Levolors New Size-In-Store Blind Cutting Machine.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

The following photo essay shows a 2011 Hyundai Equus Sedan being transformed from a running passenger car into a specialized platform used for photographing.
Using a Sewing Machine Fashion and Interior Design Page
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Replacing Handbrake cables Using axle stands This show changes pages itself,
1.Cable management cover ( cpu only ) 2.Wired barcode scanner holder (optional) 3.Mouse holder and tray 4. Removable rear technology panel 5. Power cord.
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Rescue 42.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Workshop Safety Lee McNeil, mentor of the Skagit Valley (WA) SeaTech 4-H ROV teams, developed the following placards, which he attaches to the tools in.
Installing a double Dreamscreen. Check measurement Left.
Optical Manufacturing Solutions 1 Probe Assembly.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Click on this image to open the full PDF document.
GLOBAL LIFT CORP COMMERCIAL SERIES PORTABLE KIT Portable Kit -
Installation Quick Guide AD400 Cylindrical 6/01/13 Doc #
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
Yamaha oil pump rebuild
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
MyLock 644D Service Seminar.
Kit includes: New Sprocket New Upper Bracket New Stickers New Ground Wires Toaster Speed Conversion Kit.
Cooling Business Group 1 INSTALLATION Directions.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
Disabled Platform Access There are two designated parking bays immediately outside the front of the main college building. Disabled access both into the.
Steering Columns.
The Raven Level 2 Rubber Band-Powered Flight. Dimensions 2”
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Handy Store Fixtures Gondola Dolly Assembly Instructions
Building a Computer Kate Chapin Capstone Project.
Service Seminar Model MB4.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
LAUNCHER BASE PARTS B A D E F C G. LAUNCHER BASE PARTS B A D E F C G.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
Installation. Indoor Unit Installation Typical Installation.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Setting up the Ricoh C305 Press F5 to start the Presentation
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
Set Up for Live Streaming Video This presentation will walk you through the set up and delivery for streaming video of a live event over the internet.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Wood Construction CTC-375.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
2000 Chevy S-10 Left Suicide Door Install Instructions 1.Remove seat (4 anchor bolts.) 2.Remove tracks from seat. To access the nut shown in pic 1, pry.
Port Throttle Solution Does your port throttle drop back when you remove your hand. Here is the fix….and it costs nothing! me with any questions:
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Chapter 23 Interior Repairs. Objectives Identify the major parts of a vehicle’s interior Remove and replace seats, seat covers, and carpeting Service.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
To install the four wires from the back of the coil machine, loosen the four knobs. Keep each wire in center under each knob, off to the side will allow.
VIEW SERIES with Sliding Door
PostBase Automatic Feeder Component Removal Service Training
Servicing the Suspension System
MODEL: WC SWEEPER SCRUBBER DOCUMENTED BY: Brett Sprietler PAGE NUMBER: 1 DATE: 11/20/ Place (1) HOSE IMPELLER TO TANK ( )
Easy Reach 7.0 Honda Element 2003
Easy Reach 7.0 Honda Element 2003
T400 Motor Replacement.
6. Disassembly & Reassembly
Front panel wiring PICO 155
MASATS Door Systems.
Dust Extractor The dust extractor should always be turned on before cutting any piece of wood. It can be turned on using the green button on the switchboard.
Removal of salon doors on 1968 Roamer Sedan.
Highland Sportsman Club Skeet & Trap Opening – Closing Instructions
Reader Swap out Guide.
Beginner Stander Presentation
Fix your Fireplace SYM-B Series.
Presentation transcript:

Levolors New Size-In-Store Blind Cutting Machine

Preparing for Shipment These first photos show front and rear of the machine before the vertical corner posts of the new pallet are laid down and the machine is shrink-wrapped.

Machine Connections to Pallet Here you see that the machine rides in tracks with a chock block welded to the rear, and a removable screw is inserted at the front. The machines frame is bolted to a swivel bracket in front, and the side wings are bolted to the pallet on both sides.

GEN II Dressed for Travel As stated earlier, the machine itself is shrink-wrapped, the pallet corner posts are raised and locked into position, and the pallet is then shrink-wrapped to give the machine a double barrier of protection. This is what CPS Technicians will see upon arrival to the machines new home.

Preparing for Uncrating Once the shrink-wrap is carefully removed, and the screws are removed securing the Super Slider, the slider is set aside. The screws securing the wings to the machine, the bolts securing them to the pallet are removed, and the wings are set aside. The Machine Bolt & Nut are removed, the Pallet Screw is loosened, the brace is turned to horizontal, and the screw is retightened. The Front Wheel Stop Screw is removed, and the machine is now ready to be lifted from its pallet.

The Helpful Changes The Back Panel has been split in two, and hand holes installed to greatly ease removal for accessing the rear of the machine. The right photo also shows a Back Plate covering the hole that gives more room to adjust the Left Saw Belt. It also shows that the wiring is now sheathed to give better protection to the wiring, and it presents a neater appearance.

Helpful Changes – page 2 The travel of the Shuttle is now restricted by Stop Blocks left and right. On both sides of the machine are Stop Pins that the Lowes Associates will pull out to prevent the machine from being pushed back into the bay while closing the drawer, and while cutting Vertical Vanes & Headrails that protrude out of the right end of the machine via the Vertical Door.

Helpful Changes – page 3 The Trash Doors are now guarded with a Power-To-Lock Safety Interlock Switch. With power off, the doors can be opened. And to the right, the upper supports for the Super Slider are now Gas Shocks with a hard plastic ball for the upper track.

Helpful Changes – page 4 To replace the non-unbreakable Plastic Clips securing the Front Center Panel, you will now find a length of angle attached to the bottom framework, and a lip attached to the inside of the Panel. No more clips to break, immediately followed by toes to smash!!!

Helpful Changes – page 5 The Machine Top has been strongly reinforced to prevent sagging, creating difficulty in opening and closing the Drawer. Also, the top has been redesigned to prevent abrasion to the Shuttle components – Wire Way, Hoses, Cables, etc.

Helpful Changes – page 6 Proximity Sensors on Vertical Door. Redesigned Vacuum Hose Tube. Redesigned Interior Drawer Area.

Shipping The Phase Machines With the Machine Front Brace secured in the Horizontal position (as opposed the to Vertical shown), the Phase Machine will be placed on the Pallet, shrink- wrapped (CPS Supplied), and banded to the Tie Down Anchor with a 3/16 or ¼ S Hook to prevent the banding from breakage, or secured with Tie Down Straps with Hooks.

Compact Power Services Levolor REI automation Wish to thank all the CPS Techs, Internal Support Team, and DSMs who have provided not only the maintenance to the first 32 proto-types, but also thank you for your assistance and feedback to help create this New Revised Edition. And… Thank you in advance for our continued future success. Thank you in advance for our continued future success.