Changes to the WI Platting Law May 30,. 2014WSLS Spring Seminar1 2013 WI ACT 272 2013 WI ACT 280 2013 WI ACT 358.

Slides:



Advertisements
Similar presentations
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Advertisements

The Surveyors Role in Utah Water Rights Utah Council of Land Surveyors February 19-21, 2014.
1 How to Process a Contract. 2 The Journey Of A Contract Contract & support documents are prepared by BRCC department employees & signed where appropriate.
Ventura County Mobile Home Park Rent Review Board Hearing February 26, 2014 Proposed Amendments to Mobile Home Park Rent Control Ordinance Project No.
Subdivision Plat Submittals Subdivision Plat Submittals
Retractable Bow Mounted Transducer
GIS DATA SUBMISSION FOR 2014
Filing Proofs or Affidavits 2010 Utah Water Users Workshop March 16, 2010 Jared Manning Division of Water Rights.
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
35 ILCS 200 Article 27 SPECIAL SERVICE AREA TAXING DISTRICT Creating Community Excitement for Lake Dredging/Restoration Projects.
Intro to Maine Subdivision Law
Recent ATLAS results Woochun USC Physics Seminar April 13, 2011 The ATLAS detector Heavy Flavor Physics at ATLAS Observation of Charmonium, Upsilon.
B r a z o s R i v e r A u t h o r i t y Ratification of Contract for Sale of Certain Property at Possum Kingdom Lake, and Authorization to Execute Contract.
Guidelines for accepting Report of Water Right Conveyance Forms (100%) 1.Terminology 2.Questions to ask yourself when reviewing a report of water right.
Standards of Practice Route Surveys Title 46 Professional and Occupational Standards Part LXI. Professional Engineers and Land Surveyors 1.
Role of the County Surveyor, Land Records and Interface with Zoning Department Bryan Meyer – La Crosse County Surveyor WCCA Presentation March 30, 2012.
Real Estate Law Legal Descriptions of Property Real Estate Law Legal Descriptions of Property.
Plat Law Changes Revisions to Minnesota Statutes Chapter 505.
S U R V E Y R E P O S I T O R Y F I L I N G I N F O R M A T I O N Survey Filing Information Quick Reference N E B R A S K A S U R V E Y R E C O R D R E.
Weld County Division 6 Wind Generators and Permitting Requirements Sec Wind generator standards. Chris Gathman, Planner III, Weld County WIND.
How do they all fit together? Land Records / GIS & Taxes.
Platting – Subdividing the Land Surface – Subdivision Process – Development Process Fragmenting Space – Real Property Units.
Patty Bartlett Logan County Treasurer / Public Trustee.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
Platting Update Orange County BCC January 27, 2015.
LAFCO Procedures: There’s a Lot Going On Behind the Scenes Roseanne Chamberlain Executive Officer Amador LAFCO Staff Workshop April 3, 2008.
Albemarle County, Virginia Office of the County Assessor.
Vacant Surplus City Property Administration & Finance Committee August 6, 2014.
BCC Public Hearing for consideration of an Agreement to Offer Donation of Real Property -and- a Solid Waste Management Permit Renewal APPLICANT: Hubbard.
Incorporation & Annexation Incorporation: establishment of city as legal entity –Reasons: provide town services (streets, law enforcement, water/sewer,
Riparian and Littoral Rights. What is Riparian Rights Terms Riparian: Flowing Waters Littoral: Coast or Sea Shore Rights Use of Shoreline Access to waters.
Board of County Commissioners PUBLIC HEARING January 5, 2010.
Lesson Understanding Land Measurement and Legal Descriptions.
PLANNING DEPARTMENT CITY OF PEARLAND PLANNING DAY MARCH 13, 2008.
Principles of California Real Estate Lesson 1: The Nature of Real Property.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
SURVEYING AND LAND RECORDS MANAGEMENT: A LIST OF THE MOST COMMON MISTAKES IN LAND RECORDS AND AN ANALYSIS OF HOW THEY OCCUR.
A 1,240 Acre Master Development Plan Proposal, West of Willcox, AZ. Cochise County Board of Supervisors August 23, 2011 Docket MDP / Z
Request for Plat Abandonment for the Kayenta Estates Minor Subdivision (S-06-02) Board of Supervisors December 4, 2012.
1 Water Right Conveyances Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) March.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
Understanding Legal Descriptions and the Public Land Survey System for the GIS Environment IGIC – March 7, 2006.
Board of County Commissioners PUBLIC HEARING June 29, 2010.
Request to Downzone from R-36 To RU-2 Zoning District Applicant: Marshall Miles of GM Propane Docket Z Request for a Rezoning Board of Supervisors.
Board of County Commissioners PUBLIC HEARING June 23, 2009.
FOR CLERKS AND RECORDERS  Planning Commission – public meeting and a public hearing  City Council – public hearing  Must contain: - a map of expansion.
Board of County Commissioners PUBLIC HEARING September 22, 2009.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Understanding Land Measurement and Legal Descriptions.
Real Estate Principles and Practices Chapter 3 Land Descriptions © 2010 by South-Western, Cengage Learning.
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
S Bachmann Springs Phase One Subdivision Abandonment Request.
Board of County Commissioners PUBLIC HEARING November 9, 2010.
Modern Real Estate Practice in Pennsylvania 12th Edition Chapter 4: Legal Descriptions.
North Carolina General Statute May 2009 Gary Thompson, PLS work
Modern Real Estate Practice in Illinois Eighth Edition Chapter 9: Legal Descriptions ©2014 Kaplan, Inc.
Surplus City Property – Request for Proposals Administration & Finance Committee February 1, 2012.
Prospective Rural Additions Meeting JULY 15, 2015.
N Current Adopted Post-LCP Certification and Appeal Jurisdiction Map Exhibit 1.
MSA PROFESSIONAL SERVICES, INC. | More ideas. Better solutions. INTRODUCTION Professional Land Surveyor.
Florida Real Estate Principles, Practices & Law 39th Edition
Common Surveys Used For Commercial Real Estate Transactions
Modern Real Estate Practice in Illinois
Texas Secretary of State Elections Division
Municipal Land Use Law C.40:55D-53 - NEW DEVELOPER
Kentucky County Treasurer’s
Presented by: David J. Meyers
Board of County Commissioners
Presentation transcript:

Changes to the WI Platting Law May 30,. 2014WSLS Spring Seminar WI ACT WI ACT WI ACT 358

Changes to the WI Platting Law Land Surveyor Old law: Surveys and plats/maps done by “Licensed Land Surveyor” and/or “Registered Land Surveyor” May 30,. 2014WSLS Spring Seminar2

Changes to the WI Platting Law Land Surveyor New law: “Professional Land Surveyor” “Licensed Land Surveyor” and “Registered Land Surveyor” have been replaced throughout Ch Effective 8/1/14 May 30,. 2014WSLS Spring Seminar3

Changes to the WI Platting Law Plat Submittals Old law:  Two submittal processes outlined in the statute  Clerks submittal process  Surveyors submittal process May 30,. 2014WSLS Spring Seminar4

Changes to the WI Platting Law Plat Submittals New law:  Submittal process streamlined into single process  Reflects the process currently being used  Electronic submittals allowed by statute Effective 8/1/14 May 30,. 2014WSLS Spring Seminar5

Changes to the WI Platting Law Plat Submittals New law:  Surveyor submits plat to Plat Review and any approving authorities  Plat Review submits plat to any objecting review authorities  Plat Review makes the record document and certifies on behalf of all objecting authorities  Surveyor presents certified plat to approving authorities for final approval and signature  Signed plat is filed/recorded with Register of Deeds Effective 8/1/14 May 30,. 2014WSLS Spring Seminar6

Changes to the WI Platting Law Plat Submittals Review of existing law: Review time limits remain the same  Approving authorities have 90 days for preliminary plats; 60 days for final plats  Objecting authorities have 20 days  Plat Review has 30 days May 30,. 2014WSLS Spring Seminar7

Changes to the WI Platting Law Plat Submittals Review of existing law:  Final plats, submitted within 36 months, that ‘substantially conform’ to the preliminary plat are entitled to approval  Approving authorities can permit final plats that are a portion of the preliminary plat (phased developments) May 30,. 2014WSLS Spring Seminar8

Changes to the WI Platting Law Plat Submittals Review of existing law:  Approval is based upon any ordinance that is in effect when the subdivider submits a preliminary plat, or final plat if no preliminary plat is submitted  Approving authorities can require the subdivider to install public improvements and to provide security to insure that the installation is completed May 30,. 2014WSLS Spring Seminar9

Changes to the WI Platting Law Security for Improvements Old law:  Approving authorities could require a surety bond or other acceptable security  Improvements are made within a reasonable time  A specified portion of the cost of improvements shall be paid in advance May 30,. 2014WSLS Spring Seminar10

Changes to the WI Platting Law Security for Improvements New law:  The subdivider decides if security will be a performance bond or letter of credit  The amount of security shall be not more than 120% of the estimated total cost of improvements  Security may not be required for more than 14 months after the improvements are “substantially completed” Effective 8/1/14 May 30,. 2014WSLS Spring Seminar11

Changes to the WI Platting Law Security for Improvements New law:  Thereafter, any withheld security may not be more than the cost to finish the remaining improvements plus 10% of the total cost of the completed improvements  This applies to all plats as of 8/1/14, even if plats were submitted for review prior to 8/1/14 Effective 8/1/14 May 30,. 2014WSLS Spring Seminar12

Changes to the WI Platting Law Security for Improvements New law:  “Substantially complete” is the time the binder coat is installed on streets/roads  If improvements are not streets/roads then when 90% of the public improvements ‘by cost’ are completed Effective 8/1/14 May 30,. 2014WSLS Spring Seminar13

Changes to the WI Platting Law Final Plats Old law: Margins for recordable document were 1 ½” binding margin of the left, 1” margins on remaining sides May 30,. 2014WSLS Spring Seminar14

Changes to the WI Platting Law Final Plats New law: Plats shall have 1” margins on all sides Effective 8/1/14 May 30,. 2014WSLS Spring Seminar15

Changes to the WI Platting Law Final Plats Old law: All land dedicated to the public, except roads and streets shall be clearly labeled “Dedicated to the Public” May 30,. 2014WSLS Spring Seminar16

Changes to the WI Platting Law Final Plats New law: All lands dedicated to the public shall be clearly labeled “Dedicated to the Public” Effective 8/1/14 May 30,. 2014WSLS Spring Seminar17

Changes to the WI Platting Law Final Plats Old law: Description of land in the Surveyor’s Certificate  By metes and bounds, commencing from an original government corner……; or  If land is located in a record subdivision or a recorded addition thereto, the land shall be described by the lot number, block and subdivision name previously tied to a corner of the PLSS May 30,. 2014WSLS Spring Seminar18

Changes to the WI Platting Law Final Plats New law: Description of land in the Surveyor’s Certificate  By metes and bounds, commencing from an original government corner…..; or  If land is located in a record subdivision or a recorded addition thereto, or recorded certified survey map that has been previously tied to the monumented line of a ¼ section, GL, PC …and shall be described by lot, block, subdivision name or CSM number Effective 8/1/14 May 30,. 2014WSLS Spring Seminar19

Changes to the WI Platting Law Final Plats Old law: Recording a plat  Contains a permanent nonfading black image on durable white media  Media is 22 inches wide by 30 inches long  Complies with s (2m)(b)4., Wis. Stats.  Bears the Departments certification of no objection May 30,. 2014WSLS Spring Seminar20

Changes to the WI Platting Law Final Plats New law: Recording a plat  Contains a permanent nonfading black image on durable white media or on other media that is acceptable to the Register of Deeds  Media is 22 inches wide by 30 inches long  Complies with s (2m)(b)4., Wis. Stats.  Bears the Departments certification of no objection Effective 8/1/14 May 30,. 2014WSLS Spring Seminar21

Changes to the WI Platting Law Final Plats Review of existing law: Recording time limits for a plat  Plat must be recorded within 12 months of the last approval; and within 36 months of the first approval  The plat contains all of the signed certificates and affidavits required by s (3) &  Recording time limits begin when approval certificates are signed on the recordable document May 30,. 2014WSLS Spring Seminar22

Changes to the WI Platting Law Water Old law:  “Lake and Stream Shore Plats”  Dedicated public access shall extend to the low water mark  Public access established per Ch. 236 may only be vacated by circuit court action  Land lying between the meander line and the waters edge shall be included within the lots/outlots on the plat  Location of ordinary high water mark not addressed May 30,. 2014WSLS Spring Seminar23

Changes to the WI Platting Law Water New law:  “Lake and Navigable Stream Shore Plats..”  Dedicated public access shall extend to the waters edge  Public access established per Ch. 236 may be vacated by circuit court action –or– may be discontinued under s & Effective 8/1/14 May 30,. 2014WSLS Spring Seminar24

Changes to the WI Platting Law Water New law:  Land lying between the meander line and the waters edge shall be included within the lots/outlots on the plat and certified survey map  Water elevations at the date of the survey and the approximate high water elevation must be shown on the final plat Effective 8/1/14 May 30,. 2014WSLS Spring Seminar25

Changes to the WI Platting Law Water New law: “Ordinary high water marks” for monumentation and meander lines. Surveyors may:  Show an ordinary high water mark on plat/map that has been determined by the DNR or otherwise determined pursuant to law  Approximate the ordinary high water mark and show its location on the plat/map Effective 8/1/14 May 30,. 2014WSLS Spring Seminar26

Changes to the WI Platting Law Water New law: “Approximated ordinary high water marks” “The location of the approximate ordinary high water mark shall be the point on the bank of a navigable stream or on the shore of a lake up to which the presence and action of surface water is so continuous as to leave a distinctive mark by erosion, destruction of terrestrial vegetation, or other easily recognized characteristics.” Effective 8/1/14 May 30,. 2014WSLS Spring Seminar27

Changes to the WI Platting Law Water New law: “Approximated ordinary high water marks” “For purposes of this section, a map, plat, or survey that shows an approximate ordinary high water mark shall state on its face that the mark is shown for reference only.” Effective 8/1/14 May 30,. 2014WSLS Spring Seminar28

Changes to the WI Platting Law Water New law: “Public Trust Information” A subdivision plat or a CSM that includes lots/outlots that extend to the waters edge per s (4) shall show on its face the following statement: "Any land below the ordinary high water mark of a lake or a navigable stream is subject to the public trust in navigable waters that is established under article IX, section 1, of the state constitution." Effective 8/1/14 May 30,. 2014WSLS Spring Seminar29

Changes to the WI Platting Law Water Review of existing law:  A 60’ public access to the water’s edge, connected to existing public roads, at not more than ½ mile intervals is required; unless  Wider access at greater intervals is agreed upon by DNR and DOA May 30,. 2014WSLS Spring Seminar30

Changes to the WI Platting Law Certified Survey Maps Old law:  CSMs contain up to 4 parcels of land consisting of lots and outlots  All corners of the CSM shall be monumented  A CSM may be used to dedicate streets and other public areas when Owners’ and Mortgagees’ Certificates are included and the CSM is approved by the local unit of government May 30,. 2014WSLS Spring Seminar31

Changes to the WI Platting Law Certified Survey Maps Old law: Description of land in the Surveyor’s Certificate  By metes and bounds, commencing from an original government corner……; or  If land is located in a record subdivision or a recorded addition thereto, the land shall be described by the lot number, block and subdivision name previously tied to a corner of the PLSS No vacation process May 30,. 2014WSLS Spring Seminar32

Changes to the WI Platting Law Certified Survey Maps New law:  Monuments that fall within a street, the monument shall be placed at the side line/right of way  CSMs may be used to dedicate streets, public areas, and may grant easements to the public or any person, society, or corporation when Owners’ and Mortgagees’ Certificates are included and the CSM is approved by the local unit of government  Recording time limits are 12 months from last approval; 36 months from the first approval Effective 8/1/14 May 30,. 2014WSLS Spring Seminar33

Changes to the WI Platting Law Certified Survey Maps New law: Description of land in the Surveyor’s Certificate  By metes and bounds, commencing from an original government corner…..; or  If land is located in a record subdivision or a recorded addition thereto, or recorded certified survey map that has been previously tied to the monumented line of a ¼ section, GL, PC …and shall be described by lot, block, subdivision name or CSM number Effective 8/1/14 May 30,. 2014WSLS Spring Seminar34

Changes to the WI Platting Law Certified Survey Maps New law: Circuit court vacation A CSM, or part of a CSM, may be vacated by the circuit court. The application may be made by:  The owner of any lot or outlot in the land that is the subject of the CSM  The county board if the county has acquired an interest by tax deed Effective 8/1/14 May 30,. 2014WSLS Spring Seminar35

Changes to the WI Platting Law Certified Survey Maps New law: Expanded use of CSMs A local unit of government may allow more than 4 parcels on a CSM when:  They have an established planning agency;  A ordinance is enacted or resolution is passed;  A maximum number of parcels is specified; and  Land is zoned commercial, industrial or mixed use Effective 4/18/14 May 30,. 2014WSLS Spring Seminar36

Changes to the WI Platting Law Certified Survey Maps New law: Expanded use of CSMs Requirements for passing an ordinance/resolution:  Receive recommendation from planning agency  Hold a public hearing noticed by publishing a class two notice  Enacted ordinance/resolution shall be published in a form suitable for public distribution Effective 4/18/14 May 30,. 2014WSLS Spring Seminar37

Changes to the WI Platting Law Certified Survey Maps New law: Expanded use of CSMs  Such enacted ordinance/resolution by a city or village may be applied to the extraterritorial plat approval jurisdiction area  When local units of government have conflicting requirements for these CSMs, the most restrictive requirements apply Effective 4/18/14 May 30,. 2014WSLS Spring Seminar38

Changes to the WI Platting Law Certified Survey Maps New law: Review of Expanded CSMs  Expanded CSMs that reconfigure lots/outlots within a record plat, assessors plat or CSM, where no additional parcels are created – are NOT reviewed by DOA  Expanded CSMs that create additional lots, in or out of a plat or map, ARE submitted to DOA for review (20 day review period; $100 per map) Effective 4/18/14 May 30,. 2014WSLS Spring Seminar39

Changes to the WI Platting Law Certified Survey Maps New law: Review of Expanded CSMs  Expanded CSMs that abut a state highway or connecting highway and change the exterior boundary of a plat or CSM must be submitted to DOT for review  Expanded CSMs that are located in the City of Milwaukee are not subject to state review Effective 4/18/14 May 30,. 2014WSLS Spring Seminar40

Plat Review 101 E. Wilson St. 9 th FL Madison, WI (608) May 30,. 2014WSLS Spring Seminar