Unit 12 Construction Surveying
Enzyme Stabilized Mud (Earthen) Construction using DBV-1
Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Subdivision Plat Submittals Subdivision Plat Submittals
BUILDER RELATIONS Jim Fortune, Manager Canadian Iranian Homebuilders Association August 19, 2010.
Renting vs. Buying Housing. Rental Terminology Landlord Owner of property –Expects rent to be paid on time and for tenant to keep the property in reasonable.
Skyscraper Construction
What is subdivision law? 30-A M.R.S.A. § If you create a subdivision, you must submit an application to the municipal reviewing authority demonstrating.
3.2.5 On-Site Land Tenure Improvement in the Philippines: The Case of Slum Upgrading Program in Quezon City, Philippines 1 UPA Package 3, Module ON-SITE.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
1 Owner submits the application to the LSC or RCA Municipal adjudication and demand for approvals Owner submits the proposal to municipality Surveyor prepares.
Owner submits the application to the regional CA Municipal aadjudication and demand for approvals Owner submits the proposal to municipality Surveyor prepares.
Standard Grade Graphic Communications
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Chapter 22. Georgia Real Estate An Introduction to the Profession Eighth Edition Chapter 22 Land-Use Control.
Site Plans.
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Careers in Construction Unit 1. Construction Industry One of the largest industries in America Divided into four major divisions –Residential Light construction.
Mrs. Aylward.  Mortgage: A conditional pledge of property to a creditor/bank/financial institution as security for repayment of a debt specifying the.
New Zealand Building Code What is it?. The New Zealand Building Code is the first schedule to the Building Regulations All building work must comply.
© OnCourse Learning Chapter 25 : Land-Use Control.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
Constructionsite Roles in Construction Ron Gatepain.
Mr. Brad Dearing 108 University High School Normal, IL (309) Architectural Design.
February 25, 2009 BCLS CPD Presentation Air Space Parcels Presentation by: Brent Taylor Peter Tolensky.
Construction Drawing Occupational Safety and Fundamentals
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 13 Civil Engineering Detail Drawings.
Principles of California Real Estate Lesson 1: The Nature of Real Property.
Chapter 22: Buying a Home.
Specification & Quantities Estimating
Construction Drawings
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Updates to Title 8. Anticipated Timeline… July - December 2013 Ideas Compiled Research and Drafting January 2014 Planning Commission Worksession Review.
The Home Buying Process * The most common type of housing bought is the ??? Free standing single family home.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Primary Design Considerations
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Private Sector  Buildings and structures built for ordinary people.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Primary Considerations Site Considerations The community “Planned community” or no thought? Price range? Socio-economic category? Alive or dying community?
Modern Real Estate Practice in Illinois Eighth Edition Chapter 9: Legal Descriptions ©2014 Kaplan, Inc.
BUILDING CONSTRUCTION
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
Foundation – jay Desai.
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
Construction prodecure of Building
QUANTITY AND COST ESTIMATION OF RESIDENTIAL BUILDING
How Completed Interiors Are Achieved: Designing & Building
Construction Documents
Design of a Commercial Shopping Center
Table (3.1)- the averages of the 10 models costs
Design of a Commercial Shopping Center
Architectural Drafting
Decisions and considerations of choosing or building a new home.
Commercial Construction Projects
Prepared By : Supervisor : Eng. Abdulhakeem Al- Jawhari Hareth Jepara
Modern Real Estate Practice in Illinois
Building Construction I Sofia Sebastian 1
Competency: Create site plan drawings
Advancd Measurement and Contract Administration
Presentation transcript:

Land Rights and the Slums Attorney Ranier Chu and Pastor Isidoro Rabma at the UCPP Manila, Philippines

Justice for squatters

An introduction to land ownership in the Philippines As Church planters we will be involved in land issues in the following ways; - Helping squatter communities get title for their land so they can secure tenure - Finding land on which to build a Church that is legal to ensure security of title

Title documents in the Philippines TCT - Transfer Certificate of Title OCT - Original Certificate of Title LRA – Land Registry Authority is under the Department of Justice All documents are registered with the Registrar of Deeds at the Land Registry Authority A parcel of land is called a Lot.

Re-constituted titles When land has been misused and land owners may apply for a re-constituted title to correct and anomaly new titles will only be issued after new subdivision plans have been submitted by an attorney. This process with take about one year. Never buy land without first sighting the title and checking that the buildings are correctly positioned on the Lot

Legal descriptions Lot No. ???, Certificate of Title No. ???? Subdivision Plan – shows how the land is to be sub-divided and it must be approved by the Government. Then the parcels of land involved in the subdivision are allocated a Lot No. and appear on a Certificate of Title.

Number of dwellings on a lot? On one lot there may be a number of dwellings. These are divided into dwellings A, B, C, D, etc. The Local authority building department has rules related to how many dwellings can be legally built on a lot. You must find out this information before building dwellings on the Lot.

Surveying To be sure where the boundaries of the land are you employ a surveyor to ascertain where the boundaries of the land are The Surveyor finds or calculates survey points from which to calculate the boundaries of the Lot. The survey points are usually marked in the street

Building Permit To construct buildings on the land you need to obtain a building permit

Construction Construction has two main components; - Land development Never buy land until you have seen the legitimate title to the land and made sure the person selling to you is the legitimate owner. Employ and Attorney to help you in this process - Building Never build a building without a building permit

Land Ownership –acquired, rights (temporary with authorization or without) Development –earthmoving, roads, curbs and gutter, drainage, water line, sewer line, light, telephone, gas pipeline etc. Cost estimate in 2005 ranges from P1,000 to P10,000 per square meter

Building Cost estimates should be between P15,000 to P30,000 per square meter. Plans, designs, structural strength calculations and specifications will be needed to be submitted with the building permit application Estimate the total amount to build making a list of all materials and costs involved in the project Funds. Ensure that all funds are accounted for and sufficient to pay for the whole project

Implementation of the construction Start only after you have got the building permit Make arrangements for temporary facilities for the Church to meet in while the construction is underway Actual construction involves civil works-layout, excavation, soil testing for strength, foundation laying, rebars, form works for the steel in the foundation tied into the walls, columns, beams, concrete pouring, slabs, plumbing, masonry, electrical, waterline, fire hydrant, extinguishers, stairs, ceiling, partitions, tile works, roofing, water tanks, water proofing etc. Finishing works – floor finishes, wall finishes, lattice works and interior designs, painting and varnishing, lighting, and curtains etc