RSRDC UNIT- II JAIPUR.

Slides:



Advertisements
Similar presentations
Jack Jedwab Association for Canadian Studies September 27 th, 2008 Canadian Post Olympic Survey.
Advertisements

Números.
Un percorso realizzato da Mario Malizia
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
RSRDC UNIT-II JODHPUR.
Rajasthan State Road Development & Construction Corporation Ltd.
RSRDC UNIT-IV, JAIPUR. ORGANISATION CHART OF RSRDC UNIT –IV, JAIPUR R.E. Sh.S.S. Vijay ARE Sh. R.K. Vijay ARE Sh.M.K. Saini ARE Sh. Rajiv Sethi ARE Sh.
EuroCondens SGB E.
Worksheets.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
BEA Local Area Personal Income and Employment county data ( ), 04/22/2010 release. Estimates of detailed employment and wage data for the states.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
1 Changing Profile of Household Sector Credit and Deposits in Indian Banking System -Deepak Mathur November 30, 2010.
Disability status in Ethiopia in 1984, 1994 & 2007 population and housing sensus Ehete Bekele Seyoum ESA/STAT/AC.219/25.
Western Public Lands Grazing: The Real Costs Explore, enjoy and protect the planet Forest Guardians Jonathan Proctor.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
Ninth Grade Distribution All Students = 301 (100%) (less level 1 & 2 students) (less level 3 students in full transition) (less students in full.
1 1  1 =.
1  1 =.
CHAPTER 18 The Ankle and Lower Leg
2.11.
Supported by ESRC Large Grant. What difference does a decade make? Satisfaction with the NHS in Northern Ireland in 1996 and 2006.
The 5S numbers game..
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
Mental Math Math Team Skills Test 20-Question Sample.
Primary research figuresPrimary research figures These are some of the results from my primary research. percentages of people who like/dislike the show.
Network TV Scatter vs. Spot TV Cost Comparison A25-54 CPMs Q Q TVB Analysis of SQAD National and Local Market Cost Estimate Data 1 Updated.
Look at This PowerPoint for help on you times tables
Figure 3–1 Standard logic symbols for the inverter (ANSI/IEEE Std
2013 Fox Park Adopt-A-Hydrant Fund Raising & Beautification Campaign Now is your chance to take part in an effort to beautify our neighborhood by painting.
SENIOR ARCHITECT (WZ) II, NAGPUR Nos. Quarters for GPRA at Bungalow No. 17& 18 at Civil Lines, Nagpur.
Regression with Panel Data
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Progressive Aerobic Cardiovascular Endurance Run
Biology 2 Plant Kingdom Identification Test Review.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Facebook Pages 101: Your Organization’s Foothold on the Social Web A Volunteer Leader Webinar Sponsored by CACO December 1, 2010 Andrew Gossen, Senior.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
LN-251 SimINERTIAL Performance
Midterm Review Part II Midterm Review Part II 40.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
THE NATIONAL GALLERY STRUCTURE CHART As at 30 JUNE 2010.
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
Select a time to count down from the clock above
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Introduction Embedded Universal Tools and Online Features 2.
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Welcome to the Jurisdiction
RSRDC UNIT- II, AJMER.
RSRDC UNIT- III JAIPUR. ORGANISATION CHART RE Sh. A.M. Khan ARE Sh. Rajesh Gupta ARE Sh. S.K. Chejara ARE Sh. V.B. Mathur ARE Sh. Rakeev Gupta JEN Smt.
RSRDC UNIT - KOTA. ORGANISATION CHART OF RSRDC - UNIT KOTA.
ORGANISATION CHART OF RSRDC UNIT-GURGAON RE SH. SUKESH MATHUR ARE SH. UMESH KUMAR GARG ARE SH. J.M. MITTAL ARE SH. R.D. MEENA ACCOUNTANT SH. SANT LAL.
Presentation transcript:

RSRDC UNIT- II JAIPUR

ORGANISATION CHART OF RSRDC UNIT –II JAIPUR

Financial Work Load in Unit   (Rs.in Lacs) S. No. Name of Work Client Deptt. A& F Sanction Expenditure till date Balance Work ARE – I Sh. R.P. Sharma 1 New Kar Bhawan Commercial Taxes Deptt. 221.37 175.83 45.54 2 L.S.Q. at RPA (Part-II) Police Deptt. 1075.58 838.47 237.11 Total : 1296.95 1014.30 282.65 ARE – II Sh.B.M. Tilwadia Scout & Guide Building Scout & Guide 218.98 153.49 65.49 Pollution Control Board Phase-I & Phase-IV P.C.B. 277.89 206.38 71.51 3 Landscaping Pollution Control Board 48.98 0.00 545.85 359.87 185.98 ARE – III Sh.S.K.Madan WSHG Cum ICDS Centre WSHG Cum ICDS 525.00 451.17 73.83 Cont…2….

Financial Work Load in Unit   (Rs.in Lacs) S. No. Name of Work Client Deptt. A& F Sanction Expenditure till date Balance Work ARE – IV Sh.S.K. Bathija 1 U.S.Q. at RPA Police Deptt. 620.16 508.50 111.66 2 Extension work at IHM I.H.M. 360.00 56.14 303.86 3 Police Head Quarter 7093.00 18.25 7074.75 4 Barracks at Rural Police Line 17.00 16.82 0.18 5 Barracks at Civil Lines 15.00 11.28 3.72 Total : 8105.16 610.99 7494.17 ARE – V Sh.L.R. Mathur Anti Corruption Bureau Building (Phase-IV) 182.00 138.33 43.67 Maintenance of RSRDC Head Office Building RSRDC 45.00 41.94 3.06 227.00 180.27 46.73 G. Total : 10699.96 2616.60 8083.36

IMPORTANT WORKS COMPLETED DURING LAST 5 YEARS

ZONAL KAR BHAWAN JAIPUR Completion Cost – Rs. 10.40 Crs. Floor Area 1.6 lacs sqft Date of Completion: -November 2008

35 NOS. TYPE-II GAD QUARTERS, MALVIYA NAGAR JAIPUR Completion Cost – Rs. 5.17 Crs. Floor Area 0.8 lacs sqft Date of completion:- December 2008

Completion Cost – Rs. 2.25 Crs. AUDITORIUM R.P.A., JAIPUR Completion Cost – Rs. 2.25 Crs. Floor Area 11850 sqft Date of completion:- November 2006

IMPORTANT WORKS IN PROGRESS

POLICE HOUSING SCHEME JAIPUR No. of Quarters : 64 nos. U.S.Q. & 176 L.S.Q. Total Cost : Rs. 6.20 Crores & Rs. 10.73 Crores Location : R.P.A. Shastri, Jaipur Date of Start : March 2008 Stipulated Date of Completion : December 2009 Expenditure till Date : Rs. 5.09 Crores & Rs. 8.39 Crores Likely Completion date : December 2009

ANTI CORRUPTION BUREAU BUILDING, JAIPUR Total Cost : Rs. 5.49 Crores (phase I to IV) Floor Area : 47300 sqft Location : Jhalana Doongri, Jaipur. Date of Start : December 2005 Stipulated Date of Completion : March 2010 Expenditure till Date : Rs. 5.04 Crores Likely Completion date : January 2010

W.S.H.G. CUM ICDS CENTRE JAIPUR Total Cost : Rs. 5.25 Crores Floor Area : 43150 sqft Location : Jhalana Doongri, Jaipur. Date of Start : June 2006 Stipulated Date of Completion : September 2009 Expenditure till Date : Rs. 4.51 Crores Likely Completion date : January 2010 Bottlenecks if any : Delay in release of fund from client

POLICE HEAD QUARTER BUILDING JAIPUR Total Cost : Rs. 70.93Crores Location : Lal Kothi, Jaipur. Date of Start : - Stipulated Date of Completion : - Expenditure till Date : 0.18 Crores Likely Completion date : - Bottlenecks if any : Architectural Consultancy to be finalized.

EXTENSION OF I.H.M. BUILDING JAIPUR Total Cost : Rs. 3.60Crores Floor Area : 26950 sqft Location : Bani Park, Jaipur Date of Start : June 2009 Stipulated Date of Completion : August 2010 Expenditure till Date : Rs. 0.56 Crores Likely Completion date : August 2010

Mode Actual plus / Tendered PROPOSED NEW WORKS S. No. Name of Work Client Deptt. Mode Actual plus / Tendered Estimated Cost 1 Administrative Block at Police Line, Jaipur. Police Department Actual plus Rs. 1.00 Crores 2 100 Men Barracks at Jaipur. 3 Misc. works at R.P.A. Rs. 0.77 Crores

THANKS