“Market coupling on the Italian border: results and lessons from the Italy-Slovenia coupling, update on the PCR project” Electricity Regional Initiative.

Slides:



Advertisements
Similar presentations
4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Advertisements

European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Vision for the internal electricity market
Regional TVs lower CPM guarantees higher advertising ROI – 2-3 times higher Index TV market CPM indices National average CPM P18+ = 100 Source: Regional.
By Martín Gesualdi, Tecnolatina S.A, Suipacha 1111, Buenos Aires, Argentine, Phone/Fax ,
CASC.EU S.A. CASC.EU – Capacity Allocation Service Company
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
RFF RGGI Auction Workshop July 20, Stakeholder Views Market Dynamics Auction Views Summary
Assessment of differences in market designs in the CS region Milan 18 July 2008.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
Name Surname Milan, November 2010 European Federation of Energy Traders 1 The Central South Region and the European Target Model – How to ensure consistency?
Do EU budgetary policies induce convergence of national health systems? Dr. Patrick Jeurissen Chief Strategy Group Ministry of Health, Welfare and Sport.
Fig 4.2 – ABARES farm performance (avg per farm) Agribusiness Breakfast Unilever Sustainable Sourcing Meeting 27 August 2012.
Kia Regional TV Market Update February RTM is the marketing bureau for Regional free to air TV.
Photonics Cluster South Korea/Gwangju Jeong Hyop Lee (STEPI, S. Korea) 1.
Regional Energy Markets Assistance Program Kazakhstan November 8-11, 2010.
The future of GB-Continent: Interconnection & Electricity Regional Initiative Simon McVeigh France-UK-Ireland Stakeholder Group meeting 4 th July 2008,
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Introduction of an Intraday market on the Italian borders for the year 2011 Terna proposal Electricity Regional Initiative – CSE Region 15th Implementation.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Italy-France Cross-border Intraday: Technical feasibility study CSE SG Group meeting Rome, 15 May 2012.
National Research Ethics Service Facilitating and promoting ethical research 1 October-December 2011 Proportionate Review Management Information.
European Federation of Energy Traders 1 8th SG meeting ERI South-West Europe 6 th October 2014, Madrid.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
SMi’s Italian PPP Forum Conference Rome, 25 September 2006 Radisson Hotel - Via Filippo Turati, 171 Improving Investment Prospects in Infrastructures and.
Italian – Slovenian Market Coupling CSE SG meeting 16 November 2010, Milan.
Regulatory Approaches to Managing Investment Uncertainty Gülefşan Demirbaş ICER VWG2 Co-Chair.
Electricity trading in emerging markets Vienna Economic Forum Tirana, Albania 8-9 June 08 1 EXAA 2008.
Copyright Houmoller Consulting © Hedging with FTRs and CCfDs Introduction ► This document discusses hedging with Financial Transmission Rights (FTRs) and.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
ITP10 Fuel Cost Determination April 19, 2011 ESWG Teleconference 2.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
CT Electricity Retail Market Commercial – Industrial Update 12/14/2010.
efficient capacity allocation method
148 Q: What are the other languages spoken in Italy? A: French, German, Ladino, Slovenian 147 Q: What are the most important Italian islands? A: TheSicily.
2 nd Mini-Forum for Central-Southern European Region EuroPEX Discussion Points Milan, 17 th of July 2006.
Economics The Business Cycle Unit 3, Lesson 2. What is the Business Cycle? The business cycle is a period of economic expansion followed by a period of.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Nord Pool Spot update 11th Baltic Electricity Market Mini-Forum October 01, 2010 Hando Sutter, Nord Pool Spot AS.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
Agenda Pag. 1 I.4M MC – Common parts II.Further Information on Romanian Market 1.Regulation for DAM organization and functioning with respect to price.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY Regulation of operation and organization of the electricity day-ahead market with the price market coupling mechanism.
Perfect Competition Many buyers & sellers (no individual has mkt power) Homogeneous product – no branding or differentiation Perfect information – consumers.
UltraTech Cement Q1 FY10 Result Update. Ultratech Q1 FY10 Q1 FY09% Change YOY Revenue EBITDA OP Mrgn 3225 Net profit
© GfK 2013 | Title of presentation | DD. Month Turnover FMCG + Fresh (mio €) GfK Belgian FMCG+Fresh Barometer – June 2013.
NO x Trading Success in the Northeast: Observations and Lessons Andrew Aulisi World Resources Institute RGGI Stakeholder Meeting February 16, 2005 New.
Power market structure and market price development in the SEE region
2nd Mini-Forum for Central West Electricity REM
Prof. Njuguna Ndung’u, CBS Governor, Central Bank of Kenya
BSP SouthPool En.trading 2017
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
ETSO main 2006 Issues for West-Central Europe Market Development
Q2/2017 Developments in European Solar Markets & Beyond
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Basin Electric SPP Market Update
efficient capacity allocation method
29th April 2014 Teleconference
Day-ahead market coupling
ERGEG Benchmarking report on long term transmission rights
Balancing Actions 2017 Update on
8th SG meeting ERI South-West Europe
BSP SouthPool En.trading 2016
. ..
Presentation transcript:

“Market coupling on the Italian border: results and lessons from the Italy-Slovenia coupling, update on the PCR project” Electricity Regional Initiative – Central South region 4th Stakeholder Group meeting Rome, May 15th 2012

The pilot project on the Italian – Slovenian border A fully decentralized approach

Market coupling outcomes since 1/1/2011 Traded volumes growth Strong liquidity growth on BSP and on the implict auctions Strong increase in volumes allocated through mkt coupling in addition to the reserved share (35 MW)

Market coupling outcomes since 1/1/2011 Price convergence Some increase in frequency of price convergence, considering an higher price difference in average during first four-month 2012 The rare occasions of negative price differentials (ITp<SLp) has become price indifference cases

Market coupling outcomes since 1/1/2011 Efficient capacity allocation In 2011 implicit auction guaranteed efficient allocation and occasional commercial export, while explicit auction always allocated in import. In 2012 explicit auction efficiently exported in 9% of hours of price indifference

Coupling with illiquid markets –The growth of traded volumes on BSP confirms mkt coupling scheme as a natural liquidity provider, which has the potentiality to make benefit to illiquid markets from X-border liquidity. The overall efficiency of capacity allocation are so guaranteed also in this case. 2.Short term flexibility –The growth of volumes allocated with respect to the quota reserved to mkt coupling and its peak in january, also due to the entry into force of new delivery contracts, evidences the preference of market participants for the flexibility granted by the daily implicit nomination scheme and the chance for them to efficiently use UIOSI clauses, as financial contracts to fix the price received. 3.Effectiveness also in wide price differential borders –The increase of the percentage of hours in which the X border prices converge is an expected beneficial outcome, with an outstanding 20% of hours with the same price during –Price differential rarely changes sign due to the small dimension of the slovenian DAM market, whose demand on the market is generally lower than import capacity. –Implicit auction allocates capacity in import much more frequently than explicit auction, especially in the hours of price convergence. Lessons learnt/1

The benefits of a decentralized solution –The governance and operational solution for the Italian Slovenian Border reflects the PCR decentralzied approach –This enabled a faster delivery of a reliable market coupling solution between two countries with different institutional and governance frameworks. 5.The need of a stable framework for post coupling arrangements –The benefits of market coupling calls for great market volumes, independently from the quota of capacity reserved to market coupling. This calls for stable and sustainable shipping arrangements between the involeved parties. Lessons learnt/2

PCR provides coupling solution for the EU market – Supported by all the European PXs through Europex – Accepted by ACER and EntsoE to support the start up of NWE coupling – Regularly presented and debated at the AESAG, Florence and NWE fora. PCR is a decentralized solution – In PCR one Coordinator PX runs the coupling algorithm, one Back-Up Coordinator PX provides hot back up service, both on a rotational basis. Other PCR PXs can run shadow auctions with same inputs and tools to check the validity of the results. – Each PX in the EU can decide wether to be: – a PCR party entering in the rotation for Coordinator/HorBackUp – a PCR party only running shadow auctions to validate its prices (PCR Operator) – a PCR party subcontracting its operational performance to another PCR Party – a serviced PX by a PCR member – Each PX is responsibile for its own DAM prices. The PCR project update General concepts

Algorithm – One single price coupling algorithm encompassing the features of NWE, Mibel, Italy- Slovenia and open to embody further EU requirements – Cosmos longely selected as starting point, validation from EntsoE expected – Development of a prototype, including MIC and PUN features, nearly concluded – Industrialization phase to start in May. System design – PBM (PCR Broker& Matcher) supports the decentralized coupling approach by collecting, validating and exchanging the inputs (bids, ATCs, PTDFs) and the outputs (p, q, net positions, flows). – Design phase finalized, provider selected and industrialization phase to start in May. Governance – Cooperation & Coownerhsip agreements nearly approved. – Agreements consistent with the EU Draft Governance Guidelines. The PCR project update PCR assets

Delivery of PCR assets and PX testing by september 2012, in order to go live on January This refers to coupling solution, as provided by PCR. To couple, pre/post coupling arrangements must bealso agreed, either on a border by border basis or based on common agreed regional approach. Integration Test for Regional Initiatives will start on 1st October 2012, to be ready to go live by Januray –They will include the TSOs. –Finalization of pre/post coupling arrangements required. –GME will take part only for the technical test, as Italy will not be coupled by such date. The PCR project update State of advancement