Contracting with WYDOT

Slides:



Advertisements
Similar presentations
DBE: Disadvantaged Business Enterprise Program DBEs are generally small firms owned and controlled minority or women.
Advertisements

Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Construction Engineering 221
MoneyWi$e: Good Credit Good Credit Money Wi$e –A joint financial education project of Consumer Action and Capital One.
1 Texas Department of Agriculture The Food Service Management Company Contracting Process Food and Nutrition Division Texas Department of Agriculture.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
Historically Underutilized Business Program Texas Department of Insurance Special Deputy Receiver Program January 2008.
Contractor Desktop Electronic Bid System Training.
1. In Accordance With : 2 Highest Level Lowest Level.
MDA Disaster Recovery Division Section 3 Program Training on Section 3 Requirements Section 3 Requirements Sponsored by the Mississippi Development Authority.
“Opening the Door to Bonding” U.S. Small Business Administration Surety Bond Guarantee Program.
Office of Purchasing and Contracts Procurement Outreach Training Level II – Module A Orders between $10,000 and $50,000.
Financial Policies Training: Payments to Individuals for Services (2.3.1) Effective Date: January 1, 2009.
MS Military Department-State Purchasing and Contracting Division State Small Procurement Credit Card Use April 2010.
Mi-Project Program Breakout Session MDIT/DMB. IT Supplier Forum Breakout Session: Mi-Project Program Mi-Project  Introductions  Diana Quintero, MDIT.
Are you Sure About That? Pete Stamps CPPO, VCO Paul Higgins VCO.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
Prequalification Process / Subcontract Lisa Conomy Construction Counsel, OSU Lane Beougher State Architect.
Finalizing the IEP Process Consent for Initial IEP PWN following the IEP Copies to Parent IEP Amendments Revocation of Consent West Virginia Department.
Oklahoma Department of Transportation Susan McClune Regulatory Services.
INDOT Contractor Prequalification.
Subrecipient Monitoring OFFICE OF RESEARCH ADMINISTRATION 2010.
Questionnaire Regarding Subcontractor Prompt Payment Provision Prepared by.... Cal J. Gendreau, NDDOT Gene Wortham, ITD Julie Trunk, FHWA AASHTO Subcommittee.
Subcontracts 101 By Mitali Ravindrakumar USC Collaboration between Parties Perform Subcontractor Analysis Sponsor - Fund Project/Subcontr act Negotiate.
1 U.S. Small Business Administration Surety Bond Guarantee Program for Small Businesses.
Marcy Mealy Procurement Specialist CDBG Program
Conducting Collaborative Projects Part 4 OSP Awareness Feb 16, 2011 osp.syr.edu
CIVL202 Construction Engineering I
Contracting with WYDOT
Project Close Out CTC-470.
PROCEDURES FOR SELECTING THE CONTRACTOR
 DBE is a for profit business that is 51% minority or woman owned, whose management and daily operation is controlled by one or more socially or economically.
SURETY BOND GUARANTEE PROGRAM. What is a Surety Bond? Agreement between: Business/Contractor Surety Company Obligee (Project Owner) The types of contract.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Proposed Supplier Registration Module By Procurement Policy Office (MOFED) and Nextenders (India) Private Limited.
Subcontract Requests. P rocess After the notice to begin work is issued, Construction Procurement uploads the contract into SiteManager. At that point.
U.S. Small Business Administration
Improving Understanding, Function and Procedural DBE Compliance ODOT OCR DBE Triage Training Office of Civil Rights DBE Program ODOT Training March 1,
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Allen Hughes State Materials Office
Commonwealth Self Bonding Program by the Department of General Services – Division of Engineering and Buildings Department of Treasury – Division of Risk.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
Charter School 2015 Annual Finance Seminar Grant Management Office of Grants Fiscal September 11, 2015.
CONSTRUCTION CONTRACTS DOCUEMENTS
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Reimbursement Statements What you need to know. Let’s Take a Closer Look… …at invoicing, cost ledgers, SB and budget revisions.
State of Connecticut Consultant Selection Office 2015 Consultant Prequalification Process Presented by the Connecticut Department of Transportation (CT.
DAS Contractor Prequalification ‘07 changes Program Overview and 2007 Program Changes resources introduction Department of Public Works January.
American Recovery and Reinvestment Act of 2009 Energy Efficiency and Conservation Block Grant Program Small City and County Grant Kick-Off Meeting California.
Finance Sub-Committee Report NGEC Annual Meeting Washington, DC February 21, 2014.
Sponsored Project Administration Fall 2012 CERTIFICATION PROGRAM Sponsored Project Lifecycle Introduction Overview Creating a Project Budget Compliance.
 GDOT 101 GEORGIA DEPARTMENT OF TRANSPORTATION DBE SUPPORTIVE SERVICES PRESENTS… GDOT 101 NEXT STEPS AFTER DBE CERTIFICATION – DOING BUSINESS WITH GDOT.
Small Purchase of Professional Service Providers Administrative Rule R
1 Risk Management Bonding & Insurance Jimmy Porter Risk Analyst City of Atlanta.
Contract Compliance Training. Department Personnel Office of the General Counsel (OGC) Mario K. Castillo General Counsel John Guest Deputy General Counsel.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
FIDIC Tendering Procedures
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Contract Compliance Training
Metra Construction Contractor Prevailing Wage Workshop
Award Management Services
Evaluation Grids Evaluation Grids.
Understanding The Benefits Of Surety Bonds
Contract Compliance Training
Completing the State Aid Payment Request
Procurement.
Instructions for New Contractors Construction Division
Diversity management system (DMS)
Presentation transcript:

Contracting with WYDOT The basics to become Pre-qualified with WYDOT for Highway Projects

WYDOT Pre-Qualification System Bidding Capacity based on: Financial Worth Work Under Contract Equipment Contractor Performance Rating

WYDOT Pre-Qualification System All persons, firms, co-partnerships, or corporations proposing to bid on any Wyoming Department of Transportation (WYDOT) construction project must first submit a statement, under oath, on a Prequalification Questionnaire (Form PQ-2) available through the Wyoming Department of Transportation.

WYDOT Pre-Qualification System On the application you need to indicate the Applicant's financial ability, the adequacy of its equipment, organization, and past experience, and include any pertinent information necessary to accurately assess the Applicant's status. Contractors wanting to subcontract do not have to be prequalified.

WYDOT Pre-Qualification System Prequalification will encompass a 15 month period from the date of the Applicant’s fiscal year end. Out of date financial reports will not be considered as part of the Prequalification statement, thus rendering it incomplete.

WYDOT Pre-Qualification System The Prequalification Form once approved does not approve a contractor to bid on projects (building) let through the WYDOT Procurement office or the WYDOT Engineering Services office. That process will be covered later.

WYDOT Pre-Qualification System Prequalification may be denied or revoked if the applicant:  A) Is declared in default while qualified in accordance with the applicable provisions of any contract issued by WYDOT. B) Has been determined to have made false, deceptive, or fraudulent statements during the prequalification process. C) Has been and is currently under debarment or restricted from bidding by another government agency because of criminal acts or serious breach of contract.

WYDOT Pre-Qualification System D) Has been disqualified for substantial reasons by another governmental agency. E) Has attempted to or has influenced WYDOT policy through gratuities or gifts to, or by employing WYDOT personnel. F) Has, while qualified, demonstrated an inability to meet WYDOT requirements for specifications and contracts.

WYDOT’s Process Upon receipt of the Prequalification Questionnaire, the Prequalification Officer examines and verifies the information submitted. Incomplete forms will be returned to the Contractor. Applications may take up to two weeks once all required information has been received.

WYDOT’s Process A decision regarding the applicant’s prequalification and rating including the type of work classification is made after all information has been received. The WYDOT Prequalification Officer will notify the Contractor of their application status.

WYDOT’s Process The Applicant's previous and present job performance will be evaluated by using the WYDOT’s contractor performance evaluation system to determine the current prequalification rating. Work performed by subcontractors is reflected in the Contractor's performance evaluation.

WYDOT’s Process If approved by the Prequalification Officer, an additional 90 day extension may be granted if the Applicant plans to revise its fiscal year. Contact the Pre-Qualification Office to see if you qualify for an extension.

Joint Ventures WYDOT will issue a joint venture proposal envelope to prequalified applicants upon request. For more information about forming a joint venture, please contact the prequalification office at 307-777-4056

AML & Other Entities use the WYDOT Pre-Qualification System Prequalification for AML work will cover all aspect of the prequalification. The PQ-2 has to be filed with WYDOT. AML representatives will determine if a contractor’s prequalification amount can be changed to perform the work financially. Many Cities, Towns and Counties use the WYDOT Pre-qualification list.

WYDOT Bid Envelopes The Applicant requesting a Proposal Envelope will be required to submit a Current Work Affidavit (Form E-103) and indicate the total dollar value of all work under contract or subcontract regardless of the contracting agency. The current prequalification will be determined by subtracting the current work remaining to be completed from the Applicant's maximum prequalification rating.

WYDOT Bid Envelopes In order to bid on a WYDOT Highway project, a contractor’s prequalification can not expire before the bid letting. Example: A pre-qualification expiring on March 31, 2014 the contractor will not be allowed to bid in April.

Contact Information Direct questionnaires, correspondence, and questions regarding highway contractor prequalification to:   Jim Messer Prequalification Officer Construction Program 5300 Bishop Boulevard Cheyenne, WY 82009-3340 (307)777-4056

Web Links http://www.dot.state.wy.us/home/business_ with_wydot/pre_qualification.default.html Will find information and forms to submit a pre-qualification for Highway & Purchasing projects. List of Pre-Qualified Contractors

Questions? ??

Important things to know about WYDOT Highway Contracts You do not have to be Pre-Qualified to be a Sub-Contractor or Supplier. Subcontracts are submitted by the Prime Contractor using Form E-59. All Subcontracts need to be approved by the WYDOT State Construction Engineer’s office

Prompt Payments to Subcontractors WTDOT requires Prime Contractors to pay their subcontractors to be paid promptly after payment. The subcontractor is required to fill out a Certification of Subcontract Payments (Form E-139) indicating the subcontractors receipt of payment.

Planholders List Can be found at: http://ipd.dot.state.wy.us/IPD/ The letter “B” indicates that that company has been issued a bid envelope.

Subcontract Information Contact Russ Howe @ 307-777-4053 Web Information: http://www.dot.state.wy.us/home/business_ with_wydot/contractors/subcontracts.html

Subcontract Questions ???

Specifications for Highway Work 2010 Standard Specifications for Road and Bridge Construction. Book contains 8 Divisions Division 100- General Provisions Division 200 – Earthwork Division 300 - Aggregate Materials Division 400 – Pavements Division 500 – Structures Division 600 – Miscellaneous Construction Division 700 – Traffic Control & Roadway Lighting Division 800 - Materials

Specifications Continued Changes to the book since it was printed are called Supplemental Specifications. Specifications that are unique to the project are Special Provisions.

What Governs? 1. Contract Amendments 2. Addenda 3. Contract (Form E-82A) 4. Department Obtained Agreements 5. Proposal (Form E-91) 6. Special Provisions

What Governs continued? 7. Supplementary Documents 8. Plans 9. Supplementary Specifications 10. Standard Plans 11. Standard Specifications 12. Electronic CADD Files

Disputes Against WYDOT - Must be filed through the Prime Contractor. Against the Prime Contractor – If an issue involving payment by the contractor to a subcontractor becomes the subject of dispute, the party (contractor or subcontractor) raising the dispute is responsible for promptly submitting a written description of the dispute to the engineer. State clearly who the dispute is between, the reason for the dispute, the dollar amount involved, and other pertinent information.

Specification Information Andy Long, State Construction Engineer 307-777-4425 Printed Copies Available through Financial Services. (307)777-4435 Web Information: http://www.dot.state.wy.us/home/engineerin g_technical_programs/manuals_publications/ 2010_Standard_Specifications.html

What you will find: Electronic Copy of the 2010 Standard Specifications. Copies of all current Supplemental Specifications.

The End Questions? Thank You!