Institute for Transportation and Logistics, TUHH TransBaltic Kick-Off, Sep 2009 in Malmö WP 5.2 Empty Container Management Facing the ‚empty container.

Slides:



Advertisements
Similar presentations
RAPIDE – Assessment of Action Plans Brigitte Hatvan KWI Consultants GmbH EUROPEAN UNION European Regional Development Fund.
Advertisements

Seite 1 Introduction to TRANSfer: A new GIZ Project on Transport NAMAs Towards climate-friendly transport technologies and activities Dr.-Ing.
WP7 Internal Evaluation & Quality Assurance Green Employability Project StudioCentroVeneto - Toni Brunello and Paolo Zaramella Vienna, 10th January 2012.
By Susan Toben Ministry for Labour, Building and Regional Development M-V Germany Lead Partner ICZM Strategy Development Process The PlanCoast Input from.
1 Report on the Implementation of the EUSBSR Anders Lindholm European Commission Directorate General for Regional Policy.
1 EU Strategy for the Baltic Sea Region Visby Transport Workshop, 12 June 2009 Priority Area 11To Improve Internal and External Transport Links Main Actions.
1 EU Strategy for the Baltic Sea Region Anders Lindholm European Commission DG Regional Policy, Territorial Cooperation.
2/22/2014 E U R O P E A N F O R E S T I N S T I T U T E The general objectives of NEFIS are maximising the value of existing data and databases by: coordinating.
1 NECOBELAC Project WORK PACKAGE 3 Cross-national advocacy infrastructure.
Ministry of Electricity and Energy General Authority for Rural Electricity Rural Energy Access Project OFF GRID RURAL ELECTRIFICATION Summary of The Project.
INTERNATIONAL INSTITUTE FOR GEO-INFORMATION SCIENCE AND EARTH OBSERVATION WP 11 Dissemination and stakeholders panel ITC, CMA, ULP/TUD Bos Su, Zoltán Vekerdy,
Project Part-financed by the European Union Towards an integrated transport system in the Baltic Sea Region Green Corridors Measures for environmental.
INTERMODADRIA Supporting intermodal transport solutions in the Adriatic area Kick-Off Meeting 7-8 February 2013 MARCHE REGION ROAD SYSTEM AND STATE PROPERTY.
Project part-financed by the European Union Stockholm 18 May 2010 Bengt GUSTAFSSON Region Blekinge Project part-financed by the European Union BSR Interreg.
Capacity Building In Trade And Transport Facilitation For Land Locked And Transit Developing Countries June June 2007 Development Account 4th Tranche.
1 Task Force (TF) on Inter-Modal Transport Statistics (IMTS) presentation for ETIS+ Seminar 27 May 2011, Brussels Giuliano AMERINI (Eurostat)
Ministry of Enterprise, Energy and Communications Sweden Green Corridors 2030 Jerker Sjögren South Baltic Foresight Debate St Petersburg 29 April 2010.
Towards an integrated transport system in the Baltic Sea Region Project implementation plans in the second period SC meeting, Kittilä, 6-7 May 2010 Wiktor.
Towards an integrated transport system in the Baltic Sea Region Project implementation progress SC meeting, Kittilä, 6-7 May 2010 Wiktor Szydarowski Project.
Ministry of Enterprise, Energy and Communications Sweden Getting a grip on the Green Corridors Jerker Sjögren Green Corridors Stakeholders Forum Tallinn.
RES-H Policy Background and Objectives of the Project 1. Project Meeting Freiburg, 21 October 2008 Veit Bürger
WP3: Fixing RES-H/C targets Lukas Kranzl, Andreas Müller RES-H Policy Kick-off, October 2008.
Creative City Challenge Towards Fostering Innovation in the Creative and Scientific Sectors Prof. Walter Leal and Andrew Mackenzie HAW Hamburg Dundee College.
A draft introduction to WP 5 Dr. Algirdas Šakalys.
Part-financed by the European Union (European Regional Development Fund) AGENDA 1) Coordinator’s presentation on the draft of Action plan (time-schedule)
Analysing the Green Corridor Concept – Preliminary Results Nico Herz, Jutta Wolff Hamburg University of Technology Institute for Transport Planning and.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 3: Climate resilience and low carbon strategies developed Activity Progress and Component Strategy.
Development of North Adriatic ports multimodal connections and their efficient integration into the Core Network Project: NAPA STUDIES Trans-European.
WP5.3. Deployment of ICT Toolbox Milestone 1 - Action Plan Leszek Andrzejewski Institute of Logistics and Warehousing Kick - off Meeting – Malmoe 15th.
Project Part-financed by the European Union Towards an integrated transport system in the Baltic Sea Region Project presentation July 2009 Wiktor Szydarowski.
Project Part-financed by the European Union Towards an integrated transport system in the Baltic Sea Region Project presentation at the StratMoS conference,
Towards an integrated transport system in the Baltic Sea Region Project presentation at the TransBaltic foresight debate, Stockholm, 18 May 2010 Wiktor.
Towards an integrated transport system in the Baltic Sea Region Presentation at the IX All-Russian Forum, ‘Strategic Planning in the Regions and Cities.
WP5.5. Railway solutions for the North-South and East-West flows Project Part-financed by the European Union Leszek Andrzejewski ILIM contribution WP5.5.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
PILOT PROJECTS ON FUTURE OUTCOME/RESULT INDICATORS The Interreg IVB North Sea Region Programme Case Carsten Westerholt Project Devlopment and Communications.
WP 5.5 Rail solutions N-S and E-W Market share for rail transport in Norway is fairly high domestic but very low on international transports Identify bottlenecks,
RAPIDE – Assessment of Action Plans Brigitte Hatvan KWI Consultants GmbH EUROPEAN UNION European Regional Development Fund.
Responsibilities and tasks EcoR Partener P6 - EcoR Partener CRPMPEC Canakkale, Turkiye 15th, 2011,September 16’th - IMPLEMENTATION OF A QUALITY ASSURANCE.
Project Part-financed by the European Union Towards an integrated transport system in the Baltic Sea Region Project Part-financed by the European Union.
Work Package 6 2nd Consortium meeting, Provincia di Reggio Emilia, 3rd May.2011 Blaz Jemensek, PIL Klemen Gostic, PIL.
WP6 – Dissemination Project Name: Enhancing Students Participation in Quality Assurance in Armenian HE- ESPAQ Ref TEMPUS BE-TEMPUS-SMGR.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
UBC Environment and Sustainable Development Secretariat / Eija Eloranta/Communication coordinator/New bridges kick off 4th March 2009 NEW BRIDGES – Strenghtening.
WP4: Transnational MSP Governance – dialogue and institutional building Overall aim: to engage national bodies, sectors and researchers in dialogue.
Work package WP1 Improving competences and skills of the building workforce in Lithuania related to nearly zero energy buildings Acronym of the project:
International Network of Treatment and Rehabilitation Resource Centres Prevention, Treatment and Rehabilitation Unit Global Challenges Section.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
BALTICOM- BALTIC Transport Communication and Regional Development WP12 Spatial Evaluation of Transport Chains and General Recommendations for Baltic Sea.
Seite 1 Thematic Activities WP 4 and WP 5 Working Group Meeting, Halle 18 March 2014.
StratMoS Strategic Demonstration Project for Motorways of the Sea StratMoS - An arena for cooperation.
Towards an integrated transport system in the Baltic Sea Region Presentation at the StratMoS Final Conference, Brussels, 7 September 2011 Wiktor Szydarowski.
BSR STARS - Programme for the Developement of Innovation, Clusters and SME-Networks Rima Putkienė Ministry of Economy of the Republic of Lithuania Maritime.
“ Tools for MoS-Applications ” Assessing modal shift, environmental impact and socio-economic impact Jutta Wolff Institute for Transport Planning and Logistics,
1 MARITIME TRANSPORT WORKING GROUP Maritime Policy, Ports and Short-Sea Shipping MEDA Motorways of the Sea Sub-Group 4 th Meeting Brussels, 19 December.
he transport development progress in Slovenia the EASYCONNECTING hint
“MarChain”.
Development and Energy in Africa
RETROUT furthering HELCOM actions on migratory fish species
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the Baltic Sea Region (BSR)
Baltic Sea Region Programme : New Funding Opportunities
Project Kickoff Meeting
Project Coordination Group (PCG) for the implementation of the MSFD
BALTIC SEA NETWORK - ESF
Progress of the ESS.VIP ADMIN Special focus on the ESSnet on quality of multiple sources statistics. DIME/ITDG SG, Fabrice Gras, unit B1.
WP2 Communication WP and tasks presentation
COMPARISON OF EVALUATIONS OF EMERGENCIES AND EXERCISES
Engineering Processes
WP7 – Related activities
Presentation transcript:

Institute for Transportation and Logistics, TUHH TransBaltic Kick-Off, Sep 2009 in Malmö WP 5.2 Empty Container Management Facing the ‚empty container problem‘ with foldable containers - Overview

Institute for Transportation and Logistics, TUHH TransBaltic Kick-Off, Sep 2009 in Malmö Background and challenges Share of of empty containers: 20% on sea based transport, 40% on land-based transport*  Impact on costs, environment and capacity (transport, storage) * Drewry shipping company 2006 External requirements for implementation Feasibility (when technology meets processes) Motivation of main stakeholders Investment for containers (pilot fleet) Main goal: Implement foldable containers in the BSR to reduce negative impacts of empty containers

Institute for Transportation and Logistics, TUHH TransBaltic Kick-Off, Sep 2009 in Malmö Four tasks to get there Documentation and dissemination of results MS 6 Release ‘Empty Freight Reduction Manual’ MS 8 Release of 'Procedure Handbook of Freight Reduction Implementation' MS 10 Develop ‘business concept report’ MS 11 Transfer conclusions to WP 3.4 discussion Catching people, experiences and attitude MS 1 Establish trans- national working group MS 4 Identify main stake- holders MS 5 Establish stake- holders implementation platform Identification of relevant corridors MS 2 Select transport routes MS 3 Identify relevant ports and hinterland sites for a possible demonstration case Implementation in practice MS 7 Prepare and evaluate capability pre-test MS 9 Launch demonstration cases MS 12 Attempt to install foldable container route Required Input WP3.2 Required Output WP3.4

Institute for Transportation and Logistics, TUHH TransBaltic Kick-Off, Sep 2009 in Malmö Subtasks in Phase 1 (Sep 09 – March 10) Catching people, experiences and attitude –Send out detailed work plan including milestones and timetable to project partners –Literature review on empty container management with focus on foldable containers –Making contacts with ‚foldable-container-community‘ and main stakeholders –Develop an approach to catch knowledge and experience of main stakeholders

Institute for Transportation and Logistics, TUHH TransBaltic Kick-Off, Sep 2009 in Malmö Working Group and role of partners Partner –Region Västerbotten (SE) –Västra Götaland Region (SE) –Region Sjælland (DK) –The Institute of Logistics and Warehousing, Poznan (PL) –West Pomeranian Business School (PL) –The Latvian Transport Development and Education Association (LaTDEA) (LT)  Required work mainly focus on -making contacts -contribute knowledge

Institute for Transportation and Logistics, TUHH TransBaltic Kick-Off, Sep 2009 in Malmö Thank You Hamburg, University of Technology Institute for Transport Planning and Logistics Prof. Heike Flämig, Jutta Wolff,