IST-2006-026409 www.eu-eela.org E-infrastructure shared between Europe and Latin America WP1 ADMINISTRATIVE AND FINANCIAL PROCEDURES Raquel Muñoz Félix.

Slides:



Advertisements
Similar presentations
E-science grid facility for Europe and Latin America Marcelo Risk y Juan Francisco García Eijó Laboratorio de Sistemas Complejos Departamento.
Advertisements

E-science grid facility for Europe and Latin America Marcelo Risk y Juan Francisco García Eijó Laboratorio de Sistemas Complejos Departamento.
Who Wants To Be A Millionaire?
Factor each trinomial:
THE PROJECT LIFECYCLE National Contact Point
1 Grafcet point de vue système. 2 Cliquez pour mise en route 0P 0Z 1V 2V 2V 1 1V 1 1V 2 1Z BPR 0Z 3 0V 1A.
Slide 1 Insert your own content. Slide 2 Insert your own content.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 3.1 Chapter 3.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
16/06/2004 EuroPa Plenary Meeting -Paris EuroPa Plenary Meeting Paris Agenda EuroPa Plenary Meeting, Paris 9:00 - 9:15Meeting objectives /
Quest ion 1? A.) answer B.) answer C.) correct answerD.) answer L C.) correct answer F.
Combining Like Terms. Only combine terms that are exactly the same!! Whats the same mean? –If numbers have a variable, then you can combine only ones.
BELIEF-EELA e-Infrastructures Conference Rio De Janeiro, Brazil June 25-28, 2007 The DRIVER Project D igital R epositories I nfrastructure V ision for.
Grid Initiatives for e-Science virtual communities in Europe and Latin America WP4 - NGI / LGI Infrastructure Services STATUS REPORT.
FREEDOM DRIVE 2013 The Future of Independent Living, Active Citizenship and Europe – 12 September 2013.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Multiplying monomials & binomials You will have 20 seconds to answer the following 15 questions. There will be a chime signaling when the questions change.
Exponents You will have 20 seconds to complete each of the following 16 questions. A chime will sound as each slide changes. Read the instructions at.
0 - 0.
2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt 5 pt 1pt Simplify All mixed up Misc. AddingSubtract.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Addition Facts
CS4026 Formal Models of Computation Running Haskell Programs – power.
Empty Box Problems Subtraction = 3 If you start on 6 and jump back 3 spaces you land on
BALANCING 2 AIM: To solve equations with variables on both sides.
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
© Richard A. Medeiros 2004 x y Function Machine Function Machine next.
ABC Technology Project
O X Click on Number next to person for a question.
© S Haughton more than 3?
Programación. Unidad 2 Operadores Operadores de asignación 1.= 2.+= 3.-= 4.*= 5./= 6.%= 7.>>= 8.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
12th EELA Tutorial, Lima, FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America.
Squares and Square Root WALK. Solve each problem REVIEW:
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Limits (Algebraic) Calculus Fall, What can we do with limits?
Properties of Exponents
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Free Powerpoint TemplatesPage 1Free Powerpoint Templates Spelling #6.
E-science grid facility for Europe and Latin America Ancillary Services (TSA1.2) Accomplishments Ramon Diacovo CEFET-RJ/UFRJ (Brazil) SA1.
IST E-infrastructure shared between Europe and Latin America The gLite Information System(s) Christian Grunfeld, UNLP EELA.
E-science grid facility for Europe and Latin America SA1 - Grid infrastructure service activity Status Report Diego Carvalho Activity Manager.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Click your mouse to move the card ahead! Work with a buddy using two Abacuses. First click and follow along using your abacus. After each click talk about.
What is Slope Assignment. List the four types of slope and sketch each type. 1.
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Week 1.
We will resume in: 25 Minutes.
1 Ke – Kitchen Elements Newport Ave. – Lot 13 Bethesda, MD.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
O X Click on Number next to person for a question.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America 1 WP4: Tutorials and Workshops: requests.
IST E-infrastructure shared between Europe and Latin America WP1 FINANCIAL PROCEDURES Raquel Muñoz Félix Barrio Tutorial Santiago.
E-science grid facility for Europe and Latin America Scattering Grid knowledge under EELA-2 Riccardo Bruno 1, Herbert Hoeger 2, Maria Jose.
Presentation transcript:

IST E-infrastructure shared between Europe and Latin America WP1 ADMINISTRATIVE AND FINANCIAL PROCEDURES Raquel Muñoz Félix Barrio WS Rio de Janeiro, 24/06/2006

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 2

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 3 ACTIVITIES AGENDA

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 4 INDICO

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 5 INDICO/CONFERENCES

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 6 ACTIVITIES AGENDA

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 7 EVENTS CALENDAR

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 8 DOCUMENTS

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 9 DOCUMENTS/PROCEEDINGS

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 10 DOCUMENTS/TA

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 11 TA

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 12 DOCUMENTS/TEMPLATES

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 13 DELIVERABLE

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 14 DELIVERABLES

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 15 DOCUMENT PUBLICATION RULES Document presentation –Document identifier for deliverables   Project name>-  Deliverable identifier  - v  Version>.<Revision   For example:  EELA-D2.1.1-v0.0  For example:  EELA-D2.1.1-v0.0 (Draft version)  EELA-D2.1.1-v0.1 (Draft version in a consistent form)  EELA-D2.1.1-v0.2 (Draft version submitted for the formal review)  EELA-D2.1.1-v1.0 (Deliverable approved by the TEB)  British English date format will be used for all documents, e.g. 22/05/2006 for 22th May  Titles for EU deliverables should be the same as the ones defined in slide 14 of this presentation.

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 16 MAILING LISTS

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 17 OVERVIEW OF MAILING LISTS

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 18 SUBSCRIPTION TO MAILING LISTS

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 19 MEMBER LIST

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 20

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 21 DELIVERY DEADLINES TABLE

IST E-infrastructure shared between Europe and Latin America Itacuruçá, WP1, 24/06/2006 Location, Meeting, dd.mm.yyyy 22 Project Office Raquel Muñoz Project Office CIEMAT Tel.: (+34)