Vibrio vulnificus Calculator VMC/Gulf Regulators Conference Call August 1, 2008.

Slides:



Advertisements
Similar presentations
{Customer} Divisions Plan {Date} – {Version} Salesforce.com.
Advertisements

Chapter 9 Growth.
Part 3 Probabilistic Decision Models
Evidence 2/8/2014 Evidence 1 Evidence What is it? Where to find it?
National Seminar on Developing a Program for the Implementation of the 2008 SNA and Supporting Statistics in Turkey Tuna KEMALİ 10 September 2013 Ankara.
Matthew M. Riggs, Ph.D. metrum research group LLC
Learner-Centered Education Course Redesign Initiative Builds upon work of prior LCE grants Will award grants of $40,000 - $50,000, with the option.
Learner-Centered Education Course Redesign Initiative Builds upon work of prior LCE grants Will award grants of $40,000 - $50,000, with the option.
National Economic Conditions John Weinberg August 11, 2010.
TABLE OF CONTENTS CHAPTER 1.0: Trends in the Overall Health Care Market Chart 1.1: Total National Health Expenditures, 1980 – 2005 Chart 1.2: Percent Change.
INDIVIDUAL ACHIEVEMENT. EDUCATIONAL EXCELLENCE. ADMINISTRATIVE INNOVATION. INSTITUTIONAL PERFORMANCE. PA Bug 2008 User Conference 1 Benefit/Deduction Combined.
Exhibit 1. National Health Expenditures per Capita, 1980–2007
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
Chapter 9 Normalisation of Field Half-lives
COBECOS mid-term meeting, 2-3 September 2008, San Sebastian Italian case study: GSA 9 bottom trawling fishery Status of model estimation at September 2008.
1 Performance indicators, targets, steering Technical Interchange meeting Toulouse, May 2002 Xavier FRON Head Performance Review Unit.
Dynamic Pricing - Potential and Issues Joe Wharton and Ahmad Faruqui Kansas Corporation Commission Workshop on Energy Efficiency March 25, 2008.
Overview of Floridas DSM Accomplishments and Goal Setting Process Presentation to the: Florida Public Service Commission Workshop on Energy Efficiency.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
1 In Search of Closing the Continuous Improvement Loop: Outcomes Assessment of Student Knowledge M. Suzanne Clinton Associate Dean, School of Business.
Understanding Multiyear Estimates from the American Community Survey Updated February 2013.
Seasonal Normal Weather Base
Overview of the Green Infrastructure Section of PWSAs Feasibility Study Presentation Charrette No. 3: April 19, 2013 Presenter: Ross Gordon, PE, CFM, LEED.
Slides prepared by JOHN LOUCKS St. Edward’s University.
Management Plans: A Roadmap to Successful Implementation
Department of Defense Pest Management Measures of Merit (MoMs) At the end of every fiscal year a data call is sent out to the Army, Navy, Air Force, and.
Water Distribution Systems – Part 1
OECD WATER OUTLOOK TO 2050: MANAGING WATER RISKS & SEIZING GREEN GROWTH OPPORTUNITIES CNI Sustainability: Water Opportunities and Challenges for Development.
Rhode Islands Caseload Reduction Credit in the Temporary Assistance for Needy Families (RI Works) Program FFY12 [ffy11 data]
Historical Perspective on British Columbias Credit Rating Presentation to Financial Management Institute June 18, 2008.
Credit Risk Plus November 15, 2010 By: A V Vedpuriswar.
Gilbert Noussitou NUTRITION L3 COOK & CHILL and COOK & FREEZE SYSTEMS.
Regional variation in Medicare service use and prescription drug use Mark E. Miller, PhD Executive Director, MedPAC November 9, 2010.
Clean Air Interstate Rule (CAIR) CAIR Requirements for SIPs Office of Air and Radiation March 2005.
1 Price Risk Management and the Futures Market Hedging.
Chapter 10 Project Cash Flows and Risk
Chapter 11 Strategic Capacity Management
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Chapter 9 Capacity Decisions IDS 605 Spring 1999.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J S 7-1 Operations Management Capacity Planning Supplement 7.
Advanced Project Schedule Risk Analysis
7. PV System Sizing Herb Wade Consultant
2009 Foster School of Business Cost Accounting L.DuCharme 1 Determining How Costs Behave Chapter 10.
Delivering a real CDM Project The BP PRODEEM Rural Solar Project.
Superintendent’s Proposed FY 2013 – FY 2022 Capital Improvement Plan May 10, 2012.
City of Miami PROPOSED Fiscal Year 2009 BUDGET. 2 Budget Focus To prepare a structurally balanced general operating budget. To provide a budget, which.
UNIT 2: SOLVING EQUATIONS AND INEQUALITIES SOLVE EACH OF THE FOLLOWING EQUATIONS FOR y. # x + 5 y = x 5 y = 2 x y = 2 x y.
1 General Iteration Algorithms by Luyang Fu, Ph. D., State Auto Insurance Company Cheng-sheng Peter Wu, FCAS, ASA, MAAA, Deloitte Consulting LLP 2007 CAS.
Edwards Aquifer Forecasts for 2014 Jim Winterle—EAA modeling supervisor HCP Stakeholder Committee May 28,
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
Management Plan: An Overview
Week 1.
MEL 4E.  Graphing data can make it easier to quickly see trends. There are different types of graphs which each show and compare data.
Relating energy consumption to performance Duncan East Sustainability Manager.
Chapter 13 Preparing The Systems Proposal Systems Analysis and Design Kendall and Kendall Fifth Edition.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
UK Renal Registry 17th Annual Report Figure 5.1. Trend in one year after 90 day incident patient survival by first modality, 2003–2012 cohorts (adjusted.
Developing and Supporting Online Learning in a Traditional UK Polytechnic University: A view from the middle Rachel Forsyth, Learning and Teaching Unit,
Benchmark Series Microsoft Excel 2013 Level 2
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Evaluation of the Efficacy of a Commercial Heat Shock Method for Reduction of Vibrio vulnificus and Vibrio parahaemolyticus in Gulf of Mexico Oysters Abdallah.
Cooling Oysters Within the New 10 Hour Required Time Frame from the Environment to 50 ⁰F or Below in a Refrigerated Storage Area for ICSR 2010 November.
March 7, 2013 Texas Education Agency | Office of Assessment and Accountability Division of Performance Reporting Accountability Policy Advisory Committee.
GrocerSmart TM Energy Modeling Software -Revision Status Report- & -Request For Input- July 13, 2010.
Vp Risk Assessment and Calculator Development
A Stitch in Time Saves Nine
California’s Water Conservation Amidst A Record Drought
Presentation transcript:

Vibrio vulnificus Calculator VMC/Gulf Regulators Conference Call August 1, 2008

ISSC adopted Vv illness reduction plan–1999? 60% illness reduction goal (per capita) 60% illness reduction goal (per capita) Core states: CA, TX, LA & FL Core states: CA, TX, LA & FL Baseline : 21.4 cases/yr Baseline : 21.4 cases/yr Education and increasing PHP capacity Education and increasing PHP capacity 7 year plan with reductions based on ave # cases in 2007 & year plan with reductions based on ave # cases in 2007 & 2008

Current Status 2007 cases= cases=19 –24.8% reduction from baseline –Adjusted for population increase 2008 partial cases= partial cases=3 Plan does not reach goal if 20 or more cases occur in 2007 & 2008 combined Plan does not reach goal if 20 or more cases occur in 2007 & 2008 combined Goal will not be met Goal will not be met Goal shortfall cannot be determined until after 2008 Goal shortfall cannot be determined until after 2008

Consequences of not achieving goal Seasonal closures (100% effective) Seasonal closures (100% effective) Diversion to PHP (100% effective) Diversion to PHP (100% effective) Label “for cooking only” OK for Vv? (100% effective) Label “for cooking only” OK for Vv? (100% effective) Other means? Other means? –Time/temperature controls –High salinity relaying ISSC Spring Executive Board Mtg ISSC Spring Executive Board Mtg –Gulf States submit control plan by Aug. 15, 2008 (amended?) –States implement plans in 2010

Time/Temperature Controls GSASSC New Orleans June 2008 GSASSC New Orleans June 2008 –Gulf regulators requested that FDA develop risk calculator similar to that proposed for VPCP Vv Risk calculator Vv Risk calculator –Based on 2005 FAO/WHO VVRA –Dose response based on reported cases in US

Beta Poisson vs Exponential

Vv Calculator Features Derived from FAO/WHO VVRA Derived from FAO/WHO VVRA –Monte Carlo simulations –Time consuming –Expensive software –Trained operators Vv risk calculator Vv risk calculator –Based on regression fits to a set of Monte Carlo simulation output –Calculates Vv levels & risk instantly –Flexible to evaluate diverse scenarios and different end points for desired level of illness reduction

Average monthly maximum water temperature (AMMWT) Determines Vv levels at harvest based on relationship between water temperature & Vv level from Vv risk assessment (VVRA) Determines Vv levels at harvest based on relationship between water temperature & Vv level from Vv risk assessment (VVRA) State determines scale: area, basin or entire state (buoy, sampling) State determines scale: area, basin or entire state (buoy, sampling) Gulf-wide Gulf-wide

Effect of Temperature on Vv densities in Gulf Coast oysters

Average monthly air temperature Surrogate for oyster temperature Surrogate for oyster temperature –Determines Vv growth rate Ave. air temperature determination Ave. air temperature determination –Ave. monthly noon air temperature –Ave. monthly maximum temperature –Ave. monthly air temperature during harvest period (i.e AM) –Ave. oyster temperature during harvest period

Baseline: max. time to refrigeration Controls that were in place during the baseline period of Controls that were in place during the baseline period of –Vary from state to state Alternatively 10h for summer month? Alternatively 10h for summer month? –Represents control used for most Gulf oyster harvest

Baseline: Max cool down time Time from when oysters are first placed into refrigeration until reach no growth temperature of 13C or 55F Time from when oysters are first placed into refrigeration until reach no growth temperature of 13C or 55F 10 hour is assumption used in both FDA VPRA and FAO/WHO VVRA 10 hour is assumption used in both FDA VPRA and FAO/WHO VVRA Ave cool down between 1 to 10 hours Ave cool down between 1 to 10 hours

Demonstration of using Vv risk calculator Baseline ( ) controls Baseline ( ) controls Effect of VPCP on Vv risk Effect of VPCP on Vv risk Risk at harvest (best case scenario) Risk at harvest (best case scenario)

Calculator Inputs Average monthly water temperature Average monthly water temperature Average monthly air temperature Average monthly air temperature Maximum time to first refrigeration Maximum time to first refrigeration Maximum cool down time Maximum cool down time

Calculator Outputs Vv levels at consumption Vv levels at consumption Vv risk per 100,000 meals Vv risk per 100,000 meals Number of cases per month (Nation wide) Number of cases per month (Nation wide) % change in number of cases from the baseline % change in number of cases from the baseline

Baseline Demonstration Open Excel Vv Calculator Tab

Effect of VPCP on Vv Risk 81F Tab 81F Tab

Vv Risk at Harvest Risk at Harvest Tab

Caveats Dose response not linear & does not provide outputs above 90F and >15h to first refrigeration Dose response not linear & does not provide outputs above 90F and >15h to first refrigeration Controls changed in 1997 during baseline period ( ) Controls changed in 1997 during baseline period ( ) Controls vary across Gulf states Controls vary across Gulf states Implementation of VPCP in 2008 Implementation of VPCP in 2008 –Max. time to refrigeration –Changes in volume of harvest for raw consumption? % raw consumption varies across Gulf states % raw consumption varies across Gulf states

Summary Scenario analysis Scenario analysis –Manage on monthly scale –Modify time to refrigeration and cool down times Outputs Outputs –Vv levels at consumption –Vv risk per 100,000 meals (at risk population) –Expected number of cases –Change from baseline