ANNOUNCEMENTS Please any technical issues to CHANGE OF LOCATION: – Days 1 and 2 will now BOTH be held at the Washington DC.

Slides:



Advertisements
Similar presentations
1 Environmental Assessment of Trade Negotiations Government of Canada Approach WTO Public Forum September 25, 2006.
Advertisements

Stakeholder Involvement Program to Establish New and Better Hazardous Waste Treatment Facilities in WA 3c web: telephone: (08)
Social Science Research and Chesapeake Bay Restoration: Workshop Report Social Science Workshop Steering Committee.
Background & Expected Outcomes 1 Myriam Hill Wendel Wohlleben.
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
The National Water Quality Monitoring Network for U.S. Coastal Waters and their Tributaries National Water Quality Monitoring Council October 31, 2006.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
November 13, 2003IEEE Albuquerque Plenary Session 1 Moving Forward Robert D.Love LAN Connect Consultants C /113.
Interlaboratory Testing: Preliminary Concepts Carolyn Cairns and Janet Carter 16 May 2013.
Breakout Group Instructions Four Breakout Groups will meet for two sessions, allowing everyone to discuss two different topics (if desired). Transition.
Achieving the Dream Issues Workshop January 11, 2008.
Student Research Conference 2011 Submitting a Research Conference Proposal.
4th Meeting of the Washington Group on Disability Statistics Fourth meeting of the WG: objectives and agenda Jennifer H. Madans U.S.A.
Creative Problem Solving 6.1 Novice Level Office of Gifted Education Virginia Beach City Public Schools.
Query Health Business Working Group Kick-Off September 8, 2011.
1 of 39 DQO Implementation Process: Flow Chart and Wall Charts 30 minutes DQO Training Course Day 2 Module 8 Presenter: Sebastian Tindall.
Quality Information Framework (QIF) Design and Strategy Meeting June 12-14, 2012 Hilton Head Island Dimensional Metrology Standards Consortium (DMSC) 1.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 10, 2011.
System Analysis and Design Dr. Taysir Hassan Abdel Hamid Lecture 5: Analysis Chapter 3: Requirements Determination November 10, 2013.
Query Health Technical WG 4/19/2012. Agenda TopicTime Slot Administrative stuff and reminders2:05 – 2:10 pm F2F Recap2:10 – 2:30 pm HQMF Translator UML2:30.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Copyright © 2008 Pearson Education, Inc. Publishing as Pearson Addison-Wesley The Resonant Interface HCI Foundations for Interaction Design First Edition.
PwC 21 CFR Part 11 – A Risk Management Perspective Patrick D. Roche 07 March 2003, Washington D.C.
BCSSE Denver 2014 MEETING ORGANIZATION AND OVERVIEW.
2nd Workshop on Wideband Speech Quality - June ETSI TC STQ STF 294 Improving the quality of eEurope wideband speech applications by developing a.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Advancing Government through Collaboration, Education and Action Harnessing Life Events Information Sharing Team.
MSc conference briefing Mike Spann Project coordinator
Status Report on the AMPO Pooled Research Initiative on Travel Modeling Presentation to AMPO Travel Modeling Work Group November 4, 2010 MWCOG / NCRTPB.
Process Assessment Method
Research Methods and Techniques Lecture 8 Technical Writing 1 © 2004, J S Sventek, University of Glasgow.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
Choosing Supervisory Tools Solange Berstein Chair IOPS Technical Committee Superintendent Pension Supervisor Chile.
Brief Report to GRPE on the progress made by EFV Informal Group in its 5 th meeting held in New Delhi on 25 th November 2009 Informal document No. GRPE
2011 RTF Projects RTF Input on SOW Outlines: - Deemed Measure Reviews - Measure Life Guidelines -Measure Cost Guidelines Regional Technical Forum April.
Joint Canada-Mexico-USA (North American*) Carbon Program Planning Meeting January 25–26, 2007 *By North America we mean the North American land, adjacent.
Executive Session Director’s Progress Review of the NOvA Project August 4-5, 2010 Dean A. Hoffer.
11 Welcome to All! October 26-28, 2009 Washington, D.C. Welcome to All! Accelerators for America’s Future Symposium and Workshop October 26-28, 2009 Washington,
WLCG Collaboration Workshop 7 – 9 July, Imperial College, London In Collaboration With GridPP Workshop Outline, Registration, Accommodation, Social Events.
1 Pesticide Program Dialogue Committee Meeting State Lead Agency Presentation Chuck Andrews, Chair AAPCO Worker Protection Committee California Department.
API RP 6HP (draft 5.2) Status Presentation Tech Session II Summer Standards Conference.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 24, 2009.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
Sensor Standards Harmonization Working Group Report Summary of Sensor Standards Harmonization Working Group (SSHWG) Meeting held on Sensor Standards Harmonization.
Introduction to the workshops Dr A. Michael Warhurst Lowell Center for Sustainable Production.
Evaluation Seminar Czech Republic CSF and OP Managing Authorities Session 3: Mid-Term Evaluation.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
ARDG June 17th Agenda Reston, VA. 09: :15Introduction, Anti-trust statement, opening remarks 09: :45Discussion of scope 09: :00Discussion.
Global Geospatial Information Management (GGIM) A UN-DESA Initiative in collaboration with Cartographic Section, DFS Stefan Schweinfest UNSD.
Long Term Move-In Move-Out Development Strategy August 19, 2002 DRAFT.
DHHS COE Meeting Agenda February 11, 2010 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update.
DEVELOPMENT OF A WHITE PAPER ON CORRECTIONAL SERVICES Ministry of Correctional Services.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Open Public Meeting February 28, pm – 5 pm 1 Ashburton Place, Boston MassHealth Demonstration to Integrate Care for Dual Eligibles.
TGDC Meeting, Jan 2011 Report from Workshop on UOCAVA Remote Voting Systems Nelson Hastings National Institute of Standards and Technology
Welcome to (MAP) 2014 winter meeting J.P.Delahaye MAP Collaboration (FNAL, May 31, 2014)1 SLAC: Dec 2-6,
Electronic Phytosanitary Certification A Presentation by the International Plant Protection Convention Secretariat.
ISO Session 3 Environmental Management and Ethics in Management.
Caribbean Workshop on SAICM and related chemicals and hazardous waste management instruments Bridgetown, Barbados, March 2009 Preparations for the.
Executive Session Director’s Conceptual Design Review of Mu2e Project May 3-5, 2011 Jim Yeck.
Bow Basin Watershed Management Plan Revised Terms of Reference
Managing the Project Lifecycle
2 Selecting a Healthcare Information System.
TGs September 2005 Mid-week Report
Improving assessment of GES Draft conclusions and Way forward
Selecting a Health Care
Summary: 38th JSTC Meeting Sep 15 & 17, 2010 Kobe, Japan
Central Valley Water Board Meeting of 29 March 2012
Agenda item 4(b) Compliance mechanism - Report on the Committee’s activities since the second session of the Meeting of the Parties This is a sample Title.
Presentation transcript:

ANNOUNCEMENTS Please any technical issues to CHANGE OF LOCATION: – Days 1 and 2 will now BOTH be held at the Washington DC location of the US Environmental Protection Agency (East Building). – Day 1 room numbers are correct as in the agenda. – Day 2 room numbers will be announced

OBJECTIVES We are asking you to Consider presentations and discuss the findings of the project so far Evaluate practical steps to methods development in light of the findings, and Propose key elements that would go into a Workplan for Methods Development And this is all to inform the project Steering Committee, who will be making the final decisions of what to carry forward. Please note that the workshop is science-focused, interested in methods development and standardization, and will not focus on regulatory actions. In addition to the presentations, the expected workshop outputs are the reports from the charges of Breakout Sessions on Day 1 and Day 2 and a set of responses from the Steering Committee to elements of the Workplan.

What is the Steering Committee deciding? The Steering Committee is choosing elements of a workplan for pilot testing and then later development of methods. The methods development would be done in an inter-laboratory approach by laboratories volunteering their resources. “Methods” includes -Generating released material in a way informative to a real release scenario -Sampling that material in a way informative to decision needs -Measuring characteristics of the sampled material -Summarizing or extracting and reporting data from the measurements 4

SUPPORTING DOCUMENTS Provided on electronic drives and on the password protected project web site (ask for access if you need it) TG1 “Methods for the Release of MWCNTs from MWCNT-Polymer Composites” DRAFT TG2 “Release Characteristics of Selected Carbon Nanotube Polymer Composites” DRAFT TG3 “Potential Release Scenarios for Carbon Nanotubes used in Composites” final white paper. Phase 2.5 Report “Comparison of existing studies of release measurement for MWCNT-polymer composites: Report to the Steering Committee” DRAFT Phase 2.5 Question Matrix (Excel worksheet with detailed information on studies and interviews) Example of a Phase 3 Workplan Protocol (a rough example of the level of detail we need in terms of workplan elements)

Agenda (summary) Thursday 8:45AM – coffee Review of the Task Group efforts to give context of what is known – TG2 – materials – TG3 – scenarios – TG1 – methods – Brief statement of the “State of the Science” report Between coffee and lunch Provide context of 1) what has been studied and 2) what the project is thinking of in terms of initial approach to methods development – Phase 2.5 report (review of existing studies in light of the expert task reports) – Initial thoughts of Inter-laboratory Testing Group (ITG) as to how we can best proceed for methods development Thursday afternoon Breakout sessions to narrow down the scope and choose key elements of the methods development workplan. (more on this in following slides Friday morning Finish breakout reports Friday mid-morning to afternoon Convene a Steering Committee decision session to determine what will go forward to the ITG as a charge to develop the workplan

How the breakout sessions will inform the Steering Committee The Breakout Sessions will make recommendations on how to frame and address specific elements of a Workplan to further the development of widely accepted methods for nanomaterial release measurement. The recommendations should consider both a)What is well known (and so has established practice to build on) and b)What is needed most (for example, to assure we have methods to address key needs) The project Steering Committee will use the recommendations to make decisions about how to proceed in methods development. 7

Breakout Session and Group Structure 8 Breakout Groups 1 Breakout Sessions 23 Select Materials: CNT(s) and polymer (s) Methods for Release and Sampling Methods for Measurement B. Weathering/ Environmental B. Weathering/ Environmental A. Abrasion/ Consumer & Sanding/ Occupational A. Abrasion/ Consumer & Sanding/ Occupational ThursdayFriday

Questions?