Interoperability problems between portuguese and spanish systems Long term interoperability PLAN TO SOLVE 5th IG meeting of South Gas Regional Initiative.

Slides:



Advertisements
Similar presentations
GAS EXCHANGES IN SPAIN 5th IG Meeting of South Gas Regional Initiative 30th November, 2007.
Advertisements

African Network Information centre March 2 nd, 2007 © AfriNIC AfriNIC Update Adiel A. Akplogan CEO, AfriNIC LACNIC-X Isla Margarita, May 2007.
20th APNIC Open Policy Meeting SIG: DB Thursday 8 September 2005 Hanoi, Vietnam Chair: Xing Li.
NANC Future of Numbering (FoN) Working Group April 17, 2007 Tri-Chairs James Castagna, Verizon Don Gray, Nebraska PSC.
NANC Report Future of Numbering Working Group FoN Co-Chairs Jim Castagna, Verizon Don Gray, Nebraska PSC Adam Newman, Telcordia Technologies October 15,
SEWG Gas Balance 2007 © Matej Mayer First results on deuterium depth profiling in W tiles M. Mayer 1, V.Kh. Alimov, V. Rohde 1, J. Roth 1, A. Herrmann.
Figure 1. Problems with Medical Bills or Accrued Medical Debt Increased, 2005–2007 Note: Income refers to annual income. In 2005 and 2007, low income is.
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Network Integration Transmission Service (NITS) EC Single Topic Review January 24, 2012.
Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
EASEE-gas 20/10/2003 EASEE-gas Peter Taff (centrica) GTE Conference 22/23 October 2003.
Shell Energy Europe Copyright: Shell Energy Europe B.V. What do we do in the GRI NW during the interim phase? GRI NW Region Conference, The Hague, The.
Regional Initiatives – ACER Perspectives Steve Gordon Head Of the Gas Department Madrid Forum, September 2011.
XVII Madrid Forum January 2010 ERGEG Gas Regional Initiatives P rogress and future work Peter Plug NMa, Director.
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
Presentation of the ERGEG Electricity Regional Initiative. South West Electricity Regional Energy Market 1st Implementation Group Meeting Madrid, 20th.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
EU Developments Transmission Workgroup 6th October 2011.
1 Madrid, 19 th November th IG Meeting South Gas Regional Initiative.
1 Madrid, 07 th February th SG Meeting South Gas Regional Initiative.
Name ____________________ Date ___________ Period ____.
Change Requirements: An Explanation of What Stakeholders Try to Avoid and What They Try to Achieve Johan F. Hoorn, Elly A. Konijn, H. van Vliet, & G. vd.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Paris, 18th May nd RCC Meeting South Gas Regional Initiative.
1 Brussels, 27 th February th GRI Coordination Group South Gas Regional Initiative.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
Madrid, 11th February th IG Meeting South Gas Regional Initiative.
XV Madrid Forum, 6-7 November 2008 Gas Regional Initiative Progress and challenges.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.
Bjørn W Melaa Excom Vice Chairman The Gas Regional Initiatives and the CBP "working towards a standardised European gas network"
Madrid Forum, 17 October 2007 Gas Regional Initiative Coherence and Convergence.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Madrid, 21 st May 2008 MIBGAS Background 2. “Plan to reconcile the energy sector regulation between Spain and Portugal” 3. Conclusions INDEX.
1 World Regions. 1 Southeast Asia 2 World Regions.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
European Developments Transmission Workgroup 1 st December 2011.
Maribor, October 9, 2007 Implementation of EASEE-gas’ rules Or …Working towards a functioning European gas network European Association for the Streamlining.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
Gas Regional Initiative South South-East
20th April 2016 Teleconference
Gas Regional Initiative South South-East CAM Implementation Group
4th October 2016 Teleconference
20th April 2016 Teleconference
Solve: 1. 4<
20th April 2016 Teleconference
29th April 2014 Teleconference
4th October 2016 Teleconference
39th IG meeting 4th October 2016
Enagás, GRTgaz, REN and TIGF
Gas Regional Initiative South South-East
Gas Regional Initiative South South-East CAM Implementation Group
World Regions.
Gas Regional Initiative South South-East
Presentation transcript:

Interoperability problems between portuguese and spanish systems Long term interoperability PLAN TO SOLVE 5th IG meeting of South Gas Regional Initiative (S-GRI) 30 th November, 2007 Madrid

1 ITEM # 1: INTERCONNECTION AGREEMENT CPB /01 Interoperability problems between Portuguese and Spanish systems Long term interoperability 5th IG meeting of South Gas Regional Initiative (S-GRI) 30 th November, 2007 Madrid

2 ITEM #2: HARMONISATION OF THE NOMINATION AND MATCHING PROCESS CPB /01 Interoperability problems between Portuguese and Spanish systems Long term interoperability 5th IG meeting of South Gas Regional Initiative (S-GRI) 30 th November, 2007 Madrid

3 ITEM #3: CONSTRAINTS CPB /01 5th IG meeting of South Gas Regional Initiative (S-GRI) 30 th November, 2007 Madrid Interoperability problems between Portuguese and Spanish systems Long term interoperability

4 ITEM #4: HARMONISATION ON GAS QUALITY CPB /01 Interoperability problems between Portuguese and Spanish systems Long term interoperability 5th IG meeting of South Gas Regional Initiative (S-GRI) 30 th November, 2007 Madrid

5 ITEM #5: HARMONISATION ON UNITS CPB /01 Interoperability problems between Portuguese and Spanish systems Long term interoperability 5th IG meeting of South Gas Regional Initiative (S-GRI) 30 th November, 2007 Madrid

6 ITEM #6: MESSAGE PROTOCOLE- COMPANY’S IDENTIFIER ENCODING CPB /01 CPB /01 CPB /01 Interoperability problems between Portuguese and Spanish systems Long term interoperability 5th IG meeting of South Gas Regional Initiative (S-GRI) 30 th November, 2007 Madrid