1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

Cross-regional roadmap for Day-Ahead Market Coupling XXI Florence Forum Florence, 5 December 2011.
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling Work in progress, This version: 22 September 2011 updated after 5 th AESAG, 20 September 2011,
1 Unit C3 Finance, legal Affairs and Partner support CALL FOR PROPOSALS APPLICATION PROCEDURE SPECIFIC ADMINISTRATIVE AND FINANCIAL ISSUES Version
Coordinated Market Coupling for GB. 2 Service Provision specified to create a GB Hub with open access to : All GB connected ICs to coordinate XB Capacity.
2 nd Workshop MFG, , Bucharest The current status on the Market Design of the SEE REM and the way forward.
TITRE 28/03/2012 NWE IG meeting – Amsterdam Schiphol NWE day-ahead price coupling – cost issues.
SWE IG Meeting Paris, CRE XBID Overview Supported by.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
NWE Day-ahead price coupling project Cost Issue 2 nd IG Meeting 26 October APX ENDEX.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
FUI Feedback on PCG Target Model and roadmap propositions FUI Stakeholder Group Meeting Paris, 4 th November 2009 These comments reflect the general views.
Florence Forum Third package December, The possibility given by the EC to all stakeholders to comment the ” Discussion paper on the Third Energy.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Implementation of PCR for Day-Ahead Price Coupling in NWE Andrew Claxton NWE Stakeholders’ Workshop 9 December 2012.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
on Congestion Management (IG)
Day-Ahead Market Coupling Algorithm approval coordination NWE IG, Schipol, 28. March 2012.
1 TITRE Update on approval processes for NWE price coupling NWE IG on DA and ID Copenhagen, 9 May 2012.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Project Status Update 2 nd IG meeting NRA meeting October 26 th Joint Presentation from.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting March 28 th 2012 Amsterdam Joint Presentation from TSOs and PXs.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Status of Implementation of PCR for Day-Ahead Price Coupling Florence Forum 5 December 2012.
Draft cross-regional roadmap for Day-Ahead Market Coupling - Work in progress - NWE day-ahead price coupling project IG meeting 26 October 2011.
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
PCR Status report AESAG, September Supported by:
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
Brief status on key on-going PCR activities NWE Regulators IG Meeting 28 Mar March 2012.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 1 October, 2010 Jurmala ACER and regulatory empowerment.
C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
NWE Day-Ahead Price Coupling
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Status of Implementation of PCR for Day-Ahead Price Coupling
Supported by: PCR Status report AESAG, September
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
NWE Day-ahead price coupling project Cost Issue
SWE Day- Ahead market coupling
Context 12 TSOs in North West Europe (NWE) have commenced a project to facilitate a single price coupling across a region covering CWE, Scandinavia and.
Continuous Cross-Border Implicit Intraday Trade Status update
NWE Day-Ahead Price Coupling
ERGEG GRI South South East – , Maribor
Supported by: PCR Status report AESAG, September
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Presentation transcript:

1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs from the NWE Region

2 page 2 C O U P L E D Joint TSO-PX presentation Content Status on the APCA/ Comfort letter Joint Project Organisation Regulator Questions from last IG meeting

3 page 3 C O U P L E D Joint TSO-PX presentation All Party Cooperation Agreement (APCA) The APCA for design and implementation is a framework agreement, with annexes setting out e.g. governing principles, budget, cost sharing, plan, decision making process and high level principles for operation of market coupling The agreement is negotiated by the NWE PXs and TSOs, and is expected to be ready for signature before Florence forum (22. and 23. May) TSOs have stated need for comfort that NWE related costs will be accepted by the NRAs prior to signing or entry into force of the APCA

4 page 4 C O U P L E D Joint TSO-PX presentation The Comfort Letter The purpose of the comfort letter is to deliver sufficient information to enable the lead NRAs of the NWE project to facilitate issuing of a comfort letter, and thereby to facilitate signing of the cooperation agreement between the TSOs and PXs in May, in order to safeguard expedient and timely delivery of the project. Information provided in the letter is, governance and cooperation principles, cost sharing and cost recovery principles, budget, algorithm requirements and high level price coupling governance principles

5 page 5 C O U P L E D Joint TSO-PX presentation Joint Project Organisation (1/2) Joint PMO (Consultant: E-Bridge ) NWE JSC Technical WG Corne Meeuwis Legal, Regulatory and Market WG Tjitske Kramer Procedures TF Testing TF Capacity TF Local Sub-Projects Shipping TF Regulatory TF Shipping Financial TF TSO-only Sub-Project Reporting External Communication & Markets TF Legal & Contracts TF PX-only Sub-Project ITVC Shipping Sub task GB Shipping Sub task Algorithm TF

6 page 6 C O U P L E D Joint TSO-PX presentation Joint Project Organisation (2/2) NWE JSC (TSOs and PXs) This function is acting as a Board, making major decisions and safeguarding timely completion of the NWE project. Working Groups (chairs: Corné Meeuwis and Tjitske Kramer) 2 main WGs, one technical (Corné) and one legal and regulatory (Tjitske). The WG chairs are with the support of the PMO, responsible for progress and are reporting to JSC. PMO (E-Bridge) This function is facilitating the work in the joint project, acting as “secretary general”. Task Forces Representation of all parties, or 3-4 specialists and reading members (1 per party).

7 page 7 C O U P L E D Joint TSO-PX presentation NRA questions from last IG meeting Question: NRAs request more detailed information on budget. Preferably, this should be sent together with TSOs’/PXs’ request for regulatory approval of sharing arrangements and validation of common and local costs Answer: A comfort letter is prepared, and are ready to be forwarded, with the required information on the budget.

8 page 8 C O U P L E D Joint TSO-PX presentation Answer to NRA Budget request 1/2 Preliminary budgets for design and implementation comprise: Combined NWE PX costs of €10.3m –€3.3m (60%) of PCR Common Costs (commonly procured services: project manager, taskforce leaders, algorithm and system development) –€7m of local costs (support to PCR/NWE project plus PX-specific changes) NWE Common Costs of €0.8m, excluding shipping implementation costs (project office, taskforce leaders) –Project Management Office (PMO) costs amount €0.37m –WG leaders are paid as PXs-only respectively TSOs-only, and therefore not part of the common costs. The budgets assume a go-live at the end of December of NWE Market Coupling based on the PCR/PMB solution. The budgets will be finalised as part of the APCA completion process during early May. Any change to this plan and possible budget changes are subject to JSC approval.

9 page 9 C O U P L E D Joint TSO-PX presentation Answer to NRA Budget request 2/2 In this overview, the shading indicates:

10 page 10 page C O U P L E D Joint TSO-PX presentation NRA questions from last IG meeting Questions: NRAs request to provide a proposal for cost sharing between NWE and non-NWE countries Answer: The NWE TSOs and PXs will, provided regulatory approval, pay their share (60 %) of the PCR costs. The NWE parties will also pay NWE related cost. The non- NWE TSOs and PXs should pay 40 % of the PCR costs and all non- NWE related costs. The APCA facilitates geographical extension of the price coupling, new PXs and TSOs shall pay for regional adaptation provided they have special needs.

11 page 11 page C O U P L E D Joint TSO-PX presentation NRA questions from last IG meeting Questions: NRAs request a clear proposal on high level flexible high-level interim governance arrangements for the NWE project. Answer: The APCA includes an annex (NR. 6: Price Coupling governance principles) with the high level governance arrangements. The governance arrangements are also described in the comfort letter. The Parties acknowledge that currently Governance Guidelines are being drafted and negotiated with the European authorities. Such legislation under development may affect the cooperation under this NWE APCA, and this is reflected in the APCA. The parties do not see any particular challenges in this respect.

12 page 12 page C O U P L E D Joint TSO-PX presentation Answer to NRA request for proposal on governance arrangements (APCA Annex Nr. 6) Capacity allocation is a TSO responsibility, pursuant to the provisions of Directive 2009/72/EC of 13 July 2009 concerning common rules for the internal market in electricity, and of Regulation (EC) No 714/2009 of 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity. PXs are responsible for operating their respective markets (including price formation), under various contractual and/or regulatory arrangements. The nature of capacity allocation is that of a monopolistic function, the TSOs are regulated entities, and therefore the TSOs need at all times to be in a position to have sufficient comfort on compliance, in particular on the cooperation between the PXs (of the NWE Region or broader in PCR as the case may be), to achieve the Enduring Solution with the following criteria (the “Compliance”): 1.Competition law compliance 2.Geographical expansion of Price Coupling 3.PCR Solution for NWE 4.Cost efficiency 5.PXs’ role of operators