Wolfgang Anders, Helmholtz-Zentrum Berlin for materials and energy (HZB) ESLS-RF Meeting 5.-6.10.2011 ESRF Status of RF at HZB and SRF at BERLinPro.

Slides:



Advertisements
Similar presentations
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
Advertisements

Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
1 1  1 =.
1  1 =.
Addition Facts
BERLinPro P. Kuske. P. Kuske, ESLS08 2 BERLinPro: The German ERL Test Facility BERLinPro* (Berlin Energy Recovery Linac Prototype) Proposal for the construction.
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Institut für Angewandte Physik LINAC AG H. Podlech 1 MYRRHA Injector Design and Related R&D 2 nd Open Collaboration Meeting on Superconducting Linacs for.
Text optional: Institutsname Prof. Dr. Hans Mustermann Mitglied der Leibniz-Gemeinschaft Plans and issues of the activities of GaAs for Rossendorf.
1 Vacuum Pumping Via Titanium- Zirconium-Vanadium Thin Films Yulin Li Laboratory for Elementary-Particles Physics, Cornell University, Ithaca, NY 14853,
Peter McIntosh STFC and Cockcroft Institute CI SAC Review 1 – 2 November 2010 SRF and RF Activities.
S. N. HOM Impedance in Vacuum … 1 of 40 Sasha Novokhatski SLAC, Stanford University Machine-Detector Interface Joint Session April 22, 2005 HOM Impedance.
LINAC 4 Emittance Meter.
ESLS-RF Meeting 2004 Status of the HOM Damped Cavity Project E. Weihreter / BESSY Project funded by the EC under contract HPRI-CT for the HOM.
ESLS 04 Daresbury Laboratory
Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
Multiple dependency activity on node (AoN) networks ( lecture )
Stochastic cooling and 56 MHz SRF update for Run-14 W. Fischer 21 January 2014.
2 |SharePoint Saturday New York City
1 Titel van de presentatie Rein Boshuisen, PME Analysis and Performance of a lightweight over-actuated 450mm wafer chuck R. Boshuisen, PME
First Results from the ERL Prototype (ALICE) at Daresbury David Holder, on behalf of the ALICE team. LINAC'08 Victoria, BC.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Before Between After.
Addition 1’s to 20.
25 seconds left…...
Week 1.
Mitglied der Helmholtz-Gemeinschaft Beam Cooling at HESR in the FAIR Project 12 th September 2011 Dieter Prasuhn.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
BERLinPro The Berlin Energy Recovery Linac Project Why, How and Status
Does the short pulse mode need energy recovery? Rep. rateBeam 5GeV 100MHz 500MWAbsolutely 10MHz 50MW Maybe 1MHz 5MW 100kHz.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
BERLinPro An ERL Demonstration facility at the HELMHOLTZ ZENTRUM BERLIN.
February 2010 ALBA Synchrotron Light Source Francis Perez.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Intro to WG, part II T. Kamps, C. Hernandez-Garcia FLS 2012 Workshop – FLS 2012 | Intro to WG eSources | Thorsten Kamps.
ESLS-RF Trieste, September 29-30, Åke Andersson RF systems for the MAX IV rings Åke Andersson On behalf of the MAX-lab RF team.
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
O. Kugeler – TTC Meeting February 28 – March – Milano, Italy TTC-meeting Februar 28 – March – Milano, Italy O. Kugeler (based on talk given.
ALBA RF Systems Francis Perez.
Overview of CW input coupler for ERL
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Operation Status of the RF Systems and Taiwan Photon Source
Status of BESSY II and bERLinPro
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
WG3 Summary High current and CW accelerators
Joint Accelerator Research JGU & HZB
BriXS – MariX WG 8,9 LASA December 13, 2017.
Wolfgang Anders, BESSY, Berlin
SRF Gun at ELBE Work package 10, Task 7 Jochen Teichert
SRF Pb/Nb photoinjector; recent results
Operational Experience with the Cornell ERL Injector SRF Cavities
CEPC RF Power Sources System
ERL Main-Linac Cryomodule
ERL2015 WG4: RF & superconducting RF for ERL
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
V. Veshcherevich Cornell University
Status and New Developments of ALBA RF Systems
Presentation transcript:

Wolfgang Anders, Helmholtz-Zentrum Berlin for materials and energy (HZB) ESLS-RF Meeting ESRF Status of RF at HZB and SRF at BERLinPro

OUTLINE 2 BESSY II Some aging devices at BESSY II Status klystrons BESSY II BERLinPro ERL physics Project Transmitters Cavities, couplers and modules

BESSY II: WATER LEAK AT DORIS CAVITY 3 KOLUMNE 3 Water leakage of one DORIS body Now installed last spare cavity!!

NEW CAVITIES FOR BESSY II ORDERED 4 We ordered first two new HOM damped BESSY cavities + one spare for WWL). They will be delivered summer 2012 and installed spring Changed design (in parallel with ESRF) to avoid gap on dampers that made much trouble in past. First 30 cm of the HOM dampers is part of the cavity body

MELTED HOM FERRITE IN DORIS CAVITY 5 Melted HOM ferrite glas tube at Cavity 4 (Nov.2010) HOM dampers are build 1975 In machine studies about 1 year before they made 35 mA single bunch !!!! There has been a short vacuum event… BESSY II has started with 10 mA in single bunch mode user shift, later they increased to 20 mA mA seem to be to much

STRANGE WINDOW TEMPERATURES 6 Strange behavior of window temperatures at one of four cavities. Window was old type with lower cooling. Cavity window is changed now  o.k. Temperature difference of inlet/outlet of the ceramic air cooling of cavity 1-4 at the BESSY II storage ring. Grey is the beam current.

LEAKS IN WATER LOADS 7 Some of the ~15 years old water loads show water corrosion at the brazing of the ceramic New loads 125 kW 6 1/8 inch by Altronic.

BESSY II: STATUS OF KLYSTRON 8 BESSY klystrons get old: Booster : > h 40 kW YK1263 VALVO klystron Storage ring 1: ~6.000 h 75 kW TH2133 Thales klystron Storage ring 2: ~ h 75 kW TH2133 Thales klystron Storage ring 3: ~ h 75 kW K3755 E2V klystron Storage ring 4: ~ h 75 kW TH2133 Thales klystron Spare 1: ~ h 75 kW TH2133 Thales klystron Spare 2: new h 75 kW K3755 E2V klystron Spare 3: new h 75 kW K3755 E2V klystron Spare 4: ~ h 75 kW TH2133 Thales klystron water repaired Spare 5 old 40 kW YK1263 VALVO klystron Two defect TH2133 one h heater and one unknown error old Lund klystron We need more spare, but: Thales tube out of production E2V has not send an offer, several requests since more than one year CPI has a klystron same power level, but not produced last years

SOLID STATE TRANSMITTERS FOR BESSY II 9 Due to the fact, that we don´t get any spare tubes, we will change to solid state transmitters at BESSY II in the next years. First money in 2012, but whole RF group now involved in BERLinPro transmitters, first discussions with SOLEIL.  Hopefully next year first news on BESSY II SSA.  Which Lab is also looking forward to get 500 MHz ~75 kW SSA ??

BERLINPRO 10 BERLinPro is an energy recovery linac as a demonstrator to show, that ERL technology is able to fit to requirements for future light sources. Funded by Helmholtz-Gemeinschaft, Land Berlin and Helmholtz-Zentrum Berlin BERLinPro is a funded project to be realized at the HZB

BEAMPOWER STORAGE RING  LINAC 11 Linac Undulator Injektor Dump

STORAGE RING + LINAC = ERL 12

HOW AN ERL WORKS 13 Linac Undulator(en) Injektor Dump E ↑ E ↓

BERLINPRO RF REQURIEMENTS 14 3 x 7 cell cavities, 44MeV 3 x 2 cell cavity, SRF electron source: full beam loading  200 kW cw Booster cavities: full beam loading  450 kW cw Linac: energy recovery  < 5 kW kW cw

BASIC PARAMETERS OF BERLINPRO 15 Energy~ 50 MeV Merger energy~ 6.5 MeV Beam current100 mA Emittance1 mm mrad (normalized) Electron sourcesuperconduncting RF photoinjector Gun transmitter270 kW 1.3 GHz Booster cavities3 x 2-cell Booster transmitter 2 x 160 (270) kW + 1x 15 (200) kW Linac cavities3 x 7 cell Linac transmitter3 x 15 kW

STATUS RF TRANSMITTER FOR BERLINPRO 16 Injector and Booster transmitter 3 x 270 kW 1.3 GHz (linear range) klystron ordered at CPI First klystron will be delivered 2/2013 Call for tender circulator We open negotiations on power supplies with FUG (similar to 80 kW transmitter of MLS) Linac transmitter 15 kW 1.3 GHz solid state transmitters Call for tender try for first prototype (turnkey by industry) planned soon We are searching for ~ 3x70 m long 65 kV 25 A two poles cable or 6x70m 1 pole

COUPLER FOR INJECTOR CAVITIES 17 Cornell Koppler 60 kW cw tested KEK Koppler 170 kW cw planned by cERL (KEK) 50 kWcw and >100 kW long puls tested At the high power injector cavities we will use two couplers each cavity to reduce coupler kicks and reduce power level per coupler

Own design Electron source module In parallel to booster module Linac module  not action STATUS COLD MASS 18 Booster module Implementation of KEK coupler now clear, not compatible with Cornell module Calculations if it is possible to increase power level of Cornell coupler to stay on Cornell modules Rough drawings of KEK module Budget price for KEK module asked for quotation at Mitsubishi Heavy Ind. Decission of module type in preparation (this fall): Modified KEK module or Cornell module with modified couplers or FZD (SNS) module or KEK module Cornell module FZD module

STATUS CAVITY DEVELOPMENT (LINAC) 19 Linac cavities DoHRo Verbundforschung with Universities Dortmund & Rostock Cell shape Cornell  Jlab 5 or 6 WG, optimize WG assembly Mode calculations to determine HOM (Verbundforschungsmeeting Rostock) spectrum for BBU calculations H.W. Glock

CAVITY DEVELOPMENT (PHOTO INJECTOR) 20 Electron source cavity Started parameter studies to judge half-cell vs. 1.6 cell design: Started studies of choke filter design and implement new cathode holder Booster cavity: 2 cell Cornell design

21 GUN DEVELOPMENT IN THREE STAGES GUN0 IS A BEAM DEMONSTRATOR EXPERIMENT WITH SC PB CATHODE (2011), STUDY BEAM DYNAMICS, CAVITY PERFORMANCE FOR GUN1 ADD NC CATHODE WITH HIGH QE AT VIS, STUDY CATHODE LIFETIME, SLICE/PROJECTED EMITTANCE PERFORMANCE (2013) FOR GUN2 ADD RF INPUT POWER COUPLER FOR 200 KW (2014), STUDY HIGH POWER OPERATION STAGES OF GUN DEVELOPMENT

22 First beam 21 st April 2011 FIRST BEAM IN GUN STAGE 0 Gun stage 0 is installed in HoBiCaT Cooperation with Jlab, DESY, Soltan Inst. Swierk (Poland)

23 Thank you !