1 GTE Winter Outlook 2007 Brussels, January 8 th 2008 Paolo Mosa GTE Vice-President Chairman of the GTE Transparency WG.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Chapter 12 Keynesian Business Cycle Theory: Sticky Wages and Prices.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 16 Unemployment: Search and Efficiency Wages.
Copyright © 2002 Pearson Education, Inc. Slide 1.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 13 International Trade in Goods and Assets.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 14 Money in the Open Economy.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
and 6.855J Cycle Canceling Algorithm. 2 A minimum cost flow problem , $4 20, $1 20, $2 25, $2 25, $5 20, $6 30, $
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Multiplication Facts Review. 6 x 4 = 24 5 x 5 = 25.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Photo Composition Study Guide Label each photo with the category that applies to that image.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
ABC Technology Project
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
2 |SharePoint Saturday New York City
BEEF & VEAL MARKET SITUATION "Single CMO" Management Committee 18 April 2013.
VOORBLAD.
South Region LNG market changes and cross border flows SGRI – 15th November 2013.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
GTE+ Winter Outlook 2008/2009 Final Version,
European Winter Outlooks 2008/2009 and 2009/2010
Presentation transcript:

1 GTE Winter Outlook 2007 Brussels, January 8 th 2008 Paolo Mosa GTE Vice-President Chairman of the GTE Transparency WG

2 Background Updated results Additional findings Table of contents

3 Background GTE WO presented to GCG on 25 th October for the first time The study showed the existence of a capacity/demand balance at EU level: normal cold conditions exceptional cold conditions GTE invited to develop further analysis: considering the depletion of national productions identifying possible internal bottlenecks

4 Background Updated results Additional findings Table of contents

5 Data improvements Higher number of participating countries  passing from 19 to 21 countries National production figures reviewed to consider depletion of fields  previous year flows in substitution of max tech capacity Some figures updated by 5 countries on the basis of refined assumptions

6 Involved Countries EU members – data EU members – no data Non EU members

7 Updated European Balance EU ''CAPACITY - DEMAND BALANCE'' (GWh/d) TOTAL CAPACITY INTERCONNECTED WITH IMPORT & LNG TOTAL NATIONAL PRODUCTION9.255 TOTAL STORAGE TOTAL MARKET (NORMAL CONDITIONS) TOTAL MARKET (EXCEPTIONAL CONDITIONS)32.803

8 Background Updated results Additional findings Table of contents

9 Single country balances  normal cold conditions  exceptional cold conditions Integrated EU flow patterns  normal cold conditions  exceptional cold conditions Additional findings

10 Single country balance Import capacity at entry points National production past flows* + Storage send out capacity** + + Exit capacity to other countries Market demand forecast - - Single Country balance = in normal condition in exceptional condition in normal condition in exceptional condition * to take into account the depletion of production fields ** considering the decrease of performances during the winter

11 Normal Conditions – Single country balances Balance ≥ 5% 0% < Balance < 5% Balance ≤ 0%

12 Normal conditions vs. Exceptional conditions 10% < (E/N) < 30% No difference (E/N) ≤ 10% (E/N) ≥ 30%

13 Exceptional Conditions – Single country balances - 5% < Balance < 0% Balance ≤ -5% Balance ≥ 0%

14 Single country balances vs Integrated EU flow patterns 3 critical single country balances experienced in normal conditions ?

15 Integrated EU flow patterns Identification of at least one pattern of flows between EU countries that respects the following conditions Flows from non EU countries ≤ Entry point capacities Flows between countries ≤ IPs capacities Flows from storages ≤ send out capacity* Flows from national productions ≤ past winter flows Flows in exit from each country = national intakes – mkt demand * taking into account the decrease of performances during the winter

16 Integrated EU flow pattern – Normal condition Entry/Exit flows from/to non EU countries Entry/Exit flows between EU countries NP: ST: Flows from National Production Flows from Storage FIGURE LEGEND * IPs capacities are aggregated values (lesser of rule applies) % Utilization ratio of the infrastructure Utilization ratio < max reference value Utilization ratio = max reference value

17 Integrated EU flow pattern – Exceptional condition Entry/Exit flows from/to non EU countries Entry/Exit flows between EU countries NP: ST: Flows from National Production Flows from Storage FIGURE LEGEND * IPs capacities are aggregated values (lesser of rule applies) % Utilization ratio of the infrastructure Utilization ratio < max reference value Utilization ratio = max reference value

18 Key findings 3 critical single country balances in normal cold conditions Out of balance at national level solved considering flow patterns resulting from EU network integration Flexibility already existing inside countries and in IPs both in normal and exceptional cold conditions Future investments to follow increase in market demand and to improve flexibility at IPs