Best praxis project for smart city www.stepupsmartcities.eu Comprehensive heat meters data remote reading in the city district heating (DH) system.

Slides:



Advertisements
Similar presentations
Using Ground Source Heat Pump The Avenue Centre.
Advertisements

Rīgas Tehniskā universitāte Enerģētikas un elektrotehnikas fakultāte Vides aizsardzības un siltuma sistēmu institūts DEVELOPMENT OF.
Business Plan: Balancing the electrical grid load by remote control of electrical consumers Student: Gregor Androjna address student:
| 1 Anshan 2015 – A world leading low carbon District Heating system
District heating tariffs as a tool to change consumers behaviour Klaus Sørensen Consul General Royal Danish Consulate St.Petersburg.
SMART CITY SIBIU –PILOT PROJECT. CONTENT 1.SMART CITY, element of SMART GRIDS 2.City of SIBIU - Statistics 3.Optimising Energy Systems 4.Pilot Project.
Development of the Smart Grid Implementation of the Board’s Policies November 20, 2012.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
0 © 2011 Silver Spring Networks. All rights reserved. Building the Smart Grid.
Updating Mongolia’s Energy Masterplan Michael J. Emmerton, ADB Team Leader - 24 May 2013.
1 Cara Blockley Low Carbon Projects Manager Future Distribution Networks 15 October 2013.
Bent Ole Gram Mortensen Legal framework as a core element of district cooling success – the case of Denmark HE 2014, Wuhan.
Electrical Engineering Department, Amirkabir University of Technology, Tehran, Iran M. Poursistani N. Hajilu G. B. Gharehpetian M. Shafiei CHP Systems.
Donors’ Conference on Sustainable Energy for Kosovo
Smart Grid Research Consortium Conference Austin, Texas Mark Ponder President ElectSolve Technology Solutions and Services, Inc.
1. 2 Jamie Caplan Square D by Schneider Electric Energy Solutions – Northwest Tel:
Smart Grids for Future City May Mln Clients 45 Mln Smart Meters 30 Countries 96 GW Installed Capacity 2.
MINISTRY OF ENERGY RUSSIAN FEDERATION Combined Heat and Power Technologies for Distributed Energy Systems.
Camden Sustainability Partnership Board 1st March 2011.
Best praxis project for smart city Energy consumption management in public buildings.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
FUTURE IN ENERGY. The biggest co-generation high efficiency power plant in Romania, built in Suceava Investment value: over EUR 90 mil Used fuels: natural.
Euroheat & Power Why is there not more combined heat and power?
Solar Metering and Performance Monitoring Exposition June 4, 2007.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
HARVEST GROUP Smart Grid Harvest Power Technologies 30 th Aug 2014.
Energy & Environment Report for 2008 – 2009 Ian Rowe Manager (Health, Safety & Environment)
Future of Smart Metering Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007.
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
Smart Grid m Yumiko Kimezawa August 12, 20111Colloquium.
Folie 1 Quality Management in local biomass district heating plants and grids Optimising operations based on monitoring activities biomass energy for heating.
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
Electrical Equipment Park in in Russian Federation Russian Federation on the basis of Korean technology Project’s conception presentation Moscow Region.
Smart Grid - Developments and Implementations Prof. Gady Golan – HIT, Israel Dr. Yuval Beck – HIT, Israel , Electricity 2012, Eilat.
NATUR NÜTZEN. NATUR SCHÜTZEN. Wood Energy – Contracting Projects in the Province of Styria, Austria EUROFORENET Conference, Brussels, 20 th November 2007.
CONTENTS 1. Introduction 2. Smart Metering System 3. How does the system work? 4. Advantage of AMR system Electric company benefits.
© 2008 OSIsoft, Inc. | Company Confidential Smart Grid, Smart Metering and DSM OSIsoft and Cisco systems Arjen Zwaag- Cisco Martin Otterson- OSIsoft.
Vermont Electric Power Company, Inc Vermont’s eEnergy Smart Grid Initiative Kerrick Johnson Vice President for External Affairs.
1 World Bank Investments in Uzbekistan Tashkent August 17, 2012 Takuya Kamata Country Manager for Uzbekistan The World Bank.
Samordningsrådet med kunskapsplattform för smarta elnät Smart Grid and Smart Metering - Swedish Experiences Karin Widegren, Director Swedish Coordination.
Project „ Information and Communication Technologies solutions for improvement of quality in the municipal utilities” Nr. LLV-393.
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
ENERGY AGENCY LITHUANIA Perspective for the EU Structural Assistance to the Energy Projects in Lithuania for the period Marijus Franckevičius.
1 PILOT CASE: Installation of remote control systems for energy management in public buildings participating in “Championship” GRANOLLERS-LAG: Local Working.
A MAJOR PLAYER IN ENERGY EFFICIENCY AND RENEWABLE ENERGY SOURCES The District Heating Network, the most modern and adapted tool to develop renewable energy.
Energy Projects in Serbia – Opportunities for German Companies 28. May 2013 Dr. Jürgen Welschof Director KfW Office Belgrade.
Presentations of VIVERACQUA proposal idea in view of the call ICT-34 for PCPs in any area of public interest that requires new ICT based solutions The.
Steady State Analysis Of A Microgrid Connected To A Power System
INTERREG IIIC - REGENERGY Promoted by the European Union Development of municipal District heating supply in Latvia Gaidis Klavs Institute of Physical.
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
Intracom Telecom | Corporate Presentation Intracom S.A. Telecom Solutions | 19.7 km Markopoulou Ave., GR | t: | f:
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
Operational form: Szeged: Asset rental contract until 2024 Algyő: concession until 2018 Utility owners: Local municipalities Operated utility asset:
London needs to be more like Copenhagen Bob Fiddik Team Leader – Sustainable Development & Energy 19 th March 2012.
Presentation of the investment potential of the company for the organization of production in the engineering sector The city of ORSK, ORENBURG REGION,
11 Measures to support high- efficiency district heating and cogeneration Anders Hasselager Senior Policy Advisor Kiev, 19 May 2016.
Heat Plan Denmark Low Carbon Urban Heating Anders Dyrelund, market manager Rambøll Denmark.
Esa Nikunen Helsinki’s Climate Road Map 2050 Esa Nikunen, GD, Helsinki Environment Centre Paris, 30 th November
Market possibilities within the energy efficiency in Latvia The Royal Danish Embassy in Riga prepared for The Danish Board of District Heating Inese Leja-Raphael.
Mountain Association for Community Economic Development Celebrating 40 years! Kentucky Commercial Energy Efficiency: Excellence in Economic Development.
Dr Christoph Mazur.
Chairman of the Board and CEO,
Connection methods in district heating networks
SCORES project presentation
District heating in Finland 2017
SCORES project presentation
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Advanced Metering Infrastructure Smart Meters
Presentation transcript:

Best praxis project for smart city Comprehensive heat meters data remote reading in the city district heating (DH) system

Page 2 Every building - which is connected to the city DH system - is equipped with the up – to – date building heat substation (BHS) with indirect consumer connection mode to grid. Heat meter readings were performed in separate time in manual mode before the current system update, sometimes in different days and therefore was necessity to involve curtain amount of employees to read data of more than BHS, reports preparation and transmission. Best praxis example project includes upgraded heat meters in building heat substations and their data remote reading by dispatch board and thereby performs innovative method of consumed energy - almost simultaneous data collection which takes not more than three hours from substations. Advantages are: relieving staff from this monthly extra duty, improvement of consumption - billing data accuracy, allows current issues to resolve fast Comprehensive heat meters data remote reading in the city district heating (DH) system

Page 3 Comprehensive heat meters data remote reading in the city district heating (DH) system District heating (DH) is the main heat supply type in the city from Heat supply network length is about 900 km Number of DH system consumers – 7423 pcs (2012.g.) with the connections at 8078 building heat substations DH covers 76% of the city heat demand >90% of heat energy is produced highly efficient combine heat and power (CHP) mode in CHP plants DH heat supply network heat loss - 13% Comprehensive heat meters data remote reading mode was introduced in 2012.

Page 4 Comprehensive heat meters data remote reading in the city district heating (DH) system System layout

Page 5 Comprehensive heat meters data remote reading in the city district heating (DH) system Network settlement of 86 base stations & retranslation boards in the city

Page 6 Integrated approach Project includes smart upgraded heat meters in building heat substations for their data remote reading by up-to- date wireless data transmission systems. Measure introduction is performed by the utility – after co- ordination with the building managers – and in close cooperation with professionally skilled company.

Page 7 Investment size and sources Measure introduction is financed by the utility with possible attracting co-financing state or structural resources. The utility own capital and loan were investment sources for the current project. Cost of the current project introduction was – 1,72 million Ls/ 2,45million EUR without VAT.

Page 8 Results After the measure introduction utility might receive on regularly bases data of heat meters operation and heat loss. Potential heat supply might be fast identified and resolved, thereby reducing loss and improving service quality. Less time consuming billing routines. Less data imperfections in billing caused by manual data reading and recording. Wider service opportunities of clients. Optimized performance of staff employment.

Page 9 Measure enforcement issues and risks Measure introduction engaged the data transmission resources for the only one type of energy (heat energy) data collection. Might be rationally to use this data transmission system also for remote metering and data transmission of other consumable types – gas, water, electricity – which would lower system introduction costs.

Page 10 More information For communication: JSC “Rīgas siltums” Phone