Real Time Train SNCF. 1 Agenda Essentials Basic Model Applications Traffic density is getting very high in several networks and management.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Chapter 4 Decision Making
1 SWISS Safety, 30 March 2006 SVFB Welcome! Operational Safety – Technical Safety.
Constraint Satisfaction Problems
Greening Backbone Networks Shutting Off Cables in Bundled Links Will Fisher, Martin Suchara, and Jennifer Rexford Princeton University.
Operations Scheduling
Cognitive Radio Communications and Networks: Principles and Practice By A. M. Wyglinski, M. Nekovee, Y. T. Hou (Elsevier, December 2009) 1 Chapter 12 Cross-Layer.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 1 Embedded Computing.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
FDA/Industry Workshop September, 19, 2003 Johnson & Johnson Pharmaceutical Research and Development L.L.C. 1 Uses and Abuses of (Adaptive) Randomization:
U NIVERSITY OF M ASSACHUSETTS, A MHERST Department of Computer Science R3: Robust Replication Routing in Wireless Networks with Diverse Connectivity Characteristics.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
and 6.855J Cycle Canceling Algorithm. 2 A minimum cost flow problem , $4 20, $1 20, $2 25, $2 25, $5 20, $6 30, $
Tuesday, May 7 Integer Programming Formulations Handouts: Lecture Notes.
Regional Policy Common Indicators: Infrastructure Definitions and Discussion Brussels, 22 nd November
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Vehicle Routing & Job Shop Scheduling: Whats the Difference? ICAPS03, June 13, 2003 J. Christopher Beck, Patrick Prosser, & Evgeny Selensky Dept. of Computing.
Making the System Operational
VARUN GUPTA Carnegie Mellon University 1 Partly based on joint work with: Anshul Gandhi Mor Harchol-Balter Mike Kozuch (CMU) (CMU) (Intel Research)
On Sequential Experimental Design for Empirical Model-Building under Interval Error Sergei Zhilin, Altai State University, Barnaul, Russia.
Multipath Routing for Video Delivery over Bandwidth-Limited Networks S.-H. Gary Chan Jiancong Chen Department of Computer Science Hong Kong University.
Micro Focus Research 1 As far as youre aware, how does your organization plan to drive business growth over the next three years? (Respondents' first choices)
Robust Window-based Multi-node Technology- Independent Logic Minimization Jeff L.Cobb Kanupriya Gulati Sunil P. Khatri Texas Instruments, Inc. Dept. of.
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
Airline Schedule Optimization (Fleet Assignment I)
Two-Market Inter-domain Bandwidth Contracting
1 Verification of Parameterized Systems Reducing Model Checking of the Few to the One. E. Allen Emerson, Richard J. Trefler and Thomas Wahl Junaid Surve.
1 Challenge the future Subtitless On Lightweight Design of Submarine Pressure Hulls.
1 Column Generation. 2 Outline trim loss problem different formulations column generation the trim loss problem master problem and subproblem in column.
Scheduled Model Predictive Control of Wind turbines in Above Rated Wind Avishek Kumar Dr Karl Stol Department of Mechanical Engineering.
Managing Web server performance with AutoTune agents by Y. Diao, J. L. Hellerstein, S. Parekh, J. P. Bigu Jangwon Han Seongwon Park
Randomized Algorithms Randomized Algorithms CS648 1.
1-1 Constraint-based Scheduling Claude Le Pape. 1-2 Outline Introduction Scheduling constraints Non-preemptive scheduling –Temporal constraints –Resource.
Shadow Prices vs. Vickrey Prices in Multipath Routing Parthasarathy Ramanujam, Zongpeng Li and Lisa Higham University of Calgary Presented by Ajay Gopinathan.
TCP Probe: A TCP with Built-in Path Capacity Estimation Anders Persson, Cesar Marcondes, Ling-Jyh Chen, Li Lao, M. Y. Sanadidi, Mario Gerla Computer Science.
Capacity Studies on Transportation Network Presented by Rakesh Ambre ( ) Under Guidance Of Prof. Narayan Rangaraj.
Multiple dependency activity on node (AoN) networks ( lecture )
1 Comnet 2010 Communication Networks Recitation 4 Scheduling & Drop Policies.
Knowledge requirements for rolling stock maintenance TU Eindhoven – 19th of June 2007 by Bob Huisman NedTrain - Fleet Management.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Free Flight with Airborne Separation will result in an uncontrolled,
2009 Foster School of Business Cost Accounting L.DuCharme 1 Decision Making and Relevant Information Chapter 11.
Routing and Congestion Problems in General Networks Presented by Jun Zou CAS 744.
1 Modeling and Simulation: Exploring Dynamic System Behaviour Chapter9 Optimization.
Optimization 1/33 Radford, A D and Gero J S (1988). Design by Optimization in Architecture, Building, and Construction, Van Nostrand Reinhold, New York.
© 2012 National Heart Foundation of Australia. Slide 2.
Formal models of design 1/28 Radford, A D and Gero J S (1988). Design by Optimization in Architecture, Building, and Construction, Van Nostrand Reinhold,
Chapter 5 Test Review Sections 5-1 through 5-4.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 13 Supplement Roberta.
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
Introduction to Ad-hoc & Sensor Networks Security In The Name of God ISC Student Branch in KNTU 4 th Workshop Ad-hoc & Sensor Networks.
Choosing an Order for Joins
Organization Theory and Health Services Management
Mani Srivastava UCLA - EE Department Room: 6731-H Boelter Hall Tel: WWW: Copyright 2003.
Chapter 30 Induction and Inductance In this chapter we will study the following topics: -Faraday’s law of induction -Lenz’s rule -Electric field induced.
By Rasmussen College. 1. What majors or programs do you offer? 2. What is the average length of your programs? 3. What percentage of your students graduate?
1 ECE 776 Project Information-theoretic Approaches for Sensor Selection and Placement in Sensor Networks for Target Localization and Tracking Renita Machado.
13-Optimization Assoc.Prof.Dr. Ahmet Zafer Şenalp Mechanical Engineering Department Gebze Technical.
New Opportunities for Load Balancing in Network-Wide Intrusion Detection Systems Victor Heorhiadi, Michael K. Reiter, Vyas Sekar UNC Chapel Hill UNC Chapel.
L’Infra, une activité au cœur de la SNCF INFRASTRUCTURE French Highspeed on South East TGV line: 25 years of evolution Jean-Paul BALENSI Vice-president.
Overview System modelling and holistic simulation :
A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission Innovations in Automated Planning.
Hamed Pouryousef ; Pasi Lautala, Ph.D, P.E. Hamed Pouryousef ; Pasi Lautala, Ph.D, P.E. Michigan Tech. University Michigan Tech. University PhD Candidate.
Presented By Dr. Mohsen Alardhi College of Technological Studies, Kuwait April 19 th,2009.
Presentation transcript:

Real Time Train SNCF

1 Agenda Essentials Basic Model Applications Traffic density is getting very high in several networks and management areas also tend to grow. In consequence, traffic management complexity is rising and management system have to evolve. A major challenge today is to study efficient tools to help experts’ decisions in the rescheduling process of tomorrow.

2 Essentials about Real Time Rescheduling Essentials –An overview of the problem –Main challenges A Basic Model Applications

3 An overview of the problem Aim : on line recomputing railway schedule following perturbations. Method : minimizing the total accumulated delay. Nowadays, SNCF has developed 3 off line prototypes working within a train simulator (SiSyFe), This allows us to study formulations and optimization techniques.

4 Main challenges Rescheduling requirements: –Tractable - Fast calculations ( < 10 min) –Operational solution – must be immediately applied on the field –… (good enough solution) Remark: initial timetable can be used to construct a first feasible solution!

5 A brief look at a model formalizing the train rescheduling problem & the railway operations. Essentials A Basic Model –Network formalization –Variables –Constraints Applications

6 Formalizing: Railway network is a graph. nodes are stations or switches, and edges are interconnecting tracks.

7 Decisions Variables Rescheduling decisions concern: Time of departure and arrival at each node, (this is equivalent to speed variation considerations ) Sequencing of trains at nodes, Track choice. (cancellation) These decisions have to respect: operational constraints & commercial constraints.

8 Constraints (examples) The following examples of constraints are associated with each train (c) at each node (n) of the network. Headways: In order to prevent conflicts, trains must be spaced. We impose a specific separation time between departures ( D ) and/or arrivals ( A ) of the two trains (c1 & c2 with c1 before c2 ): Min_spacing  A(c1,n) - A(c2,n) && Min_spacing  D(c1,n) - D(c2,n) Running times: Note: considering a minimal and a maximal running time to reach one node from another is equivalent to imposing speed limits: Min_run  A(c,n2) - D(c,n1)  Max_run Stops duration: Due to commercial and operating factors (maintenance, for example) stopping times must be bounded: Min_stop  D(c,n) - A(c,n)  Max_stop Other specific constraints: connections between two trains, shuttles, … we must take into account track choice and sequencing (and cancellation).

9 Linear Programming Model 155,1 v.1

10 SNCF Essentials Model Applications –Software SNCF –1.Traffic fluidification, –2.Traffic control, –3.Re-routing.

11 Software system implementation 155,1 v.1 Train simulator Takes into account: Infrastructure, Signaling system, Rolling stock, Incidents, Traffic Control orders, Drivers’ behavior Initial timetable Control (positions, …) Command Incidents detection LIPARI Software System Re-scheduling tools Timetabling variations monitoring New Schedule with new : Routing, Sequencing, Timetables. Translation into commands: Sequence programming, Route programming. Implementation Sardaigne Experimental design, Statistical analysis results incidents

12 1- Traffic fluidification Aim: manage closely a railway node to prevent conflict between pairs of trains in order to ensure fluidity of the traffic. Decisions: speeds, re-sequencing. 155,1 v.1 155, 1 v. 1 Space time First speed limitation (incident) With fluidification Without fluidification gain Signaling system Second speed limitation (consequence)

13 1- Rémilly - Baudrecourt 155,1 v.1 Management of pairs of predictable conflicts. Radius = 50 km very heterogeneous traffic (from international freight to TGV)

14 1- Conclusion about traffic fluidification 155,1 v.1 Experiments showed 2 problems: –simplex method vs. robustness of solutions, –linear programming vs. acceleration modeling. Real experimentations are not scheduled due to: –lack of operational equipment (Galileo/GPS, GSM-R, …)

15 2- Traffic Control support tool Objective: re-compute precisely a new railway schedule following perturbations and help experts in traffic control decisions. Scope: minor incident management (e.g. few minutes delays in a heavy traffic area) Decisions: timetable, re-sequencing and track choice.

16 1- Tours-Bordeaux, Éole, … 155,1 v.1 Incidents: –delay at the entrance –delay during a stop (5-30 min) Tours-Bordeaux – var. – const. –Time limit < 5mn ÉOLE project (link between east & west networks in Paris) –up to 540 trains

17 2- Conclusion about traffic control tools Studies show: –The sensitivity of solutions: few variations (e.g. 3s) can lead to problems. (see traffic fluidification) – Real size of problems were treated. Perspectives: –Experimenting different models –Extending the model’s scope (fluidification/routing) –Integrating in the future control system.

18 3- Insertion of re-routed trains Scope: major incident (e.g. major line breaks down) Principle: trains are to be inserted in a new schedule considering a set of pre- defined routes. Uses a less accurate description of the network. (macroscopic) Resolution method can be tuned to this specific problem. Original Schedule Trains to be inserted Original Schedule Inserted Trains Cancelled Trains Before optimization After optimization

19 3- Lyon – Paris High Speed Line (LGV 1) 155,1 v.1 Incident: –230 km of “LGV ” is down –re-routing by Dijon. Exemple: –Time window: 16h-24h –80 trains –30 nodes –1380 nodes-trains

20 3- Conclusion about rerouting Remarks: –looks like a “capacity management tool” (i.e. a basic planning tool) –Macroscopic description leads to refine solutions in a second stage. Problems: –Today, cancellation of trains in inhomogeneous traffic is a hard bargain (regulation). –New developments concern (homogeneous) suburban traffic.

21 Global Conclusions Real Time Train SNCF: Essentials/Model/Applications. About objective function, optimality,… and robustness!

22 Criteria & robustness What should we optimize? –Sum of total delays, –Delays perceived by clients, (including connections, etc..) –An economic cost function, (delay fees) –Capacity management, –… ? Criteria may differ, but robustness is the common goal of infrastructure managers. Not (only) robustness of optimality, but most of all robustness of feasibility!

23 Robustness(es) Indeed, from an industrial point of view, robustness is a key goal: the “best” solution must be operational … i.e. robust against minor incidents. Because : –control system cannot monitor precisely all micro-events, –great inertia of machines & human factors make precise controlling difficult, –… life is not predictable ! => Now, how can we achieve this goal ?

Thank you for your attention! more on: