©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY.

Slides:



Advertisements
Similar presentations
© 2008 Oracle Corporation – Proprietary and Confidential.
Advertisements

Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 16 Unemployment: Search and Efficiency Wages.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 13 International Trade in Goods and Assets.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Science Subject Leader Training
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Joint ATS-WASC Accreditation Reviews Jerry McCarthy, ATS Teri Cannon, WASC.
NCATS REDESIGN METHODOLOGY A Menu of Redesign Options Six Models for Course Redesign Five Principles of Successful Course Redesign Four Models for Assessing.
Medium-term strategic plan: planned financial estimates for the period E/ICEF/2009/AB/L.5.
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
Planning and use of funding instruments
The Implementation Structure DG AGRI, October 2005
Webinar: June 6, :00am – 11:30am EDT The Community Eligibility Option.
Gaining Senior Leadership Support for Continuity of Operations
IBM Corporate Environmental Affairs and Product Safety
EMS Checklist (ISO model)
Management Plans: A Roadmap to Successful Implementation
Presentation of the proposed Annex 19 – Safety Management
Chapter 5 – Enterprise Analysis
A Roadmap to Successful Implementation Management Plans.
A-16 Portfolio Management Implementation Plan Update
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
Pennsylvania Value-Added Assessment System (PVAAS) High Growth, High Achieving Schools: Is It Possible? Fall, 2011 PVAAS Webinar.
New Paradigms for Measuring Savings
1 Meeting carbon budgets – 5th Progress Report to Parliament Committee on Climate Change, June If you want to tweet about this report.
Capacity Planning For Products and Services
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter Eleven Cost Behavior, Operating Leverage, and CVP Analysis.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
/1 Transparency Challenge Panel March / Welcome & Introductions Suzanne Wise Strategy Consultation Overview of responses and next steps.
VOORBLAD.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
1 Training Package Re-Design and its opportunities.
Presented to: Minnesota Chamber of Commerce October 1, 2012.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
1 Tracking Innovation in NC Patterns and Implications for NC's Eastern Region John Hardin, Executive Director NC Board of Science & Technology
LCFF Funding and LCAP Shift Overview District Advisory Committee (DAC) Meeting February 27, 2014.
Internal Control and Control Risk
International Opportunities
Operations Management: Financial Dimensions
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 12 Keynesian Business Cycle Theory: Sticky Wages and Prices.
1 Phase III: Planning Action Developing Improvement Plans.
Financial Reporting changes for FReM compliant entities Fact Sheet Overview This Fact Sheet highlights the key changes in the HM Treasury.
PSSA Preparation.
Charting a Sustainable Future: Marshall University Vision 20/20 Campus Conversation October 6, 2014 Service Portfolio Review.
Chapter 14 Short-Term Financial Planning. Copyright ©2014 Pearson Education, Inc. All rights reserved.14-1 Learning Objectives 1.Use the percent of sales.
CLIENT INVESTMENT UPDATE Wholesale Products Appendix 30 September 2014.
Monterey, California September 4, 2014 Creating a Statewide Workforce Program Leveraging a National Initiative.
© 2007 BST. All rights reserved. Confidential Information. SLU – 1 PDS_139 (0503) L2 Applying Problem- Solving Tools.
Comprehensive User Fee Study
1 Volume measures and Rebasing of National Accounts Training Workshop on System of National Accounts for ECO Member Countries October 2012, Tehran,
©2011 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY.
CSEM Policy Conference Panel Discussion Utility Incentives and the Strategic Plan December 9, 2008 William C. Miller Manager, CEE Strategic Issues Pacific.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING ©2015 Navigant Consulting, Inc. Public Workshop Presentation Existing Conditions.
©2011 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING ©2015 Navigant Consulting, Inc. July 6, California Potential and.
©2011 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
1 Energy Efficiency Programs For Local Governments & Community Partners Christina Prestella Program Manager, Government & Community Partnerships PG&E September.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Investing in the green economy: GIB’s approach to ensuring positive green impact 15 th September 2014.
©2011 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY.
©2012 Navigant Consulting, Inc. ENERGY DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING October 25, 2012 CPUC Potentials, Goals.
Agenda » General Methodology » Approaches to Key Issues
Presentation transcript:

©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING December 16, 2013 Local Government Quantified Savings Component of Strategic Plan Update Navigant Reference: Stakeholder Update #3

1 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Content of Report This presentation was prepared by Navigant Consulting, Inc. exclusively for the benefit and internal use of the California Public Utilities Commission and/or its affiliates or subsidiaries. No part of it may be circulated, quoted, or reproduced for distribution outside these organization(s) without prior written approval from Navigant Consulting, Inc. The work presented in this report represents our best efforts and judgments based on the information available at the time this report was prepared. Navigant Consulting, Inc. is not responsible for the reader’s use of, or reliance upon, the report, nor any decisions based on the report. NAVIGANT CONSULTING, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EXPRESSED OR IMPLIED. Readers of the report are advised that they assume all liabilities incurred by them, or third parties, as a result of their reliance on the report, or the data, information, findings and opinions contained in the report. December 16, 2013 ©2013 Navigant Consulting, Inc. All rights reserved. Navigant Consulting is not a certified public accounting firm and does not provide audit, attest, or public accounting services. See for a complete listing of private investigator licenses. Investment banking, private placement, merger, acquisition and divestiture services offered through Navigant Capital Advisors, LLC., Member FINRA/SIPC.

2 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY 1:30Introductions and Meeting Goals 1:40Synopsis of Previous Meetings 1:50Revisit Goal #3 Metrics 2:20Wording for Metrics for Goals #1 and #4 Agenda 2:40Next Steps

3 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY 1:30Introductions and Meeting Goals 1:40Synopsis of Previous Meetings 1:50Revisit Goal #3 Metrics 2:20Wording for Metrics for Goals #1 and #4 Agenda 2:40Next Steps

4 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Introductions and Meeting Goals » Meeting Goals We will address each of these goals during the course of today’s meeting. Gain alignment on metrics for Goals #1, #3, and #4 Outcomes for Today’s Meeting Feel free to raise questions and comments as we go through the presentation. Review fit of the metrics effort with LG SP update Review the key points made during previous meetings Discuss revised approach and results for metrics for Goal #3 Review wording for metrics for Goals #1 and #4 Goals for Today’s Meeting

5 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY 1:30Introductions and Meeting Goals 1:40Synopsis of Previous Meetings 1:50Revisit Goal #3 Metrics 2:20Wording for Metrics for Goals #1 and #4 Agenda 2:40Next Steps

6 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Synopsis of Previous Meeting The first two stakeholder meetings included attendance (by phone and in person) by a wide range of participants. The manner in which the metrics discussion is framed is important. Be clear that the metrics won’t quantify all of the activities of the LGs. Savings from LG buildings are only part of the equation. Real opportunity resides with the constituents’ buildings. Savings that LGs can achieve may be different than those for which IOUs can claim credit. LGs are interested in representing the full range of savings, not just those for which IOUs can claim credit. Reach codes are still on the table in some jurisdictions. Enhancing compliance and enhancing enforcement require different mechanisms and have different effects. Key Points Made by Stakeholders during Meetings #1 and #2 Stakeholder input has shaped our approach to presenting and framing the metrics component of the LG Strategic Plan chapter.

7 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Synopsis of Previous Meeting The project team would like to refresh several points of context discussed during the first two stakeholder meetings. Developing metrics helps create legitimacy for the Strategic Plan and efforts of local governments. The metrics developed during this effort are not anticipated to serve as goals for the LGP programs. This effort leverages an existing, vetted tool to develop the quantifiable metrics. – The tool (the Potential, Goals, and Targets Model) can create metrics for some but not all components of the goals. – For those metrics that are developed, the results are intended to indicate scale and represent trends, not to provide precise calculations of savings potential. – Future studies or pilots may help quantify specific elements of the goals, and the forthcoming action plan can capture those priorities for planning purposes. Relevant Context Discussed by the Project Team

8 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY 1:30Introductions and Meeting Goals 1:40Synopsis of Previous Meetings 1:50Revisit Goal #3 Metrics 2:20Wording for Metrics for Goals #1 and #4 Agenda 2:40Next Steps

9 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Code- Related Issues Type of Construction (Vintage) Sector Opportunities for LG Energy Efficiency ResidentialExisting Buildings Compliance with Code when Triggered Improving Efficiency in Existing Buildings New ConstructionCode ComplianceReach Codes Non-Residential (Including LG and Constituents) Existing Buildings Compliance with Code when Triggered Improving Efficiency in Existing Buildings New ConstructionCode ComplianceReach Codes Revisit Goal #3 Metrics The proposed metrics for Goal #3 quantify two types of effects that could be achieved by leveraging LG regulatory authority. Dimensions of the LG Energy Savings Opportunity The proposed metrics capture the effects of enhanced code compliance (blue) and improved efficiency in existing buildings (green).

10 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Revisit Goal #3 Metrics The project team developed two metrics for Goal #3 based on the discussion during the first stakeholder meeting. Metric #1Metric #2 GoalGoal #3: Local governments accelerate the implementation of energy efficiency, zero net energy and greenhouse gas reduction goals through the use of their regulatory authority. MetricEnergy savings from an increase of 10 percentage points in compliance with existing codes for new construction. Energy savings from bringing the existing building stock up to code from its current state. Relevant StrategyStrategy 3-2: Dramatically improve compliance with and enforcement of Title 24, including HVAC permitting and inspection requirements (including peak-load reduction solutions in inland areas). Strategy 3-3: Develop, adopt and implement model policies and programs focusing on improving the energy efficiency of existing buildings. NotesRequires collection of baseline compliance data for 2013 Title 24. Requires more comprehensive understanding of current energy performance of existing building stock, perhaps by LG jurisdiction Modeling ApproachAssume baseline code compliance rate increases by 10 percentage points Increase baseline energy consumption (against which savings are calculated) by 25%

11 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Revisit Goal #3 Metrics We are lacking current data to provide precise estimates of the potential energy savings from updating existing buildings to current code. The revised approach includes a range of potential savings for the to-code compliance metric: – High end: Based on anecdotal input from LGs, increased the baseline energy consumption by 25% – Low end: Based on an assessment of additional savings from HVAC to-code compliance Actual savings potential may be more than the high end of this range or lower than the low end of this range. This metric could significantly benefit from more comprehensive data, some of which may become available through the upcoming CSS or CLASS studies. Update on Approach to the To-Code Compliance Metric

12 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Revisit Goal #3 Metrics » Analysis of To-Code Compliance (Existing Buildings) Increasing overall baseline energy consumption by 25% yields improved savings. HVAC-to-Code compliance alone also yields significant savings. SectorFuel Type Increase in Incremental Savings in 2020 Increase in Baseline Energy Performance by 25%* HVAC-to-Code Compliance Program Residential Electric26%3% Gas20%12% Commercial Electric26%7% Gas-2%26% * The increase in baseline energy performance is being used as a proxy for a high-end range for energy savings that may be realized from a to-code compliance program. Positive savings are indicative of to-code-compliance improvements. Negative savings are indicative of to-code-compliance increased interactive effects. Source: Navigant analysis of PG Model release on 5/22/2013.

13 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Revisit Goal #3 Metrics » Analysis of To-Code Compliance (Existing Buildings) Measure-level analysis of HVAC-to-Code Compliance savings yields substantial savings for existing buildings that are below code. Sector Fuel Type HVAC-to-Code Compliance Savings* MinMaxAverage Residential Electric46%154%95% Gas-50%-3%-26% Commercial Electric1%972%180% Gas0% *Positive savings indicates Base-to-Measure UES > Code-to-Measure UES. This is indicative of a mixed market baseline lower than code. Negative savings indicates Code-to-Measure UES > Base-to-Measure UES. This is indicative of a mixed market baseline higher than code. Source: Navigant analysis of PG Model release on 5/22/2013. The values reported in this table represent average UES between DEER and IOU workpaper measures for which there is a reported difference between base and code impacts. There are a number of measures from these datasets where the UES impact of base was reported as equal to the UES impact of code. This would indicate that base is equal to code. Additional savings from a lower mixed market baseline than code may be possible if conclusive evidence supporting the overall disposition of market baseline equipment is provided.

14 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Revisit Goal #3 Metrics » Analysis of To-Code Compliance (Existing Buildings) Aggregate IOU Annual Incremental Market Potential (Residential Sector) 2014 – 2024 (GWh) Source: Navigant analysis of PG Model release on 5/22/2013.

15 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Revisit Goal #3 Metrics » Analysis of To-Code Compliance (Existing Buildings) Aggregate IOU Annual Incremental Market Potential (Residential Sector) 2014 – 2024 (MM Therms) Source: Navigant analysis of PG Model release on 5/22/2013. Note: Negative values due to interactive effects.

16 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Revisit Goal #3 Metrics » Analysis of To-Code Compliance (Existing Buildings) Aggregate IOU Annual Incremental Market Potential (Commercial Sector) 2014 – 2024 (GWh) Source: Navigant analysis of PG Model release on 5/22/2013.

17 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Revisit Goal #3 Metrics » Analysis of To-Code Compliance (Existing Buildings) Aggregate IOU Annual Incremental Market Potential (Commercial Sector) 2014 – 2024 (MM Therms) Source: Navigant analysis of PG Model release on 5/22/2013. Note: Negative values due to interactive effects.

18 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Revisit Goal #3 Metrics » Analysis of Enhanced Code Compliance (New Construction) Increasing new buildings’ compliance with code by 10 percentage points yields marginal additional electric savings. Aggregate IOU Annual Incremental Market Potential (Residential and Commercial) 2014 – 2024 (GWh) Source: Navigant analysis of PG Model release on 5/22/2013.

19 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Revisit Goal #3 Metrics » Analysis of Enhanced Code Compliance (New Construction) Increasing new buildings’ compliance with code by 10 percentage points yields marginal additional electric savings. Savings from C&S in IOU Service Territories (Residential and Commercial) (GWh) Source: Navigant analysis of PG Model release on 5/22/2013.

20 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Revisit Goal #3 Metrics » Analysis of Enhanced Code Compliance (New Construction) Increasing new buildings’ compliance with code by 10 percentage points yields marginal additional gas savings. Aggregate IOU Annual Incremental Market Potential (Residential and Commercial) 2014 – 2024 (MM Therms) Source: Navigant analysis of PG Model release on 5/22/2013.

21 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Revisit Goal #3 Metrics » Analysis of Enhanced Code Compliance (New Construction) Increasing new buildings’ compliance with code by 10 percentage points yields marginal additional gas savings. Savings from C&S in IOU Service Territories (Residential and Commercial) (MM Therms) Source: Navigant analysis of PG Model release on 5/22/2013.

22 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY 1:30Introductions and Meeting Goals 1:40Synopsis of Previous Meetings 1:50Revisit Goal #3 Metrics 2:20Wording for Metrics for Goals #1 and #4 Agenda 2:40Next Steps

23 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Framing for Quantitative Metrics for Goals #1 and #4 As previously discussed, the metrics assigned to Goals #1 and #4 represent savings that can be achieved within LG facilities. These metrics capture only one component of each of the goals. GoalDefinition of the Metric Goal #1: Local governments lead by example by designing and implementing programs that reduce their agencies’ energy use and greenhouse gas (GHG) emissions. Achieve 34 GWh and 0.5 MM Therms of energy savings from implementation of standard efficiency measures/ (i.e., measures eligible for IOU rebates) captured in facilities owned and/or occupied by LGs. Goal #4: Local government and community energy efficiency expertise becomes widespread and prevalent. Achieve 8 GWh and 0.1 MM Therms of energy savings from implementation of enhanced energy management practices captured in facilities owned and/or occupied by LGs.

24 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY 1:30Introductions and Meeting Goals 1:40Synopsis of Previous Meetings 1:50Revisit Goal #3 Metrics 2:20Wording for Metrics for Goals #1 and #4 Agenda 2:40Next Steps

25 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Next Steps This is our last planned stakeholder meeting of the three-phase stakeholder engagement process for these metrics. Meeting Date and Time AgendaLocation 21-Nov 2:00 p.m. – 4:30p.m. Describe methodology for estimating baselines and potential; Share preliminary results. Webex and Pacific Energy Center (San Francisco) 5-Dec 1:30 p.m. – 3:00 p.m. Comments on preliminary results of Goals 1 and 2; Preliminary results of Goal 3. Webex only 16-Dec 1:30 p.m. – 3:00 p.m. Share draft-final results; Solicit additional comments. Webex and SCG site in Downey Planned Engagement Timeline

Key C O N T A C T S ©2011 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. Key C O N T A C T S ©2011 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. Key C O N T A C T S ©2011 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. Key C O N T A C T S ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. 26 ENERGY Floyd Keneipp Managing Director Walnut Creek, CA (925) Jane Pater Salmon Director Boulder, CO (303) Eric Shum Senior Consultant Walnut Creek, CA (925) Floyd Keneipp Managing Director Walnut Creek, CA (925) Jane Pater Salmon Director Boulder, CO (303) Eric Shum Senior Consultant Walnut Creek, CA (925)

27 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Framing for Quantitative Metrics for Goals #1 and #4 The metrics presented during the last meeting for Goals #1 and #2 will be separated and assigned to Goals #1 and #4. These metrics capture only one component of each of the goals. GoalDefinition of the Metric Goal #1: Local governments lead by example by designing and implementing programs that reduce their agencies’ energy use and greenhouse gas (GHG) emissions. Energy savings captured in facilities occupied by LGs from implementation of standard efficiency measures/ (i.e., measures eligible for IOU rebates) Goal #4: Local government and community energy efficiency expertise becomes widespread and prevalent. Energy savings captured in facilities occupied by LGs from implementation of enhanced energy management practices.

28 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Commercial Results: Aggregate IOU» Commercial Sector › Electric Aggregate IOU Annual Incremental LG Market Potential 2014 – 2024 (GWh) 2013 Preliminary LG Results - Do Not Cite Source: Navigant analysis of PG Model release on 5/22/

29 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Commercial Results: Aggregate IOU» Commercial Sector › Electric Aggregate IOU Cumulative LG Market Potential 2014 – 2024 (GWh) 2013 Preliminary LG Results - Do Not Cite Source: Navigant analysis of PG Model release on 5/22/

30 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Commercial Results: Aggregate IOU» Commercial Sector › Gas Aggregate IOU Annual Incremental LG Market Potential 2014 – 2024 (MM Therms) 2013 Preliminary LG Results - Do Not Cite Source: Navigant analysis of PG Model release on 5/22/

31 ©2013 Navigant Consulting, Inc. Confidential and proprietary. Do not distribute or copy. ENERGY Commercial Results: Aggregate IOU» Commercial Sector › Gas Aggregate IOU Cumulative LG Market Potential 2014 – 2024 (MM Therms) 2013 Preliminary LG Results - Do Not Cite Source: Navigant analysis of PG Model release on 5/22/