MS4 Compliance Assistance Training. WELCOME MS4 Permit Compliance Assistance Training Agenda Morning Session (9:00 am-12:00 pm) Introduction Introduction.

Slides:



Advertisements
Similar presentations
Session 1 Outline Overview of Phase II What is expected? What should we be doing today? What are others doing? Suggested steps to move your program forward.
Advertisements

Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
MS4 Permit and Storm Water Management Program Overview
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
SW101 Municipal Separate Storm Sewer Systems (MS4s)
What are TMDLs? and What Might They Mean to MS4 Permittees?
O Adopted in 1972, the CWA is known mostly to the public by its mandate for “swimmable and fishable” waterways. o With the CWA, states evaluate all of.
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
DEQ Mission By the end of the decade, Virginians will enjoy cleaner water available for all uses, improved air quality that supports communities and ecosystems,
Stormwater Management/ MS4 Permitting International Municipal Lawyers Association 2014 Annual Conference Baltimore, Maryland Gene Tanaka
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
Upper Providence Township Stormwater Management MS4 Program.
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
Introduction to Compliance Assistance Documents Part I.
Upper Merion Township’s New Storm Water Management Program
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
Arkansas Storm Water Program Arkansas Update On Construction, Industrial & Small MS4.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Municipal Regional Stormwater NPDES Permit Overview of Requirements, Recommended Changes, and Assistance Needed March 12, 2009.
EPA Region 6 MS4 Conference July 28 – August 1, 2014
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.
Greg Stabach and Kim Adams Rogue Valley Council of Governments January 21 st, 2015 Rogue TMDL Meeting.
The purpose of the San Dieguito Union High School District’s stormwater management plan is to comply with applicable stormwater regulations, educate.
Implementing the Municipal Separate Storm Sewer System Permit Stormwater Division General Services Department Board of Supervisors Work Session October.
Total Maximum Daily Loads in MS4 Storm Water Programs.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
MS4/sMS4 Annual Report Development Thea Lomax Presenter Storm Water Enforcement Thea Lomax Presenter Storm Water Enforcement Prepared 07/04/2011.
City of Puyallup Planning Commission Presentation February 8, 2012.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
WOOLPERT Managing NPDES Phase II Requirements on a County-Wide Basis Jared Livingston.
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
MS4 Permitting Process William Creal Water Bureau Permits Section Chief.
Regional Stormwater Management Coordinating Council Meeting Summary of May 13 th Meeting Summary of May 13 th Meeting Regulatory Updates Regulatory Updates.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Overview of Montana’s Stormwater Regulatory Program.
Barb Loida, Carolyn Adamson, Dave Bauer MECA 2014.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
MS4 Permit Updates May 9, 2014 Jay Hoskins, P.E. Metropolitan St. Louis Sewer District.
Construction Site Stormwater Compliance Presentation for CALBIG Matt Fabry, Program Coordinator October 9, 2013 San Mateo Countywide Water Pollution Prevention.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
STREAMLINING STORM WATER PERMIT IMPLEMENTATION THROUGH USE OF AN INFORMATION MANAGEMENT SYSTEM April 8, 2004 Presented by John W. Hart 30 th Environmental.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
CLEAN WATER ACT AND MUNICIPAL STORMWATER CALIFORNIA STORMWATER WORKSHOP David W. Smith, Manager NPDES Permits Section EPA/Region 9.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Northern California Chapter of the American Public Works Association January 28, 206 Beth Baldwin, Program Staff Contra Costa Clean Water Program.
NJDEP Stormwater Program-Update
Hampden Township Stormwater Management Program
Municipal Separate Storm Sewer System (MS4) Permit
Stormwater Management and MS4 Compliance
Presentation to the Livingston City Council on the Phase II MS4 Permit
Town of Melbourne Beach
NH MS4 Stormwater Permit -- Guidance for NHDES related provisions
Sacramento County Stormwater Quality Program
City of Forest Lake MS4 Program
Stormwater Management Program
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
So I have a TMDL Wasteload Allocation
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
MS4 = Municipal Separated Storm Sewer System
Illicit Discharge Detection & Elimination (IDDE) Plan
Sacramento County Stormwater Quality Program
Presentation transcript:

MS4 Compliance Assistance Training

WELCOME

MS4 Permit Compliance Assistance Training Agenda Morning Session (9:00 am-12:00 pm) Introduction Introduction Compliance Schedules Compliance Schedules Compliance Assistance Documents – Part 1 Compliance Assistance Documents – Part 1 Understanding Post Construction Control Understanding Post Construction Control Lunch (12:00-12:45 pm) Afternoon Session (12:45 pm-4:00 pm) Total Maximum Daily Load (TMDL) Requirements Total Maximum Daily Load (TMDL) Requirements Compliance Assistance Documents – Part 2 Compliance Assistance Documents – Part 2 Understanding Pollution Prevention/Good Housekeeping Understanding Pollution Prevention/Good Housekeeping

Packet Materials List of acronyms List of acronyms DNRE storm water staff contacts DNRE storm water staff contacts Compliance Assistance Documents Compliance Assistance Documents Fact sheets for the Compliance Assistance Documents Fact sheets for the Compliance Assistance Documents Figures to assist with presentations Figures to assist with presentations

Why is SEMCOG involved? Stormwater issue to our 160 plus members Stormwater issue to our 160 plus members Stormwater services Stormwater services Stormwater Pollution Prevention Plan Stormwater Pollution Prevention Plan Stormwater Audit Stormwater Audit TMDL Assistance TMDL Assistance Green Infrastructure Presentations Green Infrastructure Presentations Site analysis Site analysis

MS4 Implementation Team Members Christe Alwin, DNRE Christe Alwin, DNRE Chris Bauer, DNRE Chris Bauer, DNRE Keith Noble, DNRE Keith Noble, DNRE Mark Fife, DNRE Mark Fife, DNRE Marty Hendges, DNRE Marty Hendges, DNRE Pete Ostlund, DNRE Pete Ostlund, DNRE Mike Bray, DNRE Mike Bray, DNRE Judy Ruszkowski, MDOT Judy Ruszkowski, MDOT John Paquin, Kalamazoo John Paquin, Kalamazoo Chris Kosmowski, Battle Creek Chris Kosmowski, Battle Creek Sandra Diorka, Delhi Township Sandra Diorka, Delhi Township Janis Bobrin, Washtenaw Co. Steve Van Hoeven, Ottawa Co. Kristen O. Jurs, St. Clair Co. Lynne Seymour, Macomb Co. Amy Mangus, SEMCOG Kelly Karll, SEMCOG Beth McDonald, MACC Marcy Colclough, SWMPC Demetria Janus, ECT Russel A. Beaubien, Spicer

MS4 Implementation Team The team consists of DNRE staff, MS4 permittees, and other agencies assisting MS4 permittees. The team consists of DNRE staff, MS4 permittees, and other agencies assisting MS4 permittees. The MS4 Implementation Team’s main focus is on permit compliance assistance. The MS4 Implementation Team’s main focus is on permit compliance assistance. The team will remain active until the end of the permit cycle. The team will remain active until the end of the permit cycle.

MS4 Implementation Team Compliance Assistance Document development Compliance Assistance Document development Continued document development Continued document development Alternative review Alternative review

Watershed vs. Jurisdictional Watershed Permit Flexibility Alternatives Elective options Collaborative watershed management planning effort Variety of Evaluation Methods Storm Water Pollution Prevention Initiative (SWPPI) Jurisdictional Permit Prescriptive Limited Alternatives Individual effort Measurable Goals Storm Water Management Program (SWMP)

Submittal Dates for the Watershed Permit Permit Requirement Submittal Date Implementation Joint PPP 6 months after effective date of COC Upon Submittal SWPPI Revisions 1 year after effective date of COC Standard requirements upon submittal Standard requirements upon submittal Alternatives upon approval Alternatives upon approval Joint Report on WMP updates/revisions needed 2 years after effective date of COC Begin revisions/updates based on the needs identified

Submittal Dates for the Watershed Permit continued… Permit Requirement Submittal Date Implementation Progress Report 2 nd and 4 th year of the permit cycle N/A Reporting newly discovered or constructed discharge points Upon discovery or construction N/A Joint report on implementation status of WMP 4 years after effective date of COC Beginning when the SWPPI revision/update is submitted Joint WMP revision/update 4 years after effective date of COC As determined by watershed partners

Submittal Dates for the Jurisdictional Permit Permit Requirement Submittal Date Implementation SWMP 6 months after effective date of COC Upon Submittal Progress Reports 2 nd and 4 th year of the permit cycle N/A

Compliance Assistance Documents The Compliance assistance documents can be found on the Department of Natural Resources and Environment website at: The Compliance assistance documents can be found on the Department of Natural Resources and Environment website at: Click on the link “Municipal Program/MS4 Compliance Assistance”

Compliance Assistance Documents Available for the Watershed Permit Discharge Point Location Discharge Point Location SWPPI – Standard Requirements SWPPI – Standard Requirements Alternatives Alternatives Scope of the SWPPI Scope of the SWPPI Total Maximum Daily Loads Total Maximum Daily Loads Public Education Program Public Education Program Illicit Discharge Elimination Program Illicit Discharge Elimination Program Post-Construction Control Post-Construction Control Construction Runoff Construction Runoff Pollution Prevention/Good Housekeeping Pollution Prevention/Good Housekeeping SWPPI – Program Assessment SWPPI – Program Assessment

Compliance Assistance Documents Available for the Jurisdictional Permit Discharge Point Location Discharge Point Location SWMP – Standard Requirements SWMP – Standard Requirements Alternatives Alternatives Scope of the SWPPI Scope of the SWPPI Total Maximum Daily Loads Total Maximum Daily Loads Public Education Program Public Education Program Illicit Discharge Elimination Program Illicit Discharge Elimination Program Post-Construction Control Post-Construction Control Construction Runoff Construction Runoff Pollution Prevention/Good Housekeeping Pollution Prevention/Good Housekeeping SWMP – Measurable Goals SWMP – Measurable Goals