Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008.

Slides:



Advertisements
Similar presentations
Hamid Dom Reg WS March 04 1 INTRODUCTION THE GATS and DOMESTIC REGULATION.
Advertisements

1 FIFA RULES GOVERNING THE PRACTICE AND PROCEDURES OF THE DISPUTE RESOLUTION CHAMBER by Michele Colucci –
Proposal for a Directive of the EP and Council on credit agreements relating to residential property Mr. Gabriel Alonso, ELRA Secretary General.
SWE IG Meeting Paris, CRE XBID Overview Supported by.
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
14 april GRI NW Role of TSOs within the GRI.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
GRI South SG Meeting 15 November /11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…
Gas Regional Initiative – North West Region The Hague 13 December 2007 Day Ahead On x-borders of 2008 Presentation to the RCC.
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
Italy-France Cross-border Intraday: Technical feasibility study CSE SG Group meeting Rome, 15 May 2012.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Gas Regional Initiative - Region North / North-West Stakeholders Group Meeting The Hague, October 9th, 2006.
Draft document – Work in progress
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting.
EFET comments on obstacles to trading November 2007 Obstacles to Electricity Trading in Central & Eastern Europe – latest development.
26 November th Stakeholder Group Meeting of the Gas Regional Initiative North-West (GRI NW) Brussels, 26 November 2010 Mark Hobbelink Wiekens, GTS.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
GRI - SSE Workshop on system access Vienna, EFET SSE © Copyright 2006 EFET European Federation of Energy Traders 1.
Bonn Workshops 8 and 9 Feb Balancing workstream.
1 Day Ahead Auctions Making progress, Jour Fixe Day Ahead Auctions pilot 14 th of September 2007 Jour Fixe The Hague Conclusions and homework Chair DTe.
Gas Regional Initiative – North West Region Governmental Meeting 6 May 2010 – The Hague Secondary capacity markets Project update Betsy ANNEN – CRE Bernhard.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Lars Kjølbye, Head of Unit, DG COMP B-1 22 February 2007 Competition Directorate -General The Energy Sector Inquiry Identified problems and future action.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
6th Stakeholder Group meeting Stockholm – 26 November 2009 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer,
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
© 2007Slide 1 Solution Outline for Day-ahead Capacity Trading at Interconnection Points Marco Wettig Dublin, April 24th 2007.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
Gas Regional Initiative – North West Region RCC meeting The Hague – 5 th July, 2010 Secondary capacity markets Project update.
Congestion Management
GRI North-West Meeting
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
2009 TSO Transparency Gas Regional Initiative North-West
Regulators’ update on Congestion Management and Balancing
ERGEG GRI – N/NW Region Stakeholder Group Meeting
GRI North-West Meeting
Draft document – Work in progress
Transparency Project GRI NW Region.
Gas balancing – where next
GRI North-West Meeting
Assignment of NTS Entry Capacity – Background and UNC Obligations
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
Presentation transcript:

Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008

2 Contents Background and general objectives What we asked for…and what we got! Where are we now? Legal bottlenecks Regional framework / conclusions Where from here

3 Background and objectives Two quotes from the Sector Inquiry: −“Suppliers need to have transparent and non-discriminatory access to the transportation network on terms matching customer needs (This can include, for example, short term capacity on the secondary market, reasonable liabilities, etc.).” −“Depending on market circumstances, long-term contracts can result in foreclosure. This is particularly the case where they lead to a good part of customers or an available input such as transport capacity being tied to a dominant player.” Access to capacity is essential! Pilot was to test a number of objectives: −TSOs / Network users to gain experience of the impact of smaller amounts of capacity being available then can extend −Trial of auctions as delivery and price setting mechanism −Trial of locations, to test for roll-out −Trial delivery periods −Identify and breakdown artificial contractual barriers −Support initiatives by liquidity providers such as E.On Choice Market Access to capacity is also essential for hub trading / risk management ! A goal without a plan is just a wish.

4 What we asked for… …and what we got Daily auctioning Jointly organised Secondary firm capacity Primary interruptible capacity Cross border or linked 3 interconnection points Simple solution / common platform Starting 1 April 2007 Daily product Continuous trading Secondary firm capacity tradable once in theory No interruptible / competing interruptible product (EUCABO) 1 interconnection point Two platforms – solutions on either side of border May 2008

5 Where are we now Dutch side Limited trades of GTS capacity on APX Non-watertight contracts for Dutch capacity trades, but some players prepared to accept the risks for the sake of the pilot APX up and running; agreement reached with trac-x German side Ongoing lack of definition on German capacity trading “ueberlassung” Capacity overrun charges remain with primary holder – though calculation unclear Product not possible to contract in acceptable fashion Choice market is still running, for small volumes with no impact on market Legal bottlenecks identified Basis swaps continuing General Some remaining operational issues being addressed (gate closure, fees, re-tradability) Danish side No legal bottlenecks Ellund addition Progress might have been all right once, but it has gone on too long. (Ogden Nash)

6 Legal bottlenecks IssuePriorityOutlook Dutch FCFSNot fatal Methodebesluit in discussion, but is this on the agenda? German FCFSNot fatalWill this be addressed? German prices Ex post solution proposed Pragmatic. Support the proposal. German platformNot helpful Clarify European law. Proposal to embed is not realistic. German tradability KoV restricts rights allowed by NZV Must be addressed What you see as a glass ceiling, I see as a protective barrier.

7 Secondary Capacity Trading KoV II Article 38 Secondary Trading 1. Subject to Sections 2 and 3 of this Article 38, the shipper shall be entitled to sublet or assign acquired capacities to a third party. Section 14 of the Gas Network Access Ordinance (GasNZV) shall remain unaffected. 2. The shipper shall be entitled to sublet capacity booked under an entry and/or exit contract without the network operator's consent. In such case, the shipper shall remain liable to the network operator for the performance of its obligations under the entry and/or exit contract including, without limitation, the obligation to pay fees. 3. The shipper shall be entitled to assign the entry and/or exit contract wholly to a third party subject to the network operator's consent. Such consent shall not be withheld except for reasonable cause. Without limitation of the generality of the foregoing, failure by the third party concerned to demonstrate its creditworthiness in accordance with Article 45 or to provide the security required shall constitute reasonable cause for the network operator to withhold such consent. Such assignment shall not be effective as against the network operator until expiry of 10 (ten) days after the granting of consent in accordance with the first sentence of this Section 3 or notification in accordance with the first sentence of Section 2 of Article The network operator shall provide a bulletin board and ensure that the capacity rights bookable with the network operator can be traded on a joint electronic trading platform. The first sentence of this Section 4 shall not apply to local distribution network operators (1st sentence of Section 8(1) of the Gas Network Access Ordinance (GasNZV)).

8 Secondary Capacity Trading Suggested Changes Article 38 Secondary Trading 1. Subject to Sections 2 and 3 of this Article 38, the shipper shall be entitled to sublet or assign acquired capacities to a third party. Section 14 of the Gas Network Access Ordinance (GasNZV) shall remain unaffected. 2. The shipper shall be entitled to sublet capacity booked under an entry and/or exit contract without the network operator's consent. In such case, the shipper shall remain liable to the network operator for the performance of its obligations under the entry and/or exit contract including, without limitation, the obligation to pay fees. 3. The shipper shall be entitled to assign the entry and/or exit contract wholly to a third party subject to the network operator's consent. Such consent shall not be withheld except for reasonable cause. Without limitation of the generality of the foregoing, failure by the third party concerned to demonstrate its creditworthiness in accordance with Article 45 or to provide the security required shall constitute reasonable cause for the network operator to withhold such consent. Such assignment shall not be effective as against the network operator until expiry of 10 (ten) days after the granting of consent in accordance with the first sentence of this Section 3 or notification in accordance with the first sentence of Section 2 of Article The network operator shall provide a bulletin board and ensure that the capacity rights bookable with the network operator can be traded on a joint electronic trading platform. The first sentence of this Section 4 shall not apply to local distribution network operators (1st sentence of Section 8(1) of the Gas Network Access Ordinance (GasNZV)). (other than penalties for overrunning the transferred capacity which shall be paid by the shipper acquiring the capacity). Any capacity so transferred shall be included in the balancing group contract of the shipper acquiring the capacity for the duration of the transfer period within [ ] working days of notification of the transfer to the network operator by the shippers. If the entry and/or exit contract from which the capacity is transferred is terminated before the end of the transfer period then [the capacity shall remain in the balancing group contract of the acquiring shipper and the acquiring shipper shall become liable to the network operator for the performance of all obligations in respect of the transferred capacity including, without limitation, the obligation to pay fees.] transfer transfer any for all or part of the remaining term of such capacity all or part of the capacity in any

9 Secondary Capacity Trading KoV III Article 43 Secondary Trading 1. Subject to Sections 2 and 3 of this Article 38, the shipper shall be entitled to sublet or assign acquired capacities to a third party. Section 14 of the Gas Network Access Ordinance (GasNZV) shall remain unaffected. 2. The shipper shall be entitled to sublet capacity (with or without nomination rights) booked under an entry and/or exit contract without the network operator's consent. In such case, the shipper shall remain liable to the network operator for the performance of its obligations under the entry and/or exit contract including, without limitation, the obligation to pay fees. 3. The shipper shall be entitled to assign the entry and/or exit contract wholly to a third party subject to the network operator's consent. Such consent shall not be withheld except for reasons that would have prevented the conclusion of an entry and/or exit contract with the third party in the first place. Without limitation of the generality of the foregoing, failure by the third party concerned to demonstrate its creditworthiness in accordance with Article 50 or to provide the security required shall constitute reasonable cause for the network operator to withhold such consent. Such assignment shall not be effective as against the network operator until expiry of 10 (ten) days after the granting of consent in accordance with the first sentence of this Section 3 or notification in accordance with the first sentence of Section 2 of Article The network operator shall provide a bulletin board and ensure that the capacity rights bookable with the network operator can be traded on a joint electronic trading platform. The first sentence of this Section 4 shall not apply to local distribution network operators (1st sentence of Section 8(1) of the Gas Network Access Ordinance (GasNZV)).

10 Regional framework / conclusions Transparency Capacity availability Hub liquidity New capacity Capacity reallocation TSO incentives

11 Learnings for Capsquare? Platform should be optional OTC trades of gas with capacity should not be mandatorily separated Capacity trade registration is “ordinarily required” Introduction of a fee will encourage more basis swaps Imposition of a single platform contravenes European law. Priority should be to sort out other confusing issues (units, transport service conditions, fee clarity)

12 Where from here Review of platform success Extension sought while we look at other issues around gate closure, fees, onward tradability – where some progress has been made. Will this make the pilot successful? Will this lead to a solution which will help address the capacity problem? Will this help the regional convergence process? Convergence of capacity service at regional level Application of EASEE-Gas capacity trading CBP on uniform basis Clear terms in network access conditions

End For alternative section dividers with images, please see the BP images where you can copy and paste a pre-set section divider slide (see BP templates in PowerPoint menu: File / New or