STATUS OF ASME CC N-755 & N-808 Frank J Schaaf, Jr Sterling Refrigeration Corp NESCC Meeting Washington DC 18 April 2013.

Slides:



Advertisements
Similar presentations
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Advertisements

AS9102 First Article Inspection Report
An Outline for: A User-Based Systems Approach to the Evaluation, Selection, and Institutionalization of Safer Medical Devices.
WELD TEST SPECIFICATIONS TOPICS COVERED IN THIS PRE TEST BRIEFING: ASME SECTION IX CODE WELD TEST SPECIFICATIONS VISUAL INSPECTIONS SAFETY IN WELDING.
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Transition from Q1- 8th to Q1- 9th edition
Engineering Perspectives on First Year of New Reactor Construction Mohamed Shams, Ph.D., PE Structural Engineering BC US NRC, Office of New Reactors July.
American Welding Society Nashville Section
ASME Liaison Report to CRE May 18, 2011 Urey R. Miller, P.E.
PHMSA Perspectives Construction Process & Standards
1. The student will be able to describe: ◦ the history of ASME and the National Board ◦ the history of the National Board Inspection Code ◦ how the NBIC.
NRC* Perspective on HDPE Road Maps Eric Focht, Materials Engineer U. S. Nuclear Regulatory Commission Office of Nuclear Regulatory Research Division of.
POLICY & PROCEDURE NCPWB WELDER PERFORMANCE QUALIFICATIONS
Engineering Technology Division
Morrow Equipment C O M P A N Y, L. L. C. Peter Juhren Corporate Service Manager Morrow Equipment Co. L.L.C. Salem, OR USA Peter Juhren Corporate Service.
Gas Transmission Pipelines
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
RIM ) - REWRITE OF SECTION XI, DIVISION II, USING RISK INFORMED METHODOLOGY - FRANK J. SCHAAF,JR, P.E. ASME CHAIRMAN, SWGRIM CONSULTANT, STERLING REFRIGERATION.
Weld Inspection Basics
Steve Lefler - Principal Engineer Duke Energy
ISO 9000 Certification ISO 9001 and ISO
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
First Article Inspection
Tim Haeberle API SC Winter Meeting
November 7, Status * Task group initiated in November * Steering Committee requested a summary report in July * Summary report deemed.
Materials Bratislava 11/12/13 April 2005 Presented by Peter Hanmore For the benefit of business and people TAIEX Workshop on the Pressure Equipment Directive.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
Certificate in Pipeline Construction, Welding & Inspection LECA LEXTON ENERGY CORPORATE ACADEMY Copyright 2013 Lexton Energy Incorporated PCWI delivered.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
NE 127 – Codes, Standards, and Regulations NDT & QA/QC Standards: ISO, ANSI, ATA, AIA, IEEE, etc. INSTRUCTOR: Chattanooga State CC.
Summary of NRC HDPE Piping Confirmatory Research Activities NESCC HDPE Piping Road Map Workshop April 18, 2013 Washington, D.C. Eric Focht, Materials Engineer.
2010 CDBG Recipients’ Workshop The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
Welding Inspection and Metallurgy
Techair – we take care On the other side of the 337 what your client does when he gets a mod and how we can produce better mods to help him John Aplin.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
1 PED: equivalent overall level of safety PED Annex 1, clause 7: The following provision apply as a general rule. However, where they are not applied,
1 Meeting on April 18, 2013 Washington DC Workshop on a Joint HDPE Roadmap for Current and Future Service.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Approvals and Permits Division Isreal Mallard Transportation Specialist,
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS Bureau Drive Gaithersburg, MD (301)
ASME BOILER & PRESSURE VESSEL CODE AN INTERNATIONAL STANDARD
ASME OM CODE CASES Presented by Jeff Neyhard for Ron Lippy Intro 101???
BY: Winston G. Smith Environmental Engineer UST/PCB & OPA Enforcement & Compliance Section EPA Region 4.
Sub Committee 6 Ballot resolution Summary June 2012 Mike Briggs.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
Program Planning and Budget Amy Wilson Senior Program Officer International Education Programs Service.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
Quality Assurance National Nuclear Standards C. H. Moseley, Jr. 33 rd National Energy & Environmental Conference August 28, 2006.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
CODES FOR VESSELS/HEAT EXCHANGERS Avinash Nayak. (46) Shrikantkumar Padhy (47) Jitendra Patil (48) Manoj Patil (49) Ganeshprasad Pavaskar (51)
Service is the difference MEA Roundtable October 30, 2007.
WELDING PROCEDURES and WELDERS QUALIFICATION
QUALITY 10 July 2015 CORP 3268 – DIGITAL TRANSDUCERS.
The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Founded in 1880 as the American Society of Mechanical Engineers
مرکز پژوهش و مهندسی جوش ايران تابع سازمان گسترش و صنایع نوسازی ایران
Third Party Activities for FH1 Project
Acceptance Process for Manufactured Products by Certification:
Impact on SC 6 Documents by Kenneth Young
Ageing Management Session Name: Principles of Ageing Management
Plastic Pipe Rule – Tracking and Traceability Proposed Requirements
API STANDARD 1104 Welding of Pipelines and Related Facilities
For the benefit of business and people
Impact on SC 6 Documents by Kenneth Young
Quality Assurance for Emulsified Asphalt Surface Treatments
Corrective Action Response Guidelines For TCEQ Accredited Laboratories
Civil/Structural Engineering
Gas Transmission Pipelines
Presentation transcript:

STATUS OF ASME CC N-755 & N-808 Frank J Schaaf, Jr Sterling Refrigeration Corp NESCC Meeting Washington DC 18 April 2013

STATUS OF ASME CC N-755 & N-808 Disclaimer This presentation is the intellectual property of Frank Schaaf. The comments made are his alone, Project Manager of CC N-808, and are not an ASME official position.

STATUS OF ASME CC N-755 & N-808 Presentation Elements Reason for N-755 Separation Code Case Format CCN Fusing Issue UT Examination Issue

STATUS OF ASME CC N-755 & N-808 During approval of Revision 1 of CC N-755, negative was received, requiring Owners to procure PE material in accordance with Section III requirements. The negative could not be cleared, Individual felt Owner’s should procure same method as Section III. The Chairmen of Section III and Section XI decided to separate CC N-755 into two Code Cases.

STATUS OF ASME CC N-755 & N-808 First effort had N-808 detailing only the differences between Section XI (Owner) and Section III Both Cases were locked, so the technical requirements were matched and locked together. Section XI, added UT examination based on Appendix VIII and Callaway experience. Approval of N-808 was taking longer and impacted N-755 revision At the February 2013, BNCS meeting, it was decided to remove the lock on both Code Cases, and each Section would pursue their own Case.

ASME CC N-808 Code Case Format Case Layout (Based on Section III & CC N-755)) CC Inquiry & Reply (Buried Pipe Only) 1000 General Requirements (IWA-4000, NCA and ND) 2000 Material (Technical (Mech. Properties, Fusing Qualification and QA) 3000 Design 4000 Installation (Section IX – Fusing) 5000 NDE (UT Examination) 6000 Pressure Test 8000 Stamping

ASME CC N-808 Code Case Format Case Layout (Based on Section III) Appendixes Mandatory Appendix I – Forms Required for fabricated product off site using the fusing process Non-Mandatory Appendix A – Unacceptable Fused Joints Required to support visual examination

ASME CC N-808 Code Case Format Case N-755 Appendixes eliminated Appendixes - Mandatory Mandatory Appendix I Fusing – Adopted Section IX to be published in July 2013 Mandatory Appendix II Standards – Moved to General Requirements Mandatory III Forms – Moved to Appendix I Mandatory IV PE Material – Moved to of Case

ASME CC N-808 Code Case Format Case N-755 Appendixes eliminated Appendixes – Non-Mandatory Appendix A, Training – Adopted Section IX Appendix B, Data Logger Review – Eliminated, may add the Section IX, Data Logger Review sheet to Appendix C, Unacceptable Joints – Moved to Appendix A Appendix D, NONMANDATORY METHOD – Eliminated

ASME CC N-808 Fusing Incorporation of Section IX, FUSING (2013 ED.) No nuclear extras Essential Variables Thermal Butt fusion & Electro-fusion (future) Fusion Procedure Specification (FPS) Fusion Data (FPS) comes from the PE Material Manufacturer (TR-33 (PPI) Standard Fusion Procedure Specification) Has the requirements for different FPS development (PQR) Qualification of both Procedure and Personnel essential variables in FPS Uses testing ASTM’s, Section IX has acceptance criteria

ASME CC N-808 Fusing - Experience Poor Material Fusing Problem – Major Problem Material will not fuse correctly Coupons using project material at the site and test facility failed all tests. Tensile – Impact Test ISO Tensile Test DVS (German) Tensile Test Pipe manufacturer could not fuse the pipe and pass tensile-impact tests (fusion box numbers)

ASME CC N-808 Fusing - Experience Tensile – Impact (T-I) Test Pipe maker felt the test was misleading yet signed letter in TR-33 that their material passed T-I tests Follow on testing showed that this test is a good indicator for condition of PE material; Poor or defective resin PE product form defective FPS not followed

ASME CC N-808 Fusing - Experience PE Material ASTM’s don’t have acceptance criteria NOT ALL PE 4710 RESINS ARE EQUAL Material Properties are very different NOT ALL PIPE MANUFACTURERS ARE EQUAL Old equipment (windows) in pipe wall QA program TR-33 Data sometimes is not repeatable Need method to confirm material is fusible

ASME CC N-808 FUSING Fusing Callaway Relief Request, fusing process was reviewed by the NRC as an NDE procedure Any variable identified in an NDE procedure is an “essential” variable Section IX – defines essential variable as; Essential variables - are those which will affect the mechanical properties of the fused joint, if changed, and require requalification of the FPS when any change exceeds the specified limits of the values recorded in the FPS for that variable..

ASME CC N-808 FUSING Fusing PE Material Conformation POLYETHYLENE MATERIAL FUSING QUALIFICATION TESTING Use Project Material Test each corner of Fusion Box A. 60 psi – 400 o F B. 60 psi – 450 o F C. 90 psi – 400 o F D. 90 psi – 450 o F Use Tensile-Impact Test Test each combination of different manufacturers product form

ASME CC N-808 UT Examination - History UT Examination – Callaway Project Used UT examination for ease in examination of joints versa destructive test Pipe is 175 lb/ft (Crane service) No testing machine on site Callaway used Time-of-Flight (TOF) tested over 200 joints (no miters) No indications in any joint Performed Section V, Article 14, performance demonstration of TOF technique

ASME CC N-808 UT Examination - Incorporation UT Examination Requires UT exam on > 4 inch product form Requires Phased-Array technique Can examine all joints, including miters Common technique so little training is required All UT examiners will be trained as fusion machine operator, Requires Section V, Article 14, performance demonstration of technique, intermediate rigor

ASME CC N-808 UT Examination - Incorporation UT Examination Acceptance Criteria No indication or response No evaluation of data allowed Detailed coupons for Section V, demonstration of technique to ensure adequate coverage No repairs allowed

ASME CC N-808 Future Approval Final Approval November, 2013 Owner will need CC N-808 Will seek approval from the NRC (partial)

ASME CC N-808 THE END Thank you for listening Any Questions?????