Cross Border Intraday BE-NL

Slides:



Advertisements
Similar presentations
Secondary Market with Transmission Capacities ČEPS, a.s. 11/2006.
Advertisements

Cognitive Radio Communications and Networks: Principles and Practice By A. M. Wyglinski, M. Nekovee, Y. T. Hou (Elsevier, December 2009) 1 Chapter 12 Cross-Layer.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Handling of grid losses of HVDC cables in NWE Market Coupling - EMCC proposal for compensation of grid losses – NWE day-ahead meeting, Copenhagen, 22/08/2012.
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Den Hague 10/10/11 Yves Langer Capacity pricing workshop.
How to do intraday capacity pricing in a continuous trade environment? 10 October 2011 NRA-TSO-PX meeting (Informal minutes, made during workshop, of the.
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Vision for the internal electricity market
Text 1 July, 2010 DCMS: Training Manual Campaign Management.
Centre Consulting Experts in Enterprise Performance Management Toshiba Medical Systems roadmap to optimized Performance Management –
SWE IG Meeting Paris, CRE XBID Overview Supported by.
EuroPEX Decentralized Market Coupling as the preferred cross-border method B. den Ouden, President of Europex APEx Annual Conference 2004 Leipzig, Germany,
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
New EU Rules on Derivatives Trading The EMIR Reporting Technical Standards Victoria Cooley OTC Derivatives & Post Trade Policy Financial Conduct Authority.
1 Intraday in the CWE region NWE and Bilateral initiatives Common RCC CSE - CWE 28 September 2010.
Assessment of differences in market designs in the CS region Milan 18 July 2008.
Balancing Update Stakeholder Group Meeting - 4 November 2009.
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Futures Options Chapter 16.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
Guidelines for Good Practice on Information Management and Transparency EuroPEX Comments and Suggestions Brussels, 6 th of July 2006.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG July 2008 Jean-Philippe Paul - John Prime.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
1 page 1 C O U P L E D NWE Day-Ahead Project 1 st NWE Stakeholder Workshop London 9 th December 2011 ENTSO-E Regional Group Northwest Europe.
Implementation of PCR for Day-Ahead Price Coupling in NWE Andrew Claxton NWE Stakeholders’ Workshop 9 December 2012.
Introduction of an Intraday market on the Italian borders for the year 2011 Terna proposal Electricity Regional Initiative – CSE Region 15th Implementation.
Italy-France Cross-border Intraday: Technical feasibility study CSE SG Group meeting Rome, 15 May 2012.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Implementing Strategy in Companies That Compete in a Single Industry
Draft document – Work in progress
The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Gent Summer School: Electricity Markets & Trading Gregory Michiels 27 August 2013.
Regulatory challenges in the Baltic electricity market(s) in connection to development of new nuclear power plant project(s) in the Baltic countries Andres.
The Market Coupling Experience in Europe Jean-François CONIL-LACOSTE CEO Powernext SA CEO EPEX Spot SE APEX 2008 Conference Session 1 - Part 3: European.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Electricity trading in emerging markets Vienna Economic Forum Tirana, Albania 8-9 June 08 1 EXAA 2008.
Actions for establishing a Single Auction Office for CSE 9 th IG Meeting Milan, 18 th July 2008.
The European Electricity Market Integration and some Thoughts on Gas Markets Market Coupling and Ways Forward Lene Sonne Vice President, Market.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
Nord Pool Spot and Europe
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
COMMENTS TO THE SOUTH-WEST EUROPE ELECTRICITY REGIONAL ENERGY MARKET Draft detailed action plan version 1, 22 June 2007.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Introduction of an Intraday market on the Italian borders for the year 2011 Electricity Regional Initiative – CSE Region Milan, 16/11/2010.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY Regulation of operation and organization of the electricity day-ahead market with the price market coupling mechanism.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
2nd Mini-Forum for Central West Electricity REM
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
NWE Cross Border Intraday
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Draft document – Work in progress
Imbalance Netting Platform
Scheme of the Algorithm for the Acceptance and Settlement of Bids in the TSO-TSO Model of AT-BE-CH-DE-FR-NL.
RR Platform – Implementation Framework
Presentation transcript:

Cross Border Intraday BE-NL Interim Solution Brussels, 26 July 2010 A. Vreeman (APX-Endex) T. Kramer (Belpex)

Agenda Elbas introduction Interim solution Technical implementation Trading Block bids Transmission capacity Settlement Enduring solution Compatibility Parallel approach

Elbas today The only cross border intraday market in Europe Continuous 24/7 trading Individual hours Blocks bids A tool to adjust trades made in the day-ahead market before hour of delivery Fast developing liquidity: 1.8 TWh in 2008 2.3 TWh in 2009 Real-time Reliable Proven

The Elbas model as-is Developed during the nineties Customer need for adjustment of day-ahead schedules before hour of delivery Risk and uncertainty due to expensive and unpredictable balancing market Need for a more efficient use of the remaining cross border capacity after day-ahead trading Potential for a better use of production flexibility across borders Further development / extension foreseen: Negative prices Smaller volume tick size i.e. 0.1MW instead of 1MW (under discussion) Further volume and liquidity increase (30 % increase the last year) Further geographical growth (Benelux, the Baltic) Increased cable capacity between the Nordic countries and the continent

Elbas ad-interim Implicit cross border trading makes better use of grid capacity: Immediate improvement of current situation NL-BE Potential to link NL-BE to NO and GE: Access to counterparts with different product mix Access to counterparts with different weather conditions Access to counterparts with different marginal costs Increases the potential for flexible producers (i.e. hydro) Reduces the risk of the balancing market Reduces the risk of prices below marginal cost Learning experience to help develop enduring Target Solution

Interim solution Relatively modest cost/effort: Elbas as-is (only development of interfaces and supporting software) Use of existing systems and infrastructure, proven technology Relatively minor TSO efforts required No interference with other interim solutions (e.g. FR-DE-AU) Important improvement of today’s allocation mechanism Continuous implicit allocation, coupling of existing ID markets Together with other regional solutions: comprehensive solution, even if links between platforms rely on trader arbitrage Initial Scope: NL-BE Potential: NL-DE and NL-NO targeted, other extensions can be investigated Facilitates development of an enduring solution Refinement of target requirements, based on learning experience Governance framework can be re-used for enduring solution, although not a necessity Strong commitment of APX-Endex, Belpex and Nord Pool to support establishing the enduring Target Solution, in part given by shared views and secured by similarities in shareholder structures

Interim solution step 1: NL-BE Elia + TenneT operators: Real-time capacity monitoring Re-use of pro-rata allocation platform Elbas system: Hosted by NPS Separated from NPS Elbas market (as no capacity is made available yet), but the same instance is used = opportunity Well-known, appreciated, implemented and deployed, reliable and proven (uptime 99.98%) Local operations by APX/Belpex: Existing membership arrangements are retained Existing risk management, reporting and settlement systems are retained Well-known, appreciated, implemented and deployed, reliable and proven Capacity Matrix Matching Algorithm Shared Order Book APX/NL market BPX/BE market Clearing/ Notification Systems (APX) Clearing/ Notification Systems (APX on behalf of BPX)

Interim solution step 2: NO-GE-NL-BE Open Capacity Matrix: GE-NL, GE-DK TSO operator(s) TSO operator(s) Capacity Matrix Master (Slave GE-NL, GE-DK) Matching Algorithm Other interim solutions (FR-DE?) Direct Access Shared Order Book APX: NL market BPX: BE market NPS: Nordic, GE market Clearing/ Notification Systems (APX) Clearing/ Notification Systems (APX on behalf of BPX) Clearing/ Notification Systems (NPS)

Trading Elbas supports continuous trading, where XB trading is possible if and insofar TSOs provide XB transmission capacity: what you see is what you get If bottlenecks from BE to NL, then participants in NL will not see the sales bids from traders in BE If there are no bottlenecks, all participants view all bids in the market: there is ONE MARKET

Continuous trading A bid/offer consists of: The product i.e. the instrument to be traded The volume The price Minimum volume of a bid/offer is 1 MWh Minimum price tick-size is 10 €cents Priority order of bids/offers: Price i.e. incoming bid/offer receives the best available price(s) Timestamp i.e. arrival of the bid/offer to the register Any bid/offer is binding until: A trade happens, the bid/offer is changed inactivated or cancelled Expiry of the instrument to be traded A bid/offer can be changed or cancelled until it is filled i.e. it finds a counterparty in the market

Block bids Execution constraint: “all-or-none” Matching of a block bid and offer requires fulfillment of: The length of the block The price The volume Traders are free to define the block’s start and stop hours The volume (MW) is the same for each hour The price (€) is the same for each hour Average Price Calculator tool can be used when placing block bids A block bid/offer can consist of all hours open for trading, hence a block can at the maximum be up to 32 hours

Transmission capacity TSOs provide confirmed capacity (ATC) to Elbas File transfer or manual input TSOs may at any point in time change capacities input to Elbas, if so required due to grid circumstances TSOs have direct access to Elbas for this purpose, real-time Elbas trading is firm Change of capacity does not cancel Elbas trades that have already been concluded

Trading scheme 12-gate nomination scheme Trading scheme: Nomination gate closure every 2 hours Trading scheme: XB trading (competition between BE and NL orders) will be possible: Until 1:30 before real time for “even hours” Until 2:30 before real time for “uneven hours” Belpex/BE trading closes 5minutes before real time APX/NL trading closes 90 minutes before real time Continuous trading, no hindrance from “underlying” gate system

12-gate nomination scheme

Transparency Transmission capacities and market data (anonymous) can be accessed via the web In addition to customer reports (own orders and trades), traders can access detailed anonymous market information via Elbas, such as: Price information and market depth Transmission capacities Trade ticker All in real-time Furthermore, APX-ENDEX / Belpex systems archive all individual trade data, which can be accessed by participant via existing facilities and protocols

Elbas price information window

Elbas market depth In the Order Depth -window participants can observe bids and offers in the selected Elbas-area by Instrument Bid = buy bid Ask = sell offer Bqty = volume of the bid Aqty = volume of the offer

Cross-PX settlement link Local markets are settled as per existing clearing and settlement arrangements Daily settlement APXSHIP buys power in exporting Hub, and sells power at the same price in the importing Hub Single clearing house (APX-Endex) Daily settlement as per standard timings Physical fulfillment as per standard balancing arrangements APXSHIP becomes balance responsible for this specific purpose i.e. full segregation from normal business APXSHIP delivers power to the importing PX-BRP (either APX-Endex Clearing in NL, or Belpex in BE)

Physical fulfillment This example illustrates the scenario where there is a flow from BE to NL

Physical fulfillment This example illustrates the scenario where there is a flow from NL to BE

Enduring Solution

Target solution Requirements for NWE enduring IDXB solution are currently elaborated, based on the AHAG target solution and the CWE orientation study Exchanges see 2 basic approaches Centralized or decentralized Detailed assessment to be done once enduring requirements become clear Interim solution does not hinder further development of the target model Technical: to be assessed, but developments will likely be needed Governance: enduring can build on interim XB shipping: easily extendible Scope: interim solution could cover substantial part of NWE region Strong commitment of APX, Belpex and Nord Pool to work with TSOs and other Exchanges to establish the enduring CWE-Nordic solution

Target solution compatibility ELBAS as a market model Excellent basis for the target model, as most of its features are at the root of the target model (e.g. continuous trading and implicit capacity allocation, real-time direct TSO control) Nevertheless, some changes could be performed in order to further improve the market model, such as: Market-based allocation in case of increase (decrease?) of capacity Enhanced treatment of block orders (automatic cross-matching of block and hourly products) Introduction of more sophisticated orders to replace OTC needs ELBAS as an IT System Excellent basis for the target model, as it exists, builds over 10 years of experience in XBID, accepted (and asked for) by the market Will necessitate technical changes/improvements in order to fully cope with the target market model design, once established

Target solution (centralized) operator(s) TSO operator(s) TSO operator(s) Capacity Matrix Optional: could be replaced by TSOs managing capacities directly in platform FCFS not a market-based mechanism Efficiency / response times? Non-discriminatory and equal access to be secured Capacity Matrix Platform operator(s) Matching Algorithm Shared Order Book 1 APX: NL market BPX: BE market NPS: Nordic, GE market Other market operator/OTC Other market operator/OTC Clearing/ Notification Systems (APX) Clearing/ Notification Systems (APX on behalf of BPX) Clearing/ Notification Systems (NPS)

Target solution (decentralized) Regional Capacity Matrix Regional Capacity Matrix Regional Capacity Matrix TSO operator(s) Capacity Matrix Slave Capacity Matrix Slave Cross matching of orders Platform operator(s) Matching Algorithm Matching Algorithm Shared Order Book 1 Shared Order Book 2 APX: NL market BPX: BE market NPS: Nordic, GE market Other market operator Other market operator Challenges: Liquidity split Complex implementation (cost) efficient? Cross matching of orders: consequences, free riding issues? Clearing/ Notification Systems (APX) Clearing/ Notification Systems (APX on behalf of BPX) Clearing/ Notification Systems (NPS)

Parallel path approach Interim path: Efficient solutions across large regions that can be achieved quickly and with minimal development effort, while bringing already significant improvements Enduring path: Clear/tangible engagement to (help) design and implement the CWE or European target model