standard E  Methodology for collecting & analyzing baseline energy data  ASHRAE Level I, II, III Energy Audit Guidelines  Methodology to identify energy conservation measures (ECMs) & project energy savings with high degree of confidence  International Performance Measurement & Verification Protocol (IPMVP)  Methodology for energy savings measurement & verification

ASTM BEPA Standard to Establish Energy Use Baseline What was the Problem? What is the “building’s energy consumption? Sounds simple, but “the devil is in the details” Lack of standardization to collect and analyze building energy use ■ No consistent and transparent methodology existed for building energy use data collection to establish baseline conditions!

What does the ASTM BEPA “Standardize” in the Baseline? The time frame over which data needs to be collected 3 years or back to last “major renovation” if less than 3 years, with a minimum of 1 year of data meeting reliability criteria What constitutes a “major renovation” ■ A renovation involving expansion (or reduction) of a building’s gross floor area by 10% or more, or any renovation impacting total building energy use by more than 10%) What weather data needs to be collected, from where and how it is to be statistically analyzed to establish baseline conditions (minimum 10 years HDD & CDD data from nearest weather station with historical data) How the building energy use equation is developed (relating energy use to the independent variables that impact energy use)

What does the ASTM BEPA “Standardize” in the Baseline? What constitutes an appropriate range for building energy use ■ An upper limit with independent variables at the 75 th percentile ■ A lower limit with independent variables at the 25 th percentile What constitutes the most representative value for building energy use (for benchmarking purposes) ■ Pro forma building energy use (based on mean values for independent variables) Identifies criteria for collecting reliable building energy use data…

Criteria for Collecting Reliable Energy Use Data No “major renovations” in time period A minimum of 10 years of weather data from the nearest weather station (with historical data) to the building Special criteria if only 12 months of energy use data is collected (non-weather independent variables must be within 15% of the monthly average determined over the previous 3 years) Qualified professionals used for data verification (such as for gross floor area calculation, definition of vacant space, identification of pertinent building characteristics, electric meter box coverage, energy use in parking areas, major building energy use systems, independent variables impacting building energy use, etc.)

ASTM BEPA Standard Components Complements the ASHRAE Energy Audit: Site Visit & Building “walk-through” (already part of the energy audit scope of work) Interviews (already part of the energy audit scope of work) Records Collection & Compilation (already part of the energy audit scope of work) Records Review & Analysis (already part of the energy audit scope of work)

Summary of ASTM BEPA Methodology Develops building energy use baseline (energy use (total, fuel, electricity) as a function of independent variables impacting energy use) Can be used to project building energy use without ECMs installed Uncertainty analysis can be incorporated (by evaluating the standard deviation comparing actual energy use against projected energy use and selecting a confidence level) Determines normalized building energy use metrics (such as EUI, kBTU/SF-yr) for benchmarking

Benchmarking ■ Select one or more benchmarking models/databases as appropriate  CBECS (2003)  State-developed Benchmarking Initiatives (e.g., CA)  Energy Star (derived from CBECS)  Consultant’s Internal Benchmarking Data  Building Owner’s Internal Benchmarking Data  Commercial benchmarking services ← Selected by C-PACE ■ Benchmark against “peer” buildings  Building Total EUI  Building Fuel EUI  Building Electricity EUI

Energy Audit What’s done in an energy audit?  Establish baseline building energy use  Quantify energy use according to major building function  Benchmark against peer buildings  Recommend ECMs, project energy savings, estimate project cost and determine key financial metrics

Energy Audit cont’d ASHRAE provides guidelines for 3 types of energy audits:  Level I – “Walk-through Analysis” or “Preliminary Audit”  Level II – “Energy Survey and Analysis” or “Comprehensive Audit”  Level III – “Detailed Analysis of Capital-Intensive Modifications” or “Investment Grade Audit”

ASHRAE Level I Energy Audit  Building description  On-site walk-through (typically one day)  Collect historic building energy use and cost data  Benchmarking analysis  Identify potential ECMs and typical energy savings  Prioritize energy savings opportunities for further investigation (Level II Audit)

ASHRAE Level II Energy Audit  More comprehensive on-site survey (up to 1 week)  In depth analysis of historic building energy use and cost data (interval data, if available)  Identify energy savings opportunities (ECMs)  Identify ECM EULs and degradation factors  Project energy savings (building modeling)  Estimate costs (including incentives/rebates)  Recommend ECMs meeting criteria  Investment and cost savings analysis

ASHRAE Level III Energy Audit (IGA)  More comprehensive than Level II audit to bring a highest level of confidence  Generally for very capital intensive projects  More detailed field data gathering and more rigorous engineering analysis over a longer period of time (typically up to a month)

M&V Plan (C-PACE Requires Upfront)  Goal and objectives  ECM description and operation  Recommended M&V approach (IPMVP?)  Data analysis procedures and algorithms  Field monitoring (data points)  Reporting (CDMP)

IPMVP for M&V: Four Options (1) Option A: Retrofit Isolation - Key Parameter Measurement (e.g., a lighting retrofit where power draw is the key performance parameter measured, but where interactive impacts, to heating and cooling loads, can be calculated) (2) Option B: Retrofit Isolation - All Parameter Measurement in the field (e.g., install variable speed drive and controls to a motor, and measure electric power with a kW meter installed on the electrical supply to the motor) (3) Option C: Whole Facility - when a multifaceted energy management program affecting many interrelated systems is installed, and gas & electric utility meters exist to measure energy use at the facility (4) Option D: Calibrated Simulation (e.g., a multifaceted energy management program affecting many interrelated systems is installed, but no meters exist and building simulation model must be developed – such as for a new building or a college campus with central utility metering and no metering at individual buildings)

Option C-Usually Best for Commercial Whole Building Energy Retrofits  Multiple ECMs retrofitted in a commercial building (such as an office building, a hotel or a retail building)  ECMs involve activities whose individual energy use is difficult to separately measure (e.g., window upgrades)  Interactive effects or interactions between ECMs can be substantial  Historic energy use data exists (to establish the baseline)  Reasonable correlations can be developed relating building energy use to independent variables

IPMVP General Framework for Commercial Buildings: Pre-ECM Installation  Use energy audit to establish baseline energy use profile prior to installation of ECMs  Use baseline to project energy use into the future (over the “reporting period”) had the ECMs not been installed  Use baseline to project energy use into the future (over the “reporting period”) with the ECMs installed  Projected savings (“avoided energy use”) is difference between expected energy used assuming ECMs not installed and expected energy use assuming the ECMs installed (with both calculated under the same conditions)

IPMVP General Framework for Commercial Buildings: Post-ECM Installation  Determine actual energy use in the “reporting period” with the ECMs installed  Use baseline to project energy use in the “reporting period” had the ECMs not been installed (calculated under the same conditions experienced while collecting actual energy use data)  Savings (“avoided energy use” in the “reporting period”) is difference between projected energy use had ECMs not been installed and the actual energy use after ECMs installed

ECM Performance Verification

 Visit C-PACE program website:  Genevieve Sherman: CEFIA Manager, C&I Property Assessed Clean Energy   Direct phone:  Brian Burstiner: SRS Director of Sales   Direct phone:  Paul Popinchalk: Celtic Energy, Director of Engineering   Direct phone: Additional Information & Contacts