NA3 DORII: Deployment of Remote Instrumentation Infrastructure David Gutiérrez – Emilio Díaz University of Cantabria NA3 – Application.

Slides:



Advertisements
Similar presentations
Dynamic OL Monitor Program streamlines information. Developed by a Medical Technologist working in the lab at HMSW hospital (Site THR). Based on the SmarTerm.
Advertisements

Challenges for Interactive Grids a point of view from Int.Eu.Grid project Remote Instrumentation Services in Grid Environment RISGE BoF Manchester 8th.
CGW 08, Kraków, October 13-15th,  Integration of instrumentation and selected applications with e-Infrastructure and maintenance on production.
EGEE 08, Istanbul, September 25th, Support for experimental science communities Istanbul, September 25th, 2008 Norbert Meyer, Marcin Płóciennik.
DORII: Training for Pilot Application Evaluation Paolo Gamba Matteo Lanati.
What’s new in this release? September 6, Milestone Systems Confidential Milestone’s September release 2012 XProtect ® Web Client 1 Connect instantly.
CWIC Exception & Error Handling Archie Warnock Lingjun Kang Genyong Yu
Team 7 / May 24, 2006 Web Based Automation & Security Client Capstone Design Advisor Prof. David Bourner Team Members Lloyd Emokpae (team Lead) Vikash.
ASP.NET 2.0 Member/Role Management with IIS Peter Kellner, Software Engineer/Consultant (download for class on Web Site)
Distributed Application Management Using PLuSH Jeannie Albrecht, Christopher Tuttle, Alex C. Snoeren, and Amin Vahdat UC San Diego CSE {jalbrecht, ctuttle,
Lesson 11-Virtual Private Networks. Overview Define Virtual Private Networks (VPNs). Deploy User VPNs. Deploy Site VPNs. Understand standard VPN techniques.
Securing Enterprise Applications Rich Cole. Agenda Sample Enterprise Architecture Sample Enterprise Architecture Example of how University Apps uses Defense.
Computer Programming.  Analysis  User requirements  Feasibility and costs  Success criteria  Design and Planning  Classes  Data structures and.
Final Design and Implementation
Chapter 22 Systems Design, Implementation, and Operation Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 22-1.
TeraGrid Information Services December 1, 2006 JP Navarro GIG Software Integration.
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
MCSE Guide to Microsoft Exchange Server 2003 Administration Chapter Four Configuring Outlook and Outlook Web Access.
DORII Joint Research Activities DORII Joint Research Activities Status and Progress 4 th All-Hands-Meeting (AHM) Alexey Cheptsov on.
Matthew Moccaro Chapter 10 – Deployment and Mobility PART II.
SOS EGEE ‘06 GGF Security Auditing Service: Draft Architecture Brian Tierney Dan Gunter Lawrence Berkeley National Laboratory Marty Humphrey University.
Honeypot and Intrusion Detection System
NA3 DORII: Deployment of Remote Instrumentation Infrastructure Matteo Lanati EUCENTRE (European Centre for Training and Research in.
Module 10: Monitoring ISA Server Overview Monitoring Overview Configuring Alerts Configuring Session Monitoring Configuring Logging Configuring.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
Unicenter Desktop & Server Management Components & Communication -Latest Revision 12/09/2005.
Systems Development Lifecycle Testing and Documentation.
Grid Resource Allocation and Management (GRAM) Execution management Execution management –Deployment, scheduling and monitoring Community Scheduler Framework.
DORII review Remote instrumentation communities and application support NA3 Roberto Pugliese Sincrotrone Trieste SCpA.
DORII Joint Research Activities DORII Joint Research Activities Status and Progress 6 th All-Hands-Meeting (AHM) Alexey Cheptsov on.
Database Administration COMSATS INSTITUTE OF INFORMATION TECHNOLOGY, VEHARI.
WSM Administrator Training. WSM Administrator Discussion of WSM Administrator responsibilities Discussion of WSM administrative interfaces Detailed discussion.
1 Operations Objectives April 21, Q
1 Taverna CISTIB Ernesto Coto Taverna Open Workshop, October 2014.
Planning an Installation and d Upgrade. Learning Objectives  To learn how to plan an upgrade and installation.
GRIDS Center Middleware Overview Sandra Redman Information Technology and Systems Center and Information Technology Research Center National Space Science.
Case Study.  Client needed to build data collection agents for various mobile platform  This needs to be integrated with the existing J2ee server 
US LHC OSG Technology Roadmap May 4-5th, 2005 Welcome. Thank you to Deirdre for the arrangements.
Retina Network Security Scanner
Graphical Design Environment for a Reconfigurable Processor IAmE Abstract The Field Programmable Processor Array (FPPA) is a new reconfigurable architecture.
June 13-15, 2007Policy 2007 Infrastructure-aware Autonomic Manager for Change Management H. Abdel SalamK. Maly R. MukkamalaM. Zubair Department of Computer.
Testing and integrating the WLCG/EGEE middleware in the LHC computing Simone Campana, Alessandro Di Girolamo, Elisa Lanciotti, Nicolò Magini, Patricia.
Michael Dunn Ryan Sessions Kyle Kerrigan.  Allows corporate office to manage client locations remotely  Distributed application ◦ i.e. agents & data.
LCG Distributed Databases Deployment – Kickoff Workshop Dec Database Lookup Service Kuba Zajączkowski Chi-Wei Wang.
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
Configuring and Deploying Web Applications Lesson 7.
Lesson 1 1 LESSON 1 l Background information l Introduction to Java Introduction and a Taste of Java.
Daniele Spiga PerugiaCMS Italia 14 Feb ’07 Napoli1 CRAB status and next evolution Daniele Spiga University & INFN Perugia On behalf of CRAB Team.
The Earth System Grid (ESG) A Fault Monitoring System for ESG Components DOE SciDAC ESG Project Review Argonne National Laboratory, Illinois May 8-9, 2003.
CTSSv3 Cutover Checklist Draft 3 JP Navarro, Lee Liming May 25, 2006.
D.Spiga, L.Servoli, L.Faina INFN & University of Perugia CRAB WorkFlow : CRAB: CMS Remote Analysis Builder A CMS specific tool written in python and developed.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Mario Reale – GARR NetJobs: Network Monitoring Using Grid Jobs.
Current GEMINI use of instrumentize script to initialize & configure services Hussam Nasir University of Kentucky.
Designing a Control System Sayande Adekoye College of North West London.
Part A. Remote Viewing IP Surveillance Camera Application Guide.
Geant4 GRID production Sangwan Kim, Vu Trong Hieu, AD At KISTI.
Project Outline I A New CRM database must accomplish the following:  Deliver support resources for internal IT  Integrate all data from existing CRM.
Installing git In Linux: sudo apt-get install git In Windows: download it from run the setuphttp://git-scm.com/download/win.
© 2006 Open Grid Forum Remote Instrumentation (not only) for fun LEGO Mindstorm Exploration Demo Authors: Andrea Del Linz, Roberto Pugliese (Sincrotrone.
The GRIDCC project Luke Dickens Imperial College / LeSC On behalf of the GRIDCC collaboration.
Advanced Data Structures Lecture 1
Contents Software components All users in one location:
BaBar-Grid Status and Prospects
Budget JRA2 Beneficiaries Description TOT Costs incl travel
Design rationale and status of the org.glite.overlay component
Mobile Operating System
Remote Operations and Online Processing
Software Development Process
CT 1306 Communication Networks Management Lab
From Prototype to Production Grid
Presentation transcript:

NA3 DORII: Deployment of Remote Instrumentation Infrastructure David Gutiérrez – Emilio Díaz University of Cantabria NA3 – Application status

List of DORII applications HORUS_bench

Current status of the application HORUS_bench Status of the VCR: VCR installed and configured Status of the VCR personalisation Personalised by CSIC – Ignacio Coterillo Status of the IE IE installed and configured – Some security issues Status of IE personalisation (IM implementation) IM working. Status of CE (porting of the application code) Code already running on CE. Status of the SE (connection with the IE) SE running, connection via gridFTP affected by security issues. Status of the collective behaviour (workflow and connection of components) Defined

HORUS_bench – main tasks Workflow management (define what users can do) Algorithm management (define how users can do) Use of the application: (do).

HORUS_bench – detailed tasks Workflow design: Create workflows Hide / Delete workflows

HORUS_bench – detailed tasks Algorithm management: Algorithm set-up Algorithm list management

HORUS_bench – detailed tasks Use of the application: Login Select set of algorithms to be employed Select data source (mainly, site) to be processed Select data by different criteria Have the data processed Obtain the output

Key users of HORUS_bench System developers / managers: Ana Silió Algorithm developers: Elena Castillo Algorithm users: Imen Turki

Data samples

Next steps of HORUS_bench Within the VCR: Implement Data Selection procedures Implement Algorithm management procedures Create “reduced” application form “real” IM for cameras (final capture software still under development)