15 th November 2013 20 th SG meeting 2013 VIP Auction Results.

Slides:



Advertisements
Similar presentations
1 June 22, 2010 Sheila Gropp True-Up Update June 15, 2010 Posting Formula Rate Customer Meeting.
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
A Spanish Technology Platform for Sustainable Chemistry SusChem-ES: An example of a National Technology Platform for Sustainable Chemistry. Mª Eugenia.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Algebraic Expressions
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
C1 Sequences and series. Write down the first 4 terms of the sequence u n+1 =u n +6, u 1 =6 6, 12, 18, 24.
SOLVING EQUATIONS AND EXPANDING BRACKETS
ZMQS ZMQS
MISO Southern Region Integration – ARR/FTR Timeline FTR WG February 6,
Richmond House, Liverpool (1) 26 th January 2004.
1 of Audience Survey Results Larry D. Gustke, Ph.D. – October 5, 2013.
July 11, 2013July 18, 2013July 25, 2013August 1, 2013 August 8, 2013August 16, 2013August 29, 2013September 5, 2013 September.
ABC Technology Project
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
PRELIMINAR ASSESSMENT OF CAPACITY OFFER In March and June th IG meeting 23 th January 2013.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
VOORBLAD.
South Region LNG market changes and cross border flows SGRI – 15th November 2013.
15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Volkshochschule Olching e.V. Grundtvig Learning Partnership VOICES IN PICTURES VIP Project Nr DE2-GRU
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
15 th September 2013 Enagás and TIGF Information to NRAs.
Madrid, 19 th November 2012 Roadmap implementation CAM 20 th IG meeting.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
2013 Auction between Spain and Portugal 23 rd IG meeting 19 th June 2013.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
GRI South SG Meeting 15 November /11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…
Addition 1’s to 20.
25 seconds left…...
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
1 Madrid, 19 th November th IG Meeting South Gas Regional Initiative.
PILOT PROJECT ON CAM 17 th SG meeting Madrid 27 th September 2012.
1 Madrid, 27 th February st IG Meeting South Gas Regional Initiative.
PILOT PROJECT FOR CAM HARMONISATION 16 th SG meeting Madrid 31 st May 2012.
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
1 Madrid, 30 th April th SG Meeting South Gas Regional Initiative.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
Figure Essential Cell Biology (© Garland Science 2010)
1 Unit 1 Kinematics Chapter 1 Day
Fourth Quarter Oklahoma Data (October-December 2011)
Weekly Attendance by Class w/e 6 th September 2013.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
Enagás, GRTgaz, REN and TIGF
Presentation transcript:

15 th November th SG meeting 2013 VIP Auction Results

2 VIP – Auction Process  Auction Calendar  Pre-qualification phase: 3 rd – 12 th June  Annual yearly capacity auction process: 13 th June – 2 nd July  Annual quarterly capacity auction process: 3 rd – 19 th July  Interruptible capacity auction process: 22 nd – 25 th July (only if total firm capacity was previously allocated)  Total Capacity Offered VIP 2013 between Portugal-Spain

3 VIP – Auction Results  Number of pre-qualified shippers: 5  Yearly Capacity Auctions  Number of auction participants: 1  Total capacity allocated: 1 GWh (Spain -> Portugal)  Quarterly Capacity Auctions  Number of auction participants: 0  Total capacity allocated: 0 GWh  Interruptible Capacity Auctions  No auctions were started

15 th November th SG meeting Thank you for your attention