UtilityAMI HAN Task Force July 11, 2007. Agenda Introductions Review of project timeline and milestones Review of recently approved guiding principles.

Slides:



Advertisements
Similar presentations
Westar Energy Smart Grid
Advertisements

Presented by Nikita Shah 5th IT ( )
Enabling Customer Demand Management Kevin Evans President & CEO June 24, 2010.
June Intelligently Connecting Plug-In Vehicles & the Grid.
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
NAESB Smart Grid Task Force PAP 03 Update Robert B. Burke – NAESB Task Force Co-Chair Jim Northey.
What we do Larotecs Web2M is an off-the shelf, end-to-end, web-based solution designed to manage multiple widely distributed devices.
Chapter 20 Oracle Secure Backup.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 8: Monitoring the Network Connecting Networks.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
0 © 2011 Silver Spring Networks. All rights reserved. Building the Smart Grid.
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Microgrid – A Smart Grid Alternative Service Delivery Model? Thomas.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
OpenHAN Boot Camp July 19, OpenHAN TF Overview Chair Erich W. Gunther, EnerNex – Co-chair Mary Zientara, Reliant Energy -
1 WebTrust for Certification Authorities (CAs) Overview October 2011 WebTrust for Certification Authorities (CAs) Overview October 2011 Presentation based.
Security Controls – What Works
Chapter 19: Network Management Business Data Communications, 4e.
Advanced Metering Infrastructure AMI Security Roadmap April 13, 2007.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
3 rd SG13 Regional Workshop for Africa on “ITU-T Standardization Challenges for Developing Countries Working for a Connected Africa” (Livingstone, Zambia,
Advanced Metering Infrastructure
Presented by INTRUSION DETECTION SYSYTEM. CONTENT Basically this presentation contains, What is TripWire? How does TripWire work? Where is TripWire used?
Smart Metering in ERCOT: Implementation Update CCET Board of Directors Meeting August 3, 2011 Presented by Christine Wright, Competitive Markets Division.
1 Connectivity Week 2010 How Can Standards Be Regulated? Thursday May 27 10:30AM-Noon Zahra Makoui.
IOT5_ GISFI # 05, June 20 – 22, 2011, Hyderabad, India 1 Privacy Requirements of User Data in Smart Grids Jaydip Sen Tata Consultancy Services Ltd.
Texas Smart Grid Consortium November 8 th Transition Probability Chaos Theory attractors Signal to Noise ratio MultiColinearity Remove the Complexity.
Security Baseline. Definition A preliminary assessment of a newly implemented system Serves as a starting point to measure changes in configurations and.
Summary Device protocols tied intimately to applications. A need to significantly reduce critical data update times. Current network bandwidth consumption.
McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.
Meter, Facility Interfaces
3 rd Party Registration & Account Management SMT Update To AMWG January 20, 2015.
Advanced Metering Implementation Team (AMIT) Update to RMS Presented by Christine Wright August 17, 2011
JEMMA: an open platform for a connected Smart Grid Gateway GRUPPO TELECOM ITALIA MAS2TERING Smart Grid Workshop Brussels, September Strategy &
Advanced Controls and Sensors David G. Hansen. Advanced Controls and Sensors Planning Process.
Aug UtilityAMI OpenHAN TF HAN Guiding Principles, Use Cases, System Criteria Requirements Preparation Materials 15 August 2007.
UtilityAMI HAN Task Force July 2, Agenda Introductions / Background Overview of HAN Framework - 20 minutes California IOU Presentation/Discussion.
CEC 08-DR-1 Efficiency Committee Workshop 3/3/08.
Dec UtilityAMI OpenHAN TF Requirements Working Group Specification Briefing January 2008.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
June California Investor Owned Utilities (IOU) HAN Guiding Principles Functional Characteristics and System Criteria 2 July 2007.
INTRUSION DETECTION SYSYTEM. CONTENT Basically this presentation contains, What is TripWire? How does TripWire work? Where is TripWire used? Tripwire.
3 rd Party Registration & Account Management SMT Update To AMWG August 26, 2014.
OpenHAN TF Meeting Where do we go next? Erich W. Gunther.
Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Jerry Melcher Onsite facilitator for this meeting.
UtilityAMI HAN Task Force Erich W. Gunther – Chairman Jan 25, 2008 – Tampa, FL.
OpenHAN SRS v1.95 Overview June 8, OpenHAN SRS v Introduction  OpenHAN area of focus within the NIST conceptual model.
June California Investor Owned Utilities (IOU) HAN vision statement development 15 June 2007.
12/10/2016 Smart Grid Requirements for IEEE M2M Network IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16ppc-10/0042.
ELECTRONIC SERVICES & TOOLS Strategic Plan
MARS Taskforce COPS Update August 10, Definitions AMC – AMS (IDR) meter type settled using the 15-Minute LSE data received from TDSP AMDG – 15 Minute.
Consumers Energy Advanced Metering Infrastructure Review and Feedback Utility AMI / Open HAN Meeting August 15, 2007.
Demand Response Analysis and Control System (DRACS)
Metering Americas April 24, 2006 Advanced Metering.
ELECTRICITIES – INTRO TO AMI Brad Kusant – Area Manager 8/19/2014.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
Transmission-Distribution Interface Working Group Meeting
Chapter 19: Network Management
[WP1] T1.2 User and Business Requirements

Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid Overview] Date Submitted: [13.
AMI Security Roadmap April 13, 2007.
California Investor Owned Utilities (IOU)
California Investor Owned Utilities (IOU)
Presentation transcript:

UtilityAMI HAN Task Force July 11, 2007

Agenda Introductions Review of project timeline and milestones Review of recently approved guiding principles HAN Functional Characteristics and System Criteria (HFCSC) discussion Vote to approve HFCSC Comments on use cases and normalization process Logistics for July 31 Meeting Adjourn

Introductions and TF Operating Rules OpenHAN is a TF of the UtilityAMI WG and operates under the same governing rules This is a utility driven activity Members in good standing of the UCA International Users Group which represent a utility are eligible to vote Utility members are permitted to put any issue on the table for discussion or vote Any member may contribute / comment A majority of utility members may vote to table any issue

Project Timeline Today – discuss and vote on HFCSC July 13 – all to submit new, updated use cases July 16 – team lead by CA IOU’s begins normalization process August 1 – Normalized use cases available for review August 13 – Draft of “Platform Independent Requirements and Architecture” document August 15 – Physical meeting in Jackson Michigan hosted by Consumers Energy – review “Platform Independent Requirements and Architecture” document August 20 – Smart Metering West Coast – HAN Workshop August 24 – final draft document(s) available for vote August 31 – publish our document(s) and issue press release

HAN Guiding Principles Value Proposition Guiding Principles Functional Characteristics & Criteria Platform Independent Requirements Platform Requirements (Technology Specific)

HAN Guiding Principles 1. Supports a secure 2-way communication between the AMI Network and the HAN 2. Supports load control integration (e.g., distributed resource dispatch / control / relaying) 3. Provides direct access to usage and other meter data (e.g., kWHr, KW, Voltage, etc.) 4. Provides a platform for future customer owned products which leverage meter data and utility/grid information 5. Supports three types of communications: public price signaling, consumer specific signaling and control signaling 6. Supports communications to other HAN Devices with metering capability (e.g., gas and/or water meter communication, EV sub- metering, PV sub-metering, etc.) 7. AMI Network interface to HAN interface is based on open standards 8. Implementation is appropriate given the high value and relative low cost 9. Potential technology obsolescence is low due to multiple bridging options

HAN Functional Characteristics Value Proposition Guiding Principles Functional Characteristics & Criteria Platform Independent Requirements Platform Requirements (Technology Specific)

HAN Functional Characteristics and System Criteria

HAN Application Characteristics Control - Applications that respond to control commands  Direct - Turns load On or Off  Cycling - Turns load On or Off at configurable time intervals  Limiting - Turns load On or Off based on configurable thresholds Measurement & Monitoring - Applications that provide internal data & status  Distributed generation (DG) - Local energy input/output (kWh, kW, other energy values)  Sub-metering - Device specific, end-use energy consumption or production (e.g. Consumer PHEV)  Environmental State - Current local conditions (e.g., temperature, humidity, time, airflow, ambient light level, motion)  Device State - The current or historical state of the device (e.g., lights/fans/compressor/motor/heater are on/off) Processing - Applications that consume, process and act on external and internal data. These applications accept data from external systems and HAN measurement & monitoring applications. In general, these applications that have a higher level of complexity and cost.  Energy Cost - Calculates current and overall energy cost  Energy Consumption - Calculates current and overall energy consumption  Energy Production - Calculates current and overall energy Production  Energy Optimization - Utilizes external and HAN data to determine desired response based on a consumer configurable profile  Energy Demand Reduction - Uses external and HAN data to reduce load based on a consumer configurable profile  Environmental Impact - Calculates environmental impact of current energy consumption (e.g. Power Generation Plant CO2 emissions related to consumer specific load) Human Machine Interface (HMI) - Applications that provide local user input and/or output. These applications are based constrained and based on the data type  User Input - Provides consumers with a means to input data into an Application (e.g., Touch screen, Keypad)  User Output - Provides an Application with a means to output data to the consumer (e.g., In-Home Display, text message)

HAN Communications Discovery - The identification of new nodes within the HAN  Announcement – both active and passive device notification methods  Response - Includes both endpoints (e.g., announcing entity and recipient entity)  Initial Identification - Device-type and address identification Commissioning - The network process of adding or removing a node on the HAN with the expectation that the system is self-organizing (i.e., initial communication path configuration). This process is decoupled from utility registration.  Identification - Uniquely identifying the device  Authentication - Validation of the device (e.g., the network key)  Configuration - Establishing device parameters (e.g., network ID, initial path, bindings) Control  Autonomous functions enabled by the platform specific technology  Organization - Communication paths (e.g., route)  Optimization - Path selection  Prioritization - Communication based on importance (e.g., queuing, scheduling, traffic shaping)  Mitigation - Ability to adapt in response to interference or range constraints through detection and analysis of environmental conditions

HAN Security Access Controls and Confidentiality – protection methods associated with both data-at-rest and data-in-transit based on data type  Public Controls (low robustness) - protection methods for publicly available information (e.g., energy price)  Private Controls (medium robustness) - protection methods for confidential or sensitive data (e.g., consumer usage)  Utility Controls (high robustness) - protection methods for utility accountable data (e.g., load control, sub- metering data) Registration and Authentication – Verifying and validated HAN participation  Initialization – establishes the application/device as a validated node (i.e., logical join to the utility’s network)  Validation – validates the application’s data (i.e., request or response)  Correlation – correlating an account (e.g., consumer) with a device, application or program (e.g., DR programs, peak time rebate, etc.)  Authorization – rights granted to the applications  Revocation – removing an established node, correlation or authorization Integrity – Preserves the HAN operating environment  Resistance – methods which prevent changes to the application or application’s data (e.g., tamper and compromise resistance)  Recovery – restores an application or the application’s data to a previous or desired state (e.g., reloading an application, resending corrupted communications) Accountability – monitoring malicious activities  Audit – application log detected compromise attempts  Non-repudiation – applications and application operators are responsible for actions (e.g., can not deny receipt or response)

HAN Performance Availability - The applications are consistently reachable Reliability - The applications are designed and manufactured to be durable and resilient Maintainability - The applications are designed to be easily diagnosed and managed Scalability - The system supports a reasonable amount of growth in applications and devices Upgradeability - The applications have a reasonable amount of remote upgradeability (e.g., patches, updates, enhancements) Quality - The applications will perform as advertised

HAN Operations, Maintenance and Logistics Manufacturing and Distribution - Vendor’s pre-installation activities  Pre-commissioning - Depot level configuration setting  Registration configuration - Any required utility specific configurations  Labeling - Utility compliance and standards labeling  Purchasing - Supports multiple distribution channels (e.g., retail, wholesale, utility) Installation - physical placement of the device  Documentation - Installation materials and manuals  Support Systems - Installation support systems including web support, help line, other third party systems Management and Diagnostics  Alarming and logging - Event driven consumer and utility notifications  Testing - System and device testing  Device reset - Resets the device to the installation state

Motion to Approve HFCSC Motion Discussion  How to document – convert slides to short word document – no added/changed content – can be done after vote  Publish / press release (along with guiding principles) Vote

Use Case Discussion

Next Steps Publish CA IOU Vision statement (Guiding Principles, Functional Characteristics) Develop OpenHAN comprehensive HAN use cases Develop OpenHAN platform independent requirements Develop UtilityAMI platform independent architectural views for AMI and HAN Continue to share information with technology communities (i.e., vendors, alliances)

Next Meeting Physical Meeting Tuesday, July 31, 2007 Hosted by PG&E