Doc.: IEEE 802.11-10/1278r0 Submission BSS load balancing for MU-MIMO Date: 2010-11-09 Authors: Nov 2010 Slide 1Daewon Lee, LG Electronics.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0527r0 Submission March 2010 Slide 1 A Periodic 5 MHz Measurement Pilot for Channel Scan Date: Authors:
Advertisements

Haiguang Wang, Jaya Shankar, Zhongding Lei
Doc.: IEEE /0410r2 Submission March 2011 Slide 1 Data Transmission Protection on the IEEE ac MU-MIMO Downlink Date: Authors:
Doc.: IEEE /0364r1 Submission March 11, 2009 JT Chen et al (Ralink Technology Corp.) Slide 1 Comments on AOA and AOD Selection for a Multi-User.
Doc.: IEEE /0237r0 Submission February 12, 2009 Rolf de Vegt (Qualcomm)Slide 1 Inputs for a ac Spec Framework Methodology Date:
Doc.:IEEE /1275r0 Submission Laurent Cariou Nov, 2010 Slide 1 Complexity reduction for time domain H matrix feedback Authors: Date:
Submission doc.: IEEE 11-12/0553r0 May 2012 Jarkko Kneckt, NokiaSlide 1 Response Criteria of Probe Request Date: Authors:
Protocol for SU and MU Sounding Feedback
Doc.: IEEE /0259r02 Submission Date: ad New Technique Proposal March 2010 Yuichi Morioka, Sony CorporationSlide 1 Authors:
Submission doc.: IEEE 11-14/0802r0 Consideration on UL MU transmission Date: Slide 1Jinyoung Chun et. al, LG Electronics July 2014 Authors:
Doc.: IEEE /0627r00 Submission Yuichi Morioka, Sony Corporation Date: Why we need Length Field in VHT SIG May 2010 Slide 1 Authors:
Doc.: IEEE /0786r0 Submission July 2010 Daewon Lee, LG ElectronicsSlide 1 Pilot Sequence design up to 8 Spatial Streams Date: Authors:
Doc.: IEEE /1355r2 11ah Submission Date: Authors: Nov 2012 James Wang, MediaTek Slide 1.
Doc.: IEEE /0295r0 Submission PRAW Follow Up Date: Authors: March 2013.
Submission doc.: IEEE 11-10/0443r0 March 2014 Jarkko Kneckt, NokiaSlide 1 What Is P2P Traffic in HEW Simulation Scenarios? Date: Authors:
GroupID Concept for Downlink MU-MIMO Transmission
Doc.: IEEE /1550r1 Submission Nov 2011 Zander, I2R SingaporeSlide 1 Extension of AID and TIM to Support 6000 STAs in ah Date:
Doc.: IEEE /1205r1 Submission September 2011 ZTE CorporationSlide 1 Consideration on battery power alarm mechanism for IEEE ah framework.
Submission doc.: IEEE 11-13/1389r1 November 2013 Kiseon Ryu et.al, LG ElectronicsSlide 1 Discussion on HEW PAR Date: Authors:
Doc.: IEEE / hew Submission March 2014 Raja Banerjea, CSRSlide 1 A Simplified Simultaneous Transmit and Receive Mechanism Date:
Doc.: IEEE /0338r0 Submission March 2009 Chiu Ngo et al. (Samsung Electronics)Slide 1 Enhancement of ad-hoc Mode Date: Authors:
Doc.: IEEE /0313r1 Submission March 2011 Jarkko Kneckt, NokiaSlide 1 SU-MIMO Type for Group Addressed Frames Date: Authors:
Doc.: IEEE /0142r0 Submission January 2011 Nir Shapira, Celeno Communications DL MU-MIMO Support for non-AP STAs Date: Authors: Slide.
Doc.: IEEE /1345r0 Submission November 2013 Jiamin Chen, HuaweiSlide 1 Dynamic Channel Transfer(DCT) Procedure for IEEE aj ( 60GHz New Technique.
ZTE corporation doc.: IEEE /1086r2 September 2012 Submission TIM Compression for No Buffered Unicast Traffic Date: Slide 1 Authors:
Submission March 2012 doc.: IEEE Slide 1 SINR and Inter-STA Interference Indication Feedback in DL MU-MIMO Date: Authors:
Doc.: IEEE / Submission September 2010 James Wang, MediaTekSlide 1 PSMP-Based MU-MIMO Communications Date: 2010, September 14 Authors:
Doc.: IEEE /0342r0 SubmissionLiwen Chu Etc.Slide 1 Power Efficient PS Poll Date: Authors: Date: March, 2012.
Doc.: IEEE /0608r2 Submission May 2012 Shoukang Zheng et. al, I2R, SingaporeSlide 1 Low-Power PS-Poll Date: Authors:
Doc.: IEEE /0665r1 Submission May 2012 Anh Tuan Hoang et al (I2R) Slide 1 Prioritized PS-Polls Date: Authors:
Doc.: IEEE /1325r0 Submission Nov PS-Poll TXOP Date: Authors: David Xun Yang, Huawei, et. al.Slide 1.
Doc.: IEEE / 0052r0 Submission January 2011 Slide 1 Max Nss for SU BF Date: Authors: Sameer Vermani, Qualcomm.
Submission doc.: IEEE 11-13/1100r0 September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 HEW SG Progress Review Date: Authors:
Doc.: IEEE /0324r0 Submission Slide 1Michelle Gong, Intel March 2010 DL MU MIMO Error Handling and Simulation Results Date: Authors:
Doc.: IEEE /0567r0 Submission Slide 1Michelle Gong, Intel May 2010 DL MU MIMO Analysis and OBSS Simulation Results Date: Authors:
Submission doc.: IEEE 11-12/771r0 July 2012 Jarkko Kneckt, NokiaSlide 1 FILS STA Support for QoS, HT and VHT? Date: Authors:
Doc.: IEEE /0517r0 May 2013 Submission Slide 1 Authors: Combining Process in Virtual CS Mechanism for ah Date: Lv kaiying, ZTE.
Doc.:IEEE /xxxxr0 Submission Nov. 8, 2010 Notification on Change of BW & Rx Nss Joshua Zhao, et al1 Date: Authors:
Doc.: IEEE /0782r0 Submission July 2010 Daewon Lee, LG ElectronicsSlide 1 STA MU-MIMO Group Management Signaling Design Date: Authors:
Doc.: IEEE /0783r0 Submission July 2010 Daewon Lee, LG ElectronicsSlide 1 MU-MIMO support for BSS load balancing Date: Authors:
Doc.: IEEE /1277r0 Submission MU-MIMO support for Heterogeneous Devices Date: Authors: Nov 2010 Slide 1Byeongwoo Kang, LG Electronics.
GroupID Concept for Downlink MU-MIMO Transmission
Doc.: IEEE /1123r0 Submission September 2010 Zhu/Kim et al 1 Date: Authors: [TXOP Sharing for DL MU-MIMO Support]
Doc.: IEEE /1244r1 Submission Nov.2010 Sun Bo, ZTE CorpSlide 1 Authors: Transmission Mechanism in MU-MIMO Date:
Slide 1 doc.: IEEE /1092r0 Submission Simone Merlin, Qualcomm Incorporated September 2010 Slide 1 ACK Protocol and Backoff Procedure for MU-MIMO.
Doc.: IEEE /0440r1 Submission July 2013 Jiamin Chen, HuaweiSlide 1 Dynamic Channel Transfer(DCT) procedure for IEEE aj ( 60GHz ) Date:
Submission doc.: IEEE /0327r0 March 2015 Jarkko Kneckt, NokiaSlide 1 Microsleep for HE STA Date: Authors:
Doc.: IEEE /1190r2 September 2014 Submission Kaiying Lv (ZTE) Frame Exchange Control for Uplink Multi-user transmission Slide 1 Date:
Doc.: IEEE /2897r3 Submission May 2008 Qi Wang, Broadcom CorporationSlide 1 Efficient TIM element supporting multiple BSSIDs Date:
Submission doc.: IEEE 11-12/0281r0 March 2012 Jarkko Kneckt, NokiaSlide 1 Recommendations for association Date: Authors:
Doc.: IEEE /0065r0 Submission January 2014 William Carney, SONYSlide 1 Comments on Draft HEW PAR Date: Authors:
Doc.: IEEE /0897r0 SubmissionJae Seung Lee, ETRISlide 1 Active Scanning considering Operating Status of APs Date: July 2012.
Doc.: IEEE / Submission September 2010 James Wang, MediatekSlide 1 Wide Band OBSS Friendly PSMP Date: 2010, September 13 Authors:
Doc.: IEEE /1378r0 Submission November 2008 Darwin Engwer, Nortel NetworksSlide 1 Improving Multicast Reliability Date: Authors:
SubmissionJoe Kwak, InterDigital1 BSS Load: AP Loading Metric for QOS Joe Kwak InterDigital doc: IEEE /0079r0January 2005.
Doc.: IEEE /1086r0 SubmissionSlide 1 Date: Authors: Improved Virtual Carrier Sensing Mechanism for 45GHz Sep ZTE Corp.
Doc.: IEEE /0787r1 Submission MU with Frequency Domain Multiplexing July 2010 ChaoChun Wang et al, MediaTekSlide 1 Authors:
Doc.: IEEE /1034r0 Submission September 2015 Yongho Seok, NEWRACOM Notification of Operating Mode Changes Date: Authors: Slide 1.
BSS Load Information in ax
BSS Load Information in ax Follow up
BSS Load Information Element for 11ax
BSS Load Information in ax
MU-MIMO STA scheduling strategy and Related PHY signaling
Preamble design aspects for MU-MIMO support
MU-MIMO STA scheduling strategy and Related PHY signaling
Fair Quiet for DFS Date: Authors: February 2008
MU-MIMO STA scheduling strategy and Related PHY signaling
MU-MIMO support for Heterogeneous Devices
MU with Frequency Domain Multiplexing
BSS Load Information Element for 11ax
Presentation transcript:

doc.: IEEE /1278r0 Submission BSS load balancing for MU-MIMO Date: Authors: Nov 2010 Slide 1Daewon Lee, LG Electronics

doc.: IEEE /1278r0 Submission BSS load balancing without MU-MIMO Example scenario with two AP with only legacy STAs –If BSS load of AP1 is lower than AP2 than association with AP1 will give better throughput for the STA Nov 2010 Slide 2Daewon Lee, LG Electronics

doc.: IEEE /1278r0 Submission BSS load balancing with MU-MIMO Example scenario with two AP with legacy STAs and MU-MIMO supported STAs –In case BSS load of AP1 similar to AP2 and MU-MIMO supported STAs associated with each AP is different, association with which AP will give more benefits to the STA? Nov 2010 Slide 3Daewon Lee, LG Electronics

doc.: IEEE /1278r0 Submission Example of BSS load status (1/3) Example timeline for an AP with only legacy STAs –BSS load is calculated by ratio of idle and busy time in a given measurement window –BSS load status definition will still work for SU-MIMO Nov 2010 Slide 4Daewon Lee, LG Electronics

doc.: IEEE /1278r0 Submission Example of BSS load status (2/3) Example timeline for an AP with only MU-MIMO capable STAs –BSS load status definition does not take into account under utilized spatial streams which is available by MU-MIMO STA pairing Nov 2010 Slide 5Daewon Lee, LG Electronics

doc.: IEEE /1278r0 Submission Example of BSS load status (3/3) Example timeline for an AP with legacy STAs and MU- MIMO capable STAs –BSS load status definition only give partial information of actual load and does not take into account spatial stream utilization Nov 2010 Slide 6Daewon Lee, LG Electronics

doc.: IEEE /1278r0 Submission BSS Load Element [3] BSS load element contains ‘Channel Utilization’ –Channel Utilization = Integer((channel_busy_time/(dot11ChannelUtilizationBeaconInter vals × dot11BeaconPeriod × 1024)) × 255) –“channel_busy_time” is defined by CS busy time within the measurement window –No consideration of actual system capacity of MIMO-capable APs Nov 2010 Slide 7Daewon Lee, LG Electronics

doc.: IEEE /1278r0 Submission Issues with 11n BSS load element Channel Utilization metric –does not take into account additional resource dimensionality the MU-MIMO capable AP has resource dimensions { time, frequency, space } Station Count –does not distinguish STAs with MU-MIMO support Nov 2010 Slide 8Daewon Lee, LG Electronics

doc.: IEEE /1278r0 Submission General observations and Suggestion General observations – BSS load element does not seem to adequately take into account particulars of MU-MIMO operation –BSS load balancing in MU-MIMO environment are especially important since MU-MIMO benefits high data rate transmissions and large number of active STA –Better mechanisms supporting MU-MIMO supported environments seems necessary Potential solution is to introduce a new control element for MU-MIMO supported STA association Nov 2010 Slide 9Daewon Lee, LG Electronics

doc.: IEEE /1278r0 Submission MU-MIMO BSS load element (1/2) Propose to adopt an additional BSS load element (MU- MIMO BSS load element) –Keep existing BSS load indication for legacy load balancing –Support extra BSS load element to benefit 11ac devices Desired characteristics –Non duplicate information from legacy BSS load element –Information on utilized or under-utilized level of AP’s potential MU-MIMO capacity Nov 2010 Slide 10Daewon Lee, LG Electronics

doc.: IEEE /1278r0 Submission MU-MIMO BSS load element (2/2) New BSS load element should strive to utilize medium characteristics of MU-MIMO transmission channel –e.g. Idle / Busy : SU-MIMO transmission (STA-to-AP, AP-to-legacy STA) / Partially Busy : MU-MIMO transmission (AP-to-11ac STA) Exact Formulation needs further study Nov 2010 Slide 11Daewon Lee, LG Electronics

doc.: IEEE /1278r0 Submission ac BSS MU-MIMO Load Element MU-MIMO load element –Proposed load element is entirely optional (Just as the original BSS load element) and only broadcasted if such capability is supported by AP (e.g. only implemented if AP is ‘MU-MIMO capable’ AND ‘dot11QBSSLoadOptionImplemented’ is true) –Does not replace the BSS load element, is an addition to existing load element MU-MIMO load element contains ‘TBD’ –TBD may compose of 1 or multiple information values Nov 2010 Slide 12Daewon Lee, LG Electronics

doc.: IEEE /1278r0 Submission Pre-Motion Do you support to define an additional load information element target for MU-MIMO capable devices as shown in slide 12? –BSS load element for MU-MIMO contains 1 octet element ID field, 1 octet length field, and N octet TBD field, in which N is TBD –Yes : No : Abstain : Nov 2010 Slide 13Daewon Lee, LG Electronics

doc.: IEEE /1278r0 Submission References [1] Greg Breit, Nachiket Desai, “Multi-User AoD Diversity Measurements,” IEEE /0699r0 [2] Kwak, B.-J. et al., “Measured Channel Capacity and AoD Estimation for Multi-User MIMO Scenarios,” IEEE /0543r0 [3] “Wireless LAN Medium Access Control (MAC) and Physical Layer (PHY) Specifications”, IEEE Nov 2010 Slide 14Daewon Lee, LG Electronics