Joint BARCfirst-BENS-BRMA Infrastructure Symposium June 25, 2009.

Slides:



Advertisements
Similar presentations
Ground failures: Vibration of soil Fault rupture Liquefaction Ground lurching Differential settlement Lateral spreading.
Advertisements

17 June 2009 GP/DRR, Geneva UNCRD project School Earthquake Safety Initiative (SESI) in Asia and the Pacific Shoichi Ando Coordinator, Dr. Disaster Management.
Subterranean Success: Geothermal Energy Powering Schools
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
1 HYATTSVILLE VOLUNTEER FIRE prince georges county, maryland MICHAEL HACKLEY ARCHITECTS.
Workplace, Course Centre, Municipality and Regional Tourism: An Integrated Mobility Management in Magglingen/Evilard, Switzerland ECOMM San Sebastian,
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Putting USGS Research to Use: User Perspectives on Research Evolution, Accomplishments, and Challenges USGS Earthquake Hazards Program (EHP) Lloyd S. Cluff.
1. 2 Earthquake effects on health care facilities 2.
Customer Service.
ABC Technology Project
S. L. King & Associates, Inc. Engineers Planners Managers Aviation Safety, Security & The Environment Asset Management and Planning of Utilities Infrastructure.
Riverside Community College District Free Bus Ride Program.
Target Costing If you cannot find the time to do it right, how will you find the time to do it over?
 Depth Into the earth Surface of the earth Distance along the fault plane 100 km (60 miles) Slip on an earthquake fault START.
Visual 5.1 General Staff Functions Unit 5: General Staff Functions.
John Barton, P.E. Assistant Executive Director for Engineering Operations Texas Department of Transportation Mid-States Highway-Rail Safety Conference.
25 seconds left…...
The Community Action Plan for Seismic Safety (CAPSS) Overview, Loss Estimates, and Policy Recommendations John Paxton Co-Chair, CAPSS Advisory Committee.
1 Vulnerability of People People  age  density  gender  ethnicity and language  socio-economic status.
Geology for Engineers The San Andreas Fault: The Geological and Civil Engineering Implications.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Liquefaction, Landslides, and Fault Rupture Tom Holzer Research Engineering Geologist 1.
LOMA PRIETA, CA EARTHQUAKE OCTOBER 17, 1989 Dr. Walter Hays, Global Alliance For Disaster Reduction.
Charles SCAWTHORN Junji KIYONO Kyoto University Earthquake Risk Reduction 3- Mitigation and ERR Program Development 1. Concepts and Terminology 2. Hazard,
San Francisco Geological Study By Emily Williams Victoria Hogg.
38° 37.5° 37° 123°122°121° google: cisn shakemap nc
EBMUD: A Decade of Seismic Mitigation Progress – More Work to Do By Bill Cain, S.E. Project Manager Seismic Mitigation Planning Member, ABAG Lifeline Infrastructure.
USC Civil & Environmental Engineering St. Andreas Fault Right-Lateral Strike-Slip Faults Location: Carrizo Plain area, San Luis Obispo County, California.
ECIV 320 Structural Analysis I Structure A system of connected parts used to support load A structure is designed to serve a specific function for public.
California Earthquakes. Sylmar Earthquake About: When: 6:00 A.M. February 9, 1971 Where: San Fernando Valley What: Ruptured segment of the San Fernando.
November 7, 2012 DUMBARTON RAIL CORRIDOR PROJECT.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
LESSONS FROM PAST NOTABLE EARTHQUAKES. Part III Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA.
LOMA PRIETA EARTHQUAKE OF WHAT WAS IT? The Loma Prieta earthquake, also known as the World Series earthquake, was a major earthquake that struck.
Future Bay Area Earthquakes – Water & Sewer Issues JEANNE PERKINS ABAG Earthquake and Hazards Program Consultant.
 WHAT THE TASK FORCE COMMITTEE DID ?  WHY DOES ANDOVER NEED A NEW TOWN YARD?  WHAT ARE THE COST IMPACTS OF NOT DOING ANYTHING?  WHAT ARE THE BENEFITS.
Structural Engineering Issues for a Large Cascadia Event.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
Don’t Scrub When You Can Be Clean A Mobile CNG Pipeline Operational in 6-12 months Low capital expense Relatively short contract duration Phased-in approach.
Real World Applications of USGS EQ Science: Stacy Bartoletti Degenkolb Engineers Structural Engineers Association of Washington Cascadia Region Earthquake.
Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review.
Transportation leadership you can trust. presented to TRB Planning Applications Conference presented by Vamsee Modugula Cambridge Systematics, Inc. May.
Bridge Toll Increase for Transit Senate Select Committee June 3, 2002.
Regional Transportation Emergency Management Plan BARCFirst, BENS & BRMA Joint Infrastructure Symposium June 25, 2009 Radiah T. Victor, Sr. Program Coordinator.
The Next Bay Area Earthquake
Bay Area Earthquake Impacts and Earthquake Impacts on Utilities and Transportation Systems Infrastructure Interdependencies Workshop I – Utilities and.
Bringing Science to the Art of Underwriting™ TM Welcome to Earthquake Country: Impact of future quakes Mary Lou Zoback, Ph.D. Vice President, Earthquake.
Bay Area Earthquakes – Utility & Lifeline Issues Bay Area Earthquakes – Utility & Lifeline Issues JEANNE PERKINS Consultant, ABAG Earthquake and Hazards.
1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.
Northern California Earthquake Hazards Workshop February 12, 2014.
Earthquake Risk in the Bay Area: The Hayward Fault Ellen Metzger BAESI March 23, 2013.
Ashley L., TiAni T., Joe O., Kyle V.. California North American & Pacific Plates Major cities: Richmond, Berkeley, Oakland, San Leanardo, Hayward and.
Governor’s Office of Emergency Services Association of Bay Area Governments School & Health Care Systems School & Health Care Systems Bay Area Disaster.
City of Santa Rosa Hazard Mitigation Plan Project Kickoff.
Impact of the California High Speed Rail System Lee Ann Eager, Chief Operating Officer Economic Development Corporation serving Fresno County.
THE FOUR PHASES OF EMERGENCY MANAGEMENT. GIS and Preparedness The process of identifying potential emergency management problems that a community may.
Update Presentation January 12, 2015 Town of Concord School Bus Transportation and Maintenance Center Town Project Team: Christopher Whelan – Town Manager.
Dr. Walter Hays US Geological Survey (Retired) Global Alliance for Disaster Reduction.
ABAG Infrastructure Interdependencies Workshop I January 31, 2012.
BART: The Next 40 Years Critical Reinvestment Needs
Stefanie Hom, Metropolitan Transportation Commission | AMPO | October 24, 2014 Climate Change and Extreme Weather Adaptation Options for Transportation.
What does a civil engineer do?
Bridge across San Andreas Fault at Parkfield
Last Ice Age. Last Ice Age Classification of Estuaries - Geological Coastal Plain Estuary (= Drowned River Estuary)
HayWired We Can Outsmart Disaster
Presentation transcript:

Joint BARCfirst-BENS-BRMA Infrastructure Symposium June 25, 2009

Hayward Fault parallel to BART and crosses BART last major rupture of Hayward Fault (130- to170-year return cycle). Four earthquake scenarios most likely to damage BART: 7.0 Hayward Fault 8.0 San Andreas Fault 6.7 Concord Fault 6.7 Calaveras Fault Bay Area Faults and BART

Retrofit Locations 3 Lafayette Transbay Tube and Associated Structures 22 Miles of Aerial Guideways 19 BART Stations 4 Train Maintenance Yards Parking, Operations and Administration Structures Power, Mechanical, Train Control and Communications Equipment 1 BART-Owned SF Muni Facility

Aerial Guideway Vulnerability Foundations too Small Potential for Crumbling of Columns, Similar to Cypress Freeway Total of 1,918 Aerial Guideway Supports

Strengthen Foundations Jacket Columns (10-15%) Add Shear Keys (10-15%) Aerial Guideway Retrofit Concepts Life SafetyOperability Add Piles (Where Appropriate) Similar Station Retrofits

Engineering Earthquake Response Team

SERA Analysis

Questions & Answers BART is Committed to Safeguarding Bay Area Transportation and Economic Well-Being Community Relations Manager: Catherine Westphall