Notification To Construct Business Practice (NTC BP) Overview Terri Gallup, PCWG Chair Paul Suskie, SPP.

Slides:



Advertisements
Similar presentations
Westar Energy Transmission Operations: An Update on Regional and Local Transmission Activity June 22, 2010 Presented to Attendees of Westars Transmission.
Advertisements

10/22/20101 Westar Formula Rate and your bill. 10/22/20102 What we will be going over Transferring the results from the Westar Formula Rate to the SPP.
FPLs Request for Recovery of the Costs Associated with the Seabrook Transmission Substations Pool Transmission Facilities NEPOOL Participants Committee.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Membership & Roster Maintenance September 2013 ASTM Officers.
Membership & Roster Maintenance Officers Training Workshop September 2012 Kevin Shanahan 1.
Parallel Flow Visualization/Mitigation Proposal
Business Practices Subcommittee Update August 17, 2010.
E-Tariff - The Problem with Joint and Shared Filings Presented by National Grid NAESB E-Tariff Conference Colorado Springs January 23-25, 2008.
NAESB Coordinate Interchange
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Standards Development and Approval Process Steve Rueckert Director of Standards Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake.
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Process for Developing and Approving WECC Regional Criteria Preschedule Process Regional Criteria Drafting Team Meeting Conference Call - Webinar October.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
WECC TEPPC – March 14, 2008 PCC – TEPPC Coordination Roles & Responsibilities – RE Kondziolka 1 PCC – TEPPC Coordinating Roles and Responsibilities WECC.
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
3/2/ STANLEY LIGAS, et al. v. JULIE HAMOS, et al. First Annual Report of the Monitor September 27, 2012 Tony Records, Monitor
Goals for 2003 Kansas Interconnection Standards Development Larry Holloway Chief of Energy Operations Kansas Corporation Commission.
Presented by Beth Waldman, JD, MPH For the Iowa DHS Remedial Services Working Group Meeting Four December 3, 2010.
Grants 3.0 Departmental Administrator Review January 22, 2014.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
Order No Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities Strategic Planning Committee Task Force.
FERC Order minute Scheduling.
PEACE-KEEPING BUDGETS CURRENT PROCESS OF ESTABLISHING AND EXTENDING PEACE- KEEPING OPERATIONS A: New missions: 1.A Survey mission is sent to the area of.
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
Andrew Meyers OC Update ISAS April 2014 Salt Lake City, UT.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
1 DELAYED LAST STATE AID - BORROWING PROCESS
GEtServices Services Training For Suppliers Requests/Proposals.
Doc.: IEEE 802 EC-12/0026r2 Submission July 2012 Jon Rosdahl, CSRSlide 1 Meeting Manager - Proposed Changes to OM and Chair’s Guideline Date:
DG Interconnection Working Group Fees and Cost Support for DG Interconnections August 6, 2012.
TRANSFERS FROM BP: FOR WHAT TIME PERIOD? June 28, 2011 Mike Proctor.
Joint Presentation: Jamie Tosches (AGO); Peter Zschokke (NGRID); Camilo Serna (NU); Janet Besser (NE CEC); and David Malkin (GE); Jonathan Raab (Facilitator)
African Aviation Training Organization
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
SPP.org 1. Priority Project Update Bruce Rew Vice President, Engineering.
SPP.org 11. SPP Delivery Point Addition (DPA) Process Effective May 1, 2010.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
Spare Transformer Equipment Program (STEP) Public Service Commission of Utah – Technical Conference July 8, 2014.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
May 16, 2007 Board of Directors Texas Regional Entity Division Update Sam R. Jones ERCOT President & CEO.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Fiscal Monitoring and Oversight Tecumseh Local School District January 8, 2013 Roger Hardin, Assistant Director Finance Program Services (614)
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
TEXAS NODAL Board of Directors Austin, Texas July 15, 2003.
Amending the Regional Agreement Presentationby Massachusetts Association of Regional Schools 1.
NARUC SUMMER COMMITTEE MEETINGS Committee on Water Agenda California Regulatory Initiatives Case History – California American Water B. Kent Turner – President.
Tariff Change Recommendations to the Commercial Practices Committee From the Regional Tariff Working Group April 9, 2001.
2013 Wind Conference. Transmission Service Study Process Steve Purdy.
Option for an Enhanced SPP Regional Project Review Process Presentation to the Regional State Committee January 24, 2011 Lisa M. Barton SVP American Electric.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
Tariff Change Recommendations to the Commercial Practices Committee From the Regional Tariff Working Group.
Project Update TOP/IRO Reliability Standards NERC ORS May 6, 2014.
2015 Fall PR-MR & Marketing Meeting October 16, 2015 Fairo Mitchell Energy Policy Director, Public Utility Division Oklahoma Corporation Commission.
PRESENTATION TO THE FORT ORD REUSE AUTHORITY BOARD OF DIRECTORS JULY 12, 2013 Capital Improvement Program FY 2013/14.
Addressing Cost Estimates and Cost Increases Project Cost Task Force February 18, 2011.
Market Working Group Update Presentation to CAWG March 29, 2011 Jim Sanderson, KCC.
Profiling Working Group September 26, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting September 26, 2003.
Southwest Power Pool, Inc.
PLWG Review 6.9 and the Interconnection process
New England States Committee on Electricity (NESCOE)
Z2 Crediting Project Update RTWG
Westar Formula Rate and your bill
CAWG Teleconference – January 5, 2011
Presentation transcript:

Notification To Construct Business Practice (NTC BP) Overview Terri Gallup, PCWG Chair Paul Suskie, SPP

Members of Project Cost Task Force (PCTF) Terri Gallup, Chair (American Electric Power) Al Ackland (Kansas City Power & Light Company) Peter Day (Oklahoma Gas and Electric Co.) Jason Fortik (Lincoln Electric System) Ray Harold (Midwest Energy) Tom Hestermann (Sunflower Electric Power Corp.) David Kimball (Nebraska Public Power District) Tom Littleton (Oklahoma Municipal Power Authority) Sam McGarrah (Empire District Electric Company) Brian Slocum (ITC Great Plains, LLC) Others that participated: Westar, SPS, WFEC, OPPD & KCC staff

Members of Project Cost PCWG Terri Gallup, Chair (AEP) Jeff Stebbins, Vice Chair (SPS) Brent Carr (AECC) Lloyd Kolb (GSEC) Al Ackland (KCPL) Larry Holloway (KPP) Peter Day (OGE) Leland Jacobsen (OPPD) Brian Gedrich (NextEra) Tom Hestermann (SEPC) David Kimball (NPPD) Tom Littleton (OMPA) Brian Slocum (ITC)Scott Benortham (Westar) John Krajewski (CAWG liaison)

MOPC January 2012 Meeting Directed PCWG to finalize new proposed NTC BP Desired the BP to be approved prior to issuance of NTCs and NTC-Cs from projects reviewed and approved by SPP BOD in its Jan 31 meeting (ATPs another process) Provide BPWG, RTWG, ORWG, TWG opportunity to review per BP process Requested the above processes be completed to allow for a MOPC vote prior to Feb 15 GOAL: Have an approved NTC BP incorporating new cost estimating principles in place for new projects by Feb 15

Status of New Proposed NTC BP Approved by PCWG on 1/20 Approved by BPWG on 1/23 RTWG will review on Jan 26 TWG will review on Feb 3 ORWG determining if they need to review

TWG Review To assess impacts to the SPP planning and modeling processes associated with new or modified business practices being proposed BASIC QUESTION: Does the modified NTC BP impact the Planning and/or Modeling processes?

PCWG Development of NTC BP Started with the existing NTC BP Labeled the existing BP for use prior to July 2011 Labeled the new proposed BP for use July 2011 forward Inserted the PCTF principles into the existing BP Used MOPC approved PCTF White Paper that was developed from BOD approved SPC Principles Added BOD approved SPC Assignment & Novation Principles Added a NTC-C Appendix B - Sample NTC-C Letter

Stakeholder Expressed Concerns –Stakeholders Expressed Two Concerns for NTC BP to be Approved Prior to Issuance of NTCs from Jan 31 BOD approved projects: (1)Cost Recovery of NTC with Condition expenses (2) Status of incorporating the PCTF White Paper into SPP Business Practices 8

LEGAL REVIEW SPP Legal and SPP FERC Counsel reviewed the new proposed NTC BP for OATT compliance Legal Counsel suggested changes to incorporate existing OATT NTC language thus eliminating any need for OATT changes Existing SPP OATT already addresses a revoked NTC cost recovery PCWG modified NTC BP to incorporate suggestions

Existing Cost Recovery for Revoking a NTC SPP OATT, Attachment O, V. (5) Removal of an Upgrade from the SPP Transmission Expansion Plan. –The Transmission Provider, in consultation with the stakeholders in accordance with Section V of this Attachment O, may remove an upgrade from an approved SPP Transmission Expansion Plan. A Transmission Owner that has incurred costs related to the removed upgrade shall be reimbursed for any expenditure pursuant to Section VIII of Attachment J to the Tariff. 10

Attachment J, VIII: Uncompleted Network Upgrades The costs of Network Upgrades that are not completed through no fault of the Transmission Owner charged with construction of the upgrades shall be handled as follows: If a proposed Network Upgrade was accepted and approved by the Transmission Provider, the Transmission Provider shall develop a mechanism to recover such costs and distribute such revenue on a case by case basis. Such recovery and distribution mechanism shall be filed with the Commission. The Transmission Owner(s) that incurred the costs shall be reimbursed for those costs by the Transmission Provider. These costs shall include, but are not limited to: the costs associated with attempting to obtain all necessary approvals for the project, study costs, and any construction costs. 11

Implementing MOPC and BOD Approved New Processes SPCTF Recommendations on RSC motions (PCTF White Paper, Study Estimate Design Guide & Assignment and Novation principles) were approved by MOPC and the SPP BOD in July 2011 PCWG completed new NTC Business Practice to implement the above Predicament Discussed in MOPC Jan 2012 Meeting: How to handle NTCs pending before the SPP BOD in January 2012 before the NTC BP incorporating the above is approved? 12

Options Considered By MOPC Option 1: SPP BOD could approve the issuance of NTCs contingent upon changes to SPP’s Business Practices that incorporate the Project Cost Task Force (PCTF) project cost estimation recommendations. Option 2: SPP BOD could approve issuance NTCs with a condition that the Designated Transmission Owner (DTO) not order materials or begin construction until: (1) the DTO submits a refined project cost estimate to SPP staff that has a variance bandwidth of -20% to +20% that does not exceed the study estimate variance bandwidth of -30% to +30%, or (2) the SPP BOD considers SPP Staff’s re-evaluation of a project that has a refined project cost estimate from the DTO that exceeds the study estimate variance bandwidth of -30% to +30%. MOPC APPROVED OPTION 1 in its January 2012 Meeting 13

TWG Review Today To assess impacts to the SPP planning and modeling processes associated with new or modified business practices being proposed BASIC QUESTION: Does the modified NTC BP impact the Planning and/or Modeling processes?