FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG 6 - 4 July 2008 Jean-Philippe Paul - John Prime.

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
SWE IG Meeting Paris, CRE XBID Overview Supported by.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
2 nd IG-Meeting Preparation of the Coordinated Physical Transmission Right (PTR) Allocation Scheme for the CEE – Region Vienna
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
Balancing Update Stakeholder Group Meeting - 4 November 2009.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
EURELECTRIC vision on market development – what can the industry provide to accelerate market development? Peter ŠTULC Chairman of EURELECTRIC TF flow-based.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
3rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland Electricity REM Roundup and next steps David Halldearn – Head of European Electricity Policy,
France-UK-Ireland Region 1 February 2007 Written Consultation – Overview of Responses Shaun Kent – Head of European Electricity Policy, Ofgem.
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
ERGEG Public Hearing Brussels, 6 July 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Progress with coupling FUI and CWE region
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Italy-France Cross-border Intraday: Technical feasibility study CSE SG Group meeting Rome, 15 May 2012.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Jan Müller Bundesnetzagentur ERI Central.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Update on Coordination of long term auctions in the FUI region FUI IG, London, 13 th September.
Feedback on the SWE coupling Public Consultation Imeplementation Group meeting – 7th april 2014.
Draft document – Work in progress
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
The information in this presentation has been collated by ELEXON and while all due care has been taken to ensure the accuracy of this information, ELEXON.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
Cross Border Balancing - 2Hr Product NGET and RTE Paper.
INTRA-DAY TRADING Modification Development 5 April 2011.
FUI Stakeholder Group 4 th July 2008 Congestion Management.
FUI Stakeholder Group 3rd December 2008 Congestion Management project.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG December 2008 John Prime - Claude Perret.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
1 Identification of the needs to modify auction rules in the FUI region Congestion management meeting – 11 January 2007.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
Update on IFA Actions Congestion Management Guideline Workshop Thursday 11 th January, CRE Offices, Paris Simon McVeigh, IFA Manager, National Grid Interconnectors.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Cross Border TSO Balancing Procurement - a Generator/Trader Perspective Malcolm Taylor Head of Electricity Trading Association of Electricity Producers.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
1 Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15 th May 2012.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
European Developments Transmission Workgroup 3 rd May 2012.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
SEM & Target Model Update 22 nd FUI Implementation Group Meeting London, 30 September 2011.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15th May 2012.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
Long-Term Auctions & Capacity FUI Coordination Proposals
IFA Market Coupling Update
ETSO Comments on the draft Congestion Management Guidelines
Regulators’ update on Congestion Management and Balancing
SG meeting FR/UK/IR region 14 June 2007 Congestion management
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Update on European Network Codes
Interconnector trading in SEM 7th June 2007
Presentation transcript:

FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG July 2008 Jean-Philippe Paul - John Prime

Summary  NGET-RTE proposal : main aspects  ERGEG Consultation conclusions  Interim solution : state of progress  Enduring solution : perspectives

Process 23:00 All times approximate GMT D-1 D Y-1/M-1 Start 07:45 01:00 23:00 IFA Contract Day Secondary Mechanisms Re-Alloc’n/Assign’t 06:00 LT Transfer Nomination New Reciprocal Balancing Arrangements NGET and RTE formulate balancing offers in D+xh timescales, only after all commercial intraday nominations have been completed following the respective Interconnector Intraday gate closure (Day Ahead Nomination) UIoSI rule implemented for unused LT capacity 03:0005:0007:0009:0011:0013:0019:0021:0017:0015:00 XX:00 13:00 UIoLI rule implemented for unused DA capacity XX:00 * 12 Intraday Gates illustrated See next slide etc Rolling hourly pricing of SO-SO balancing offers for service delivery at x+1h. Offered prices based on those in the deliverer’s domestic BM. User capacity rights and volumes unaffected

Timing Illustration 04:00 05:00 06:0007:00 08:00 Interconnector Intraday gate closure Period of activation Delivery period BM Services can only utilise unused and available interconnector capability following each intraday gate closure. TPA capacity allocation mechanisms in all timescales not impacted by balancing service actions. Formulation of balancing services offers Publication of prices

Activities Pre Gate Closure: Normal TPA access arrangements TSOs may NOT reserve IFA capacity At Gate Closure (H-1 intraday): Market participants submit final notifications, nominations and BM bids/offers Participants may no longer trade over the IFA TSOs calculate residual IFA capability Post Gate Closure: TSOs calculate and exchange inter-TSO balancing bids/offers TSO bids/offers are published TSOs notify bid/offer acceptances Delivery of accepted volumes Details of TSO transactions are published

Pricing and Volume Principles  Prices submitted close to GB Gate Closure  Prices Curve  Different prices for different tranches of volume  Prices will be cost-reflective and will reflect forecast conditions in real time  Market Imbalance  Bid and Offer prices available in BM  Transmission constraints  Volume will initially be limited to 500MW  To be reviewed after a suitable period of operation (initially proposed as 1 year)

Interim (Hybrid) Solution  Manual work-around based on current BASA  Significantly increased functionality  TSOs exchange 6 prices at day-ahead stage  Price windows correspond to current intra-day gate closure in French market (subject to availability of IFA capacity)  National Grid will have ability to re-submit prices intra-day  Price exchange and acceptance based on present arrangements  Implementation targeted for August 2008

Summary – Enduring Solution  “Real Time” Balancing, after IC Gate Closure  Hourly prices, set 1-hour before delivery  Price Curve – prices in 100 MW tranches  Prices influenced by anticipated real time energy and transmission issues  Volume - initially maintain current 500 MW cap  Implementation targeted for July 2009

ERGEG Consultation  Consultation Oct 2007 – 20 Nov 2007  Comments by :  EirGrid,  Moyle,  EDF,  EURELECTRIC,  EDF Energy  Centrica  Regulators conclusions published 15 Apr 2008

ERGEG Consultation  Conclusions set up by regulators  TSOs’ proposal allows reciprocal access to BMs, with benefits identified as opportunities, competition, imbalance price reduction, preserved security  First step towards greater integration  Proposal broadly welcomed in responses  Follow-up on main remarks :  Reduce tranche size to 50 MW  Differences between impacts on imbalance price result from different market arrangements and do not have to be suppressed; TSOs proposal validated  500 MW cap is a sensible approach  Remuneration of interconnector operators for use of infrastructure needs to be considered

Interim solution : state of progress  After the regulators’ approval of the proposal  RTE and NGET launched “BALIT Project”  Acronym for “Balancing Inter TSO”  First : they launched the requested tasks to set up the Interim solution  1- Evolution of the operational process  2- IT evolutions  3- BASA contract evolution  Tasks 1 and 2 are complete, 3 in progress.  TSO preparations on target for Sep-08 commencement

Interim solution : state of progress  But a difficulty appeared quite lately :  Some of the French BM Rules do not authorise to set up the solution  There is no practical solution to authorise NGET to formulate bids on the French BM  After in-depth analysis by Regulators and TSOs, the conclusion is that the unique solution is to modify Rules  A process of Rule modifications (covering BALIT and many other questions) is engaged since May 2008  Target : New Rules should be approved Jan 2009  >> The Interim solution will start after new French BM Rules approval by CRE  NB : these new Rules will be convenient also for Enduring solution

Enduring solution : perspectives  NGET and RTE have started preliminary studies  Technical solution for information exchanges  Operational process  Still in progress  Enhanced planning should be available in Nov 2008