Date: 14-11-2013 Meeting: iMobility Forum Steering Group Meeting Speaker and organisation: Maarten Oonk, Joakim Svensson [ Automation in Road Transport.

Slides:



Advertisements
Similar presentations
Why does ERA Need to Flourish
Advertisements

© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
A brief introduction to GRIFS For the CERP meeting 9-10 June 2008 at ETSI visit for more informationwww.grifs-project.eu.
By Susan Toben Ministry for Labour, Building and Regional Development M-V Germany Lead Partner ICZM Strategy Development Process The PlanCoast Input from.
Research and Innovation Why does ERA Need to Flourish ERA - State of Play Octavi Quintana Trias Brussels, 19th April 2013.
Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
1 EU Strategy for the Baltic Sea Region Anders Lindholm European Commission DG Regional Policy, Territorial Cooperation.
Institut für Meteorologie und Klimatologie Dipl.-Met. Tahera ALI October 2003 FINAL REPORT.
Shared Technical Infrastructure Bill Willis Deputy State CIO ITAB Meeting 12/2/2005.
Date: 1 October2013 Meeting: Concertation meeting VRA Speaker and organisation: Maarten Oonk, TNO [ Roadmap Automation in Road Transport.
15 th September 2013 Enagás and TIGF Information to NRAs.
The EU in the new complex geography of economic systems: models tools and policy evaluation COST Action IS1104 Meeting Lisbon March 2013.
Lim Sei cK.  16 th September 2013 – 7 th December 2013  ACADEMIC WEEK 1 – WEEK 11  9 th December 2013 – 4 th January 2014  BRUNEI STUDENT HOLIDAY.
Weekly Attendance by Class w/e 6 th September 2013.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
1 Tax Systems Modernization Presentation for FTB Board Meeting June 27, 2007.
Sustainability Planning Pat Simmons Missouri Department of Health and Senior Services.
VRA: Support action for Vehicle and Road Automation network Maxime Flament, ERTICO – ITS Europe ITFVHA meeting, 13 Oct 2013.
VRA: Support action for Vehicle and Road Automation network 1st VRA concertation meeting 1 October st VRA concertation meeting, 1 Oct 2013.
Volvo Group Trucks Technology EU-US-JP Trilateral Automation in Road Transportation Working Group.
ITFVHA 2013: rough notes. Two Most Significant Developments of Past Year? 1.automaker announcements of commercial availability >>>>>>>>>>>>>>> 2.automakers.
Slide: 1EUM/PPS/08/VWG/ October 2008 Programme Preparation 2 nd Post-EPS User Consultation Workshop Darmstadt, 3-4 February 2009 Lorenzo Sarlo.
Sponsorship on Standardisation Main results Barteld Braaksma, Cecilia Colasanti, Piero Demetrio Falorsi, Wim Kloek, Miguel Angel Martínez Vidal, Jean-Marc.
Brief Report to GRPE on the progress made by EFV Informal Group in its 5 th meeting held in New Delhi on 25 th November 2009 Informal document No. GRPE
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
WP3.2: Discussion group on Regulations » Objectives: › clarify, report and setup a plan of actions on legal, liability, insurance and regulatory issues.
Volvo Group Trucks Technology WP3.1 Deployment paths.
Introducing the Durban Climate Change Partnership January 2012.
IIWG - 1 Intelligent Infrastructure Working Group Paul van der Kroon.
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E BOF: APNIC Member Agreement 11 th APNIC Open Policy Meeting Kuala Lumpur, 1 March.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
ISMS Implementation Workshop Adaptive Processes Consulting Pvt. Ltd.
CRSA Forum March 25 at LBSU. CRSA Forum Objectives 2002 A forum to :-  promote the value and benefits of CRSA in corporate governance and enterprise.
Software Packaging for Reuse James Marshall (INNOVIM), Code 614.5, NASA GSFC The Software Packaging for Reuse document (version 1.0), developed and recently.
Doc.: IEEE /0196r0 Submission January 2016 Rich Kennedy, Unlicensed Spectrum AdvocatesSlide 1 IEEE 802 Regulatory Changes Date: Authors:
1 st EGI CMMST VT meeting 19 February 2013 A. Laganà (UNIPG, Italy)
U.S. DOT Automated Vehicle Policy Activities ITS PCB T3 Webinar The National Transportation Systems Center U.S. Department of Transportation Office of.
WP7Joint and sustainable transport in health and care Action plan for the period July-December Dr Snežana Manić AdriHealthMob, Steering Committee.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Date: 29 May 2013 Meeting: iMobility Forum Steering Group Meeting Speaker and organisation: Maarten Oonk, Joakim Svensson [ Automation in Road Transport.
Brussels, January 16th, Overview and status of the project.
EUDAT receives funding from the European Union's Horizon 2020 programme - DG CONNECT e-Infrastructures. Contract No EUDAT – the pan.
AMICI WP1 – Management, coordination and dissemination
Archived File   The file below has been archived for historical reference purposes only. The content and links are no longer maintained and may be outdated.
Campus Master Plan.
Report by the VICH Steering Committee on issues raised by Forum members during the 1st Outreach Forum meeting Hervé Marion, DVM VICH Secretariat.
towards a European Charter on Access to Research Infrastructures
Automated and connected vehicles
Marine Strategy Framework Directive (MSFD)
Policy Framework for C-ITS Deployment in Europe
MIWP MIWP actions follow-up
AMICI WP1 – Management, coordination and dissemination
Smart Grid Technology – a Master Program
e-Invoicing – e-Ordering 20/11/2008
Marine Strategy Framework Directive (MSFD)
Next Generation Task Force
WG GES: Decision review progress
Steering Committee June 8th, 2016
Item 5.2 Standardised social variables
ENabling SafE Multi-Brand Platooning for Europe
Dissemination Working Group John Allen
Assessment of quality of standards
Green Infrastructure: Working method
ENabling SafE Multi-Brand Platooning for Europe
Item 2.2 of the agenda IT Working Group meeting 2016
Item 4.2 EUROMOD latest developments
Water Director's Meeting December 2013, Vilnius DG Environment
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
Presentation transcript:

Date: Meeting: iMobility Forum Steering Group Meeting Speaker and organisation: Maarten Oonk, Joakim Svensson [ Automation in Road Transport WG

 Progress  ITS Tokyo tri-lateral working groupl;  New version of mission statement document  Kick-off VRA (CSA FP7)  Meeting Oktober 2nd 2013  Objectives 2014  8 subgroups identified for further work  based upon international working group items + VRA + 1 additional [ Progress of the WG

[ Progress - Subgroups  Subgroups (including lead) Connectivity (V2V & V2I) - ICCS Digital infrastructure - HERE Human factors - DLR Testing - IDIADA Evaluation & benefits – CTL Deployment scenario’s – VOLVO Regulations – ERTICO Technology - DLR

[ Progress - Subgroups Definition of the topic Subtopics that should be also discussed What should be done in EU/international level? What should we collaborate on? Who are the contributing projects/activities/people? List of relevant references

From these topics we aim at integrating the following: results from activities in projects to be included in order to enrich the document; Relate the topics to the two explanatory use cases in order to detail these; Use the subgroup Evaluation & benefits for input for the milestones on the policy domains; [ Progress - Relationship with Roadmap

 Concall December 5 th with subgroupleaders on progress;  TRB meeting January Washington with tri-lateral WG;  New meeting in February and May (doodle is out); [ Next steps

[ END