Chapter 9: Probabilistic Scheduling Models

Slides:



Advertisements
Similar presentations
© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson 8-1.
Advertisements

McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. A PowerPoint Presentation Package to Accompany Applied Statistics.
Prepared by Lloyd R. Jaisingh
0 - 0.
Addition Facts
3/20/2003CVEN Maxwell 1 PERT – Program Evaluation & Review Technique Module: PERT Modified: February 20, 2003.
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 6 Scheduling. 222 Learning Objectives Estimate the duration for each activity Establish the estimated start time and required completion time.
Chapter 10 Project Scheduling: PERT/CPM
Chapter 7 Project Management
CP Chapter 4 Schedule Planning.
Chapter 17 Project Management McGraw-Hill/Irwin
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Precedence Diagram Technique Precedence Networks Critical Path Analysis.
Finding the Critical Path
Project Management in Practice, Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
Project Management CPM/PERT Professor Ahmadi.
1 1 Slide © 2006 Thomson South-Western. All Rights Reserved. Slides prepared by JOHN LOUCKS St. Edwards University.
Chapter 13 Project Scheduling: PERT/CPM
Chapter 9 Project Scheduling: PERT/CPM
Chapter 3 Project Management.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Week 1.
Chapter 15: Quantitatve Methods in Health Care Management Yasar A. Ozcan 1 Chapter 15. Simulation.
Introduction to Management Science
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Operations Management Session 27: Project Management.
Scheduling the Project
MEM 612 Project Management Chapter 5 Scheduling the Project.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Project Uncertainty Management.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
In the name of Allah the Most Gracious the Most Merciful.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 3 part 2 Project Management.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Project Management Techniques.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
SEEM 3530 Program Evaluation and Review Technique
MATHEMATICS 3 Operational Analysis Štefan Berežný Applied informatics Košice
Real-World Project Management Chapter 13. Characteristics of Project Management Unique one-time focus –Difficulties arise from originality Subject to.
Uncertainty in Future Events Chapter 10: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
“WHY ARE PROJECTS ALWAYS LATE?” (“and what can the Project Manager DO about that?) Craig Henderson, MBA, PMP ARVEST Bank Operations.
Project Management (專案管理)
9-1 Chapter 9 Project Scheduling Chapter 9 Project Scheduling McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Chapter 7 PERT Project Management for Business, Engineering, and Technology.
1 3. M ODELING U NCERTAINTY IN C ONSTRUCTION Objective: To develop an understanding of the impact of uncertainty on the performance of a project, and to.
Project Scheduling Software
PERT/Activity Diagrams, Completion Probability and the Z Score
Change management control Sources of Change  Project scope changes  Implementation of contingency plans  Improvement changes ISE Ch. 6 1.
MEM 612 Project Management Chapter 5 Scheduling the Project.
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
Chapter 7 : Risk Management – part 2
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
PERT CPM assumes duration of activity is known with certainty.
PERT/Activity Diagrams, Completion Probability and the Z Score
Project Management (專案管理)
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
deterministic Fixed and known in advance, representing a
Project Planning & Scheduling
AOA A style of project network diagram in which arrows
PERT/Activity Diagrams, Completion Probability and the Z Score
Managing Risk Chapter 7.
Presentation transcript:

Chapter 9: Probabilistic Scheduling Models project evaluation and review technique (PERT) Simulation Chapter 6: Quantitative Project Scheduling Methods This chapter focuses on the critical path method, the fundamental project scheduling technique assuming certainty and unlimited resources. Project crashing is discussed as a means of analyzing alternative cost/time tradeoffs. Resource leveling and resource smoothing are discussed as ways to consider limited resources. Buffers are discussed as a way to cope with risk. Criticisms of the critical path method are reviewed.

PERT reflects PROBABILISTIC nature of durations assumes BETA distribution same as CPM except THREE duration estimates optimistic most likely pessimistic

PERT Calculation a = optimistic duration estimate m = most likely duration estimate b = pessimistic duration estimate expected duration: variance:

PERT Example CRITICAL PATH: A-B-D EXPECTED DURATION: 3.33+6.17+3=12.5 activity duration predecessor te A requirements analysis 2/3/6 weeks - 3.33 B programming 3/6/10 weeks A 6.17 C get hardware 1/1/2 week A 1.17 D train users 3/3/3 weeks B, C 3.00 CRITICAL PATH: A-B-D EXPECTED DURATION: 3.33+6.17+3=12.5 VARIANCE: {(6-2)/6}^2 +{(10-3)/6}^2+{(3-3)/6}^2=1.805 STD = 1.344

PERT Path Variance IF YOU ASSUME INDEPENDENCE the variance of any path = sum of activity variances for all activities on that path NORMALLY DISTRIBUTED variance of the PROJECT = variance of the CRITICAL PATH if more than one critical path, PROJECT VARIANCE=largest of CRITICAL

PERT Variance since NORMALLY DISTRIBUTED can estimate probability of completing project on time can estimate probability of completing project by any target date if critical path expected = 9.5, STD=1.354 target=10 Z=(10-9.5)/1.354 = .369 probability = .644

PERT Estimates so what do you mean by optimistic, pessimistic? value you expect to be exceeded at a probability level and not exceeded at 1-a probability PROBLEM: estimating the MOST LIKELY duration of most things is hard asking estimators to come up with “What won’t be exceeded 95% of the time” is blowing in the wind.

Network Scheduling Methods a number of methods exist Gantt chart provides good visual network shows precedence well CPM identifies critical activities PERT reflects probability SIMULATION more accurate (still need data)

Why Simulate? uncertainty tool for study of expected performance for uncertainty, complexity Chapter 7 Probabilistic Scheduling Models This PPT provides a very brief overview of the benefits of simulation over PERT relative to evaluating the risk associated with information system project management. The generic EXCEL CPM model is the basis of simulation. Chapter 7 material requires working with EXCEL, following text material. Simulation is not typically covered in IS or IT courses, but provides a valuable means of analysis.

what is simulation? develop an abstract model of a system CPM is a precedence model whenever uncertain events are encountered, use random numbers to determine specific outcomes keep score (describe the DISTRIBUTION of possible outcomes)

project management tools CPM - sort out complexity (assumes certainty) PERT - considers uncertainty but assumes an unrealistic distribution SIMULATION set up model run it over and over keep score of the outcomes (any one of which are possible)

CPM model start all activities as soon as you can need to know when all predecessors done = start time duration is probabilistic (described by a distribution) use random number to determine specific duration from all possible outcomes finish time = start time + duration

Excel Model

distributions Beta - assumed by PERT; Normal mathematically convenient Normal requires symmetry, infinite limits Triangular - more flexible than normal, close approximation exponential - not likely lognormal - might fit, but inflexible

Output Analysis Can generate as many samples as desired Can calculate probability by count do NOT have to assume any distribution count is easier, more accurate than normal formulas Simulation is often the means used to generate distribution tables

why should a manager care? simulation provides greater accuracy than PERT simulation the most flexible analytic tool

Summary Project durations have high degrees of uncertainty PERT a probabilistic form of CPM Sound idea – reflects uncertain durations Not much more accurate – too rigid Simulation a much more flexible and appropriate tool for modeling uncertainty