Doc.: IEEE802.11-13/0517r0 May 2013 Submission Slide 1 Authors: Combining Process in Virtual CS Mechanism for 802.11ah Date: 2013-05-06 Lv kaiying, ZTE.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /272a Submission June 2001 S. Choi, Philips Research Slide 1 Problems with IEEE (e) NAV Operation and ONAV Proposal Javier del.
Advertisements

Doc.: IEEE /0104r1 SubmissionLiwen Chu Etc.Slide 1 Fragmentation with A-MPDU Date: Authors: Date: Jan, 2012.
Doc.: IEEE /0509r0 SubmissionSlide 1 Short Management and Short A-MSDU Frame Date: Authors: Liwen Chu, ST May 2013.
Doc.: IEEE /0527r0 Submission March 2010 Slide 1 A Periodic 5 MHz Measurement Pilot for Channel Scan Date: Authors:
Doc.: IEEE /412r0 Submission S. Choi, Philips Research July 2001 Slide 1 Aligning e HCF and h TPC Operations Amjad Soomro, Sunghyun.
Doc.:IEEE /0859r0 July 2012 Simone Merlin, Qualcomm Inc Short Block Ack Date: Authors:
Submission doc.: IEEE 11-14/0802r0 Consideration on UL MU transmission Date: Slide 1Jinyoung Chun et. al, LG Electronics July 2014 Authors:
Doc.: IEEE /0627r00 Submission Yuichi Morioka, Sony Corporation Date: Why we need Length Field in VHT SIG May 2010 Slide 1 Authors:
Doc.: IEEE /1515r0 Submission November 2011 Timo Koskela, Renesas Mobile CorporationSlide ah Wi-Fi Offloading Considerations Date:
Doc.: IEEE /1355r2 11ah Submission Date: Authors: Nov 2012 James Wang, MediaTek Slide 1.
Doc.: IEEE /0295r0 Submission PRAW Follow Up Date: Authors: March 2013.
Doc.: IEEE /0613r0 Submission May 2012 Ron Porat, Broadcom US Channelization Date: Authors: Slide 1.
Doc.: IEEE /0074r0 Submission NDP Type PS-Poll Frame Follow-Up Date: Authors: Slide 1Young Hoon Kwon, Huawei.
Submission doc.: IEEE 11-13/0070r1 Enabling AP Sleep Date: Authors: Jafarian, Qualcomm Slide 1 January 2013.
Doc.: IEEE /0798r1 Submission July 2008 L. Chu Etc.Slide 1 HT Features in Mesh Network Date: Authors:
Doc.: IEEE /630r1a Submission S. Choi, Philips Research November 2001 Slide 1 HC Recovery and Backoff Rules Sunghyun Choi and Javier del Prado.
Doc.: IEEE /1294r0 Submission September 2011 Rolf de Vegt, QualcommSlide 1 Spec Framework Text for.11ah Bandwidth Modes Date: Authors:
Doc.: IEEE /1345r0 Submission November 2013 Jiamin Chen, HuaweiSlide 1 Dynamic Channel Transfer(DCT) Procedure for IEEE aj ( 60GHz New Technique.
ZTE corporation doc.: IEEE /1086r2 September 2012 Submission TIM Compression for No Buffered Unicast Traffic Date: Slide 1 Authors:
Doc.: IEEE /0342r0 SubmissionLiwen Chu Etc.Slide 1 Power Efficient PS Poll Date: Authors: Date: March, 2012.
Doc.: IEEE /0608r2 Submission May 2012 Shoukang Zheng et. al, I2R, SingaporeSlide 1 Low-Power PS-Poll Date: Authors:
Submission doc.: IEEE /0328r0 Nokia Internal Use Only March 2012 Slide 1 Date: Authors: PS-Poll Enhancements Chittabrata Ghosh, Nokia.
Doc.: IEEE /0881r0 Submission July 2012 Anna Pantelidou, Renesas Mobile CorporationSlide 1 PS Mode Enhancements with Timing Indication Date:
Submission doc.: IEEE 11-12/1329r0 PS-Poll for Downlink Bufferable Units Date: Slide 1Eric Wong, Broadcom November 2012 Authors:
Doc.: IEEE /1325r0 Submission Nov PS-Poll TXOP Date: Authors: David Xun Yang, Huawei, et. al.Slide 1.
PS-Poll TXOP Using RTS/CTS Protection
Doc.: IEEE /0324r0 Submission Slide 1Michelle Gong, Intel March 2010 DL MU MIMO Error Handling and Simulation Results Date: Authors:
Doc.: IEEE /0567r0 Submission Slide 1Michelle Gong, Intel May 2010 DL MU MIMO Analysis and OBSS Simulation Results Date: Authors:
Submission doc.: IEEE 11-12/772r0 July 2012 Jarkko Kneckt, NokiaSlide 1 Non-HT Duplicate PPDU FILS Advertisement Frame Date: Authors:
Doc.: IEEE /630r4a Submission S. Choi, Philips Research January 2002 Slide 1 HC Recovery and Backoff Rules Sunghyun Choi and Javier del Prado.
Doc.:IEEE /0037r0 Submission Jan. 17, 2011 Yong Liu, MarvellSlide 1 BW Indication in Non-HT Frames Date: Authors:
Doc.: IEEE /1278r0 Submission BSS load balancing for MU-MIMO Date: Authors: Nov 2010 Slide 1Daewon Lee, LG Electronics.
Doc.: IEEE /1123r0 Submission September 2010 Zhu/Kim et al 1 Date: Authors: [TXOP Sharing for DL MU-MIMO Support]
Doc.: IEEE /1244r1 Submission Nov.2010 Sun Bo, ZTE CorpSlide 1 Authors: Transmission Mechanism in MU-MIMO Date:
Slide 1 doc.: IEEE /1092r0 Submission Simone Merlin, Qualcomm Incorporated September 2010 Slide 1 ACK Protocol and Backoff Procedure for MU-MIMO.
Doc.: IEEE /0606r1 Submission Uplink Channel Access Date: Authors: May 2012 Minyoung Park, Intel Corp.Slide 1.
Doc.: IEEE /0440r1 Submission July 2013 Jiamin Chen, HuaweiSlide 1 Dynamic Channel Transfer(DCT) procedure for IEEE aj ( 60GHz ) Date:
Submission doc.: IEEE /0327r0 March 2015 Jarkko Kneckt, NokiaSlide 1 Microsleep for HE STA Date: Authors:
Doc.: IEEE /1190r2 September 2014 Submission Kaiying Lv (ZTE) Frame Exchange Control for Uplink Multi-user transmission Slide 1 Date:
Channel Sensing in UL-OFDMA
Submission doc.: IEEE /0567r0 May 2015 Xiaofei Wang (InterDigital)Slide 1 Multi-STA BA for SU Transmissions Date: Authors:
Doc.: IEEE /219r0 Submission Mar 2004 Masahiro TAKAGI, ToshibaSlide 1 Requirements for MAC / PHY Simulation Interface Masahiro TAKAGI
Submission doc.: IEEE 11-13/0288r0 TXOP Sharing Operation for Relay Date: Slide 1Eric Wong, Broadcom Authors: March 2013.
Doc.: IEEE /0094r2 Submission Jan 2012 Slide 1 Authors: MAC Header Design for Small Data Packet for ah Date: Lv kaiying, ZTE.
Doc.: IEEE /0840r1 Submission AP Assisted Medium Synchronization Date: Authors: September 2012 Minyoung Park, Intel Corp.Slide 1.
Submission doc.: IEEE /1289r2 Michelle Gong, IntelSlide 1 RTS/CTS Operation for Wider Bandwidth Date: Authors: Nov
Submission Jul 2012 doc.: IEEE 11-12/0842r0 ZTE CorporationSlide 1 Short Beamforming Report Poll Frame Date: Authors:
Submission doc.: IEEE /1348 Multiple NAVs for Spatial Reuse Date: Slide 1IITP Authors: Nov 2015 NameAffiliationAddressPhone Evgeny.
Submission doc.: IEEE /0615r0 May 2012 Sudheer Grandhi, InterDigital CommunicationsSlide 1 Considerations for early NAV indication Date:
Doc.: IEEE /0409r6 Submission July 2012 Shoukang Zheng et. al, I2R, SingaporeSlide 1 Channel Access Supporting Low Power Operation Date:
Doc.: IEEE /1086r0 SubmissionSlide 1 Date: Authors: Improved Virtual Carrier Sensing Mechanism for 45GHz Sep ZTE Corp.
Submission doc.: IEEE /0098r0 January 2016 Assaf Kasher, IntelSlide 1 Channel bonding proposals Date: Authors:
Resolutions to Static RTS CTS Comments
Doc.: IEEE /0409r5 Submission May 2012 Shoukang Zheng et. al, I2R, SingaporeSlide 1 Supporting Low Power Operation Date: Authors:
Doc.: IEEE /0662r2 Submission May 2012 Wai-Leong Yeow, I2R Singapore Slide 1 Block ACK Transmission Date: Authors:
Submission doc.: IEEE /1340r2 November 2015 Narendar Madhavan, ToshibaSlide 1 NDP Announcement for HE Sequence Date: Authors:
Submission doc.: IEEE /1309r0 November 2012 Non-TIM Mode Negotiation Date: Slide 1 Authors: Kaiying Lv, ZTE.
Submission doc.: IEEE /0662r0 May, 2016 Jing Ma, NICTSlide 1 Further consideration on channel access rule to facilitate MU transmission opportunity.
Submission doc.: IEEE /0087r1 January 2016 Jinsoo Ahn, Yonsei UniversitySlide 1 NAV cancellation issues on MU protection Date: Authors:
Doc.: IEEE /1034r0 Submission September 2015 Yongho Seok, NEWRACOM Notification of Operating Mode Changes Date: Authors: Slide 1.
ACK Indication and EIFS
Virtual CS during UL MU Date: Authors: March 2017
MAC Clarifications Date: Authors: September 2016
Duration/ID field in UL-MU
Explicit Block Ack Request in DL MU PPDU
[Multi-RTS Proposal] Date: Authors: September 2010
Considerations on MU-MIMO Protection in 11ac
OBSS_PD simplification
NAV Update Rule Considering UL MU Operation
Utilizing Unused Resources by Allowing Simultaneous Transmissions
Presentation transcript:

Doc.: IEEE /0517r0 May 2013 Submission Slide 1 Authors: Combining Process in Virtual CS Mechanism for ah Date: Lv kaiying, ZTE Corporation

Doc.: IEEE /0517r0 May 2013 Submission Slide 2 Abstract Lv kaiying, ZTE Corporation This contribution provides specific process for combining RID and NAV in the virtual carrier sense (CS) mechanism used for ah STAs.

Doc.: IEEE /0517r0 May 2013 Submission Lv kaiying, ZTE Corporation Virtual CS mechanisms for ah (1/2) The current SFD has defined that two virtual CS mechanisms shall be provided by the MAC. − The first mechanism is referred to as the NAV mechanism. − The second virtual CS mechanism is referred to as the Response Indication Deferral (RID). − The CS mechanism combines the NAV state, RID and the STA's transmitter status with physical CS to determine the busy/idle state of the medium. Slide 3

Doc.: IEEE /0517r0 May 2013 Submission Lv kaiying, ZTE Corporation Virtual CS mechanisms for ah (2/2) RID begins immediately after the reception of a frame with RXVECTOR parameter ACK_INDICATION that has a value of ACK or BA or Not ACK, BlockAck or CTS. A STA that is undergoing RID shall not initiate a non-response transmission. Slide 4

Doc.: IEEE /0517r0 May 2013 Submission Lv kaiying, ZTE Corporation Comparison of two Virtual CS mechanisms The features of RID mechanism are: − The value of RID is obtained based on a rough estimation. When ACK_INDICATION is Not ACK, BlockAck or CTS, RID continues for MAX_PPDU + ACK + 2 * SIFS or until PHY-RXSTART.indication, whichever comes first. − The value of RID is always updated after the reception of a frame with RXVECTOR parameter ACK_INDICATION. The features of NAV mechanism are: − The value of NAV is accurate based on the “Duration” field of the received frame. − STAs update their NAV with the received Duration field only when the new NAV value is greater than the current NAV value. Slide 5

Doc.: IEEE /0517r0 May 2013 Submission Lv kaiying, ZTE Corporation Issue and Solution Principle The current SFD has defined that “The STA combines the NAV state, RID and the STA's transmitter status with physical CS to determine the busy/idle state of the medium”. However how to perform the combining process is not specified. As one principle for the combining process, when Duration is available in the received frame, it’s preferred to use Duration instead of RID since Duration is more accurate than RID to determine the medium state. If a third-party STA only obtains ACK_INDICATION − the Virtual CS mechanism should be based on both NAV and RID, and − the CS mechanism shall combine the conditions NAV != 0, RID != 0, STA’s transmitter status = “not transmitting” with physical CS = idle to determine the busy/idle state of the medium. If a third-party STA obtains both of ACK_INDICATION and Duration from a received frame, − the Virtual CS mechanism should be based on NAV only, and − the CS mechanism shall combine the NAV!=0 and the STA‘s transmitter status = “not transmitting” with physical CS = idle to determine the busy/idle state of the medium. Slide 6

Doc.: IEEE /0517r0 May 2013 Submission Lv kaiying, ZTE Corporation Proposal We propose an unified combining process as follows: −the Virtual CS mechanism should be based on both NAV and RID, and −If the STA obtains both ACK Indication and Duration from the single reception, the STA shall reset RID to zero. −The medium condition at the MAC is BUSY if PHY_CS indicates BUSY or the NAV counter has a non-zero value or the RID counter has a non-zero value or STA transmitter status is equal to “transmitting”. −MediumBUSY = (PHY_CS == BUSY) OR ( NAV != 0) OR (RID != 0) OR (STA transmitter status == transmitting) Slide 7

Doc.: IEEE /0517r0 May 2013 Submission Lv kaiying, ZTE Corporation Conclusion In this contribution, we proposed to specify how a STA combines the RID, NAV and the STA‘s transmitter status with physical CS to determine the busy/idle state of the medium with an unified combining process. Slide 8

Doc.: IEEE /0517r0 May 2013 Submission Straw-Poll Do you support the unified CS mechanism combing process as defined in slide 7? Y N A Lv kaiying, ZTE CorporationSlide 9

Doc.: IEEE /0517r0 May 2013 Submission References [1] IEEE Std ™-2007 [2] IEEE /1137r14SFD Lv kaiying, ZTE CorporationSlide 10

Doc.: IEEE /0517r0 May 2013 Submission Thank you! Lv kaiying, ZTE CorporationSlide 11