Mid-States Highway-Rail Crossing Safety Conference Larry J. Colclasure, P.E. Director of Transportation Operations Texas Department of Transportation Waco.

Slides:



Advertisements
Similar presentations
1 User Perspective on Deploying 511 Al Kosik Director, Traffic Management Section TxDOT National Transportation Operations Coalition Talking Operations.
Advertisements

RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E.
Accessible Pedestrian Signal
John Barton, P.E. Assistant Executive Director for Engineering Operations Texas Department of Transportation Mid-States Highway-Rail Safety Conference.
Do you know your signs?.
PEDESTRIANS Osama Tabash Khaled El-Yazory Dr. Essam Almasri
2008 Mid-States Highway–Rail Grade Crossing Safety Conference May 20, 2008 David Peterson.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Carter Danne, PE, PTOE Parametrix, Inc. Assessment of Point Defiance Bypass for High-Speed Intercity Passenger Rail.
CE 2710: Transportation Engineering Traffic Signals April 3, 2009 Nicholas Lownes, Ph.D.
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
Automated Enforcement at Rail Crossings in Grand Prairie, Texas Sgt. Eric Hansen Grand Prairie Police Department Traffic Section.
Mecca Roundabout Project Mecca, CA September 28, 2011.
Advance Preemption Costs More than Simultaneous Preemption: Fact or Fiction?
1 Austin Transportation Department Ali Mozdbar, P.E., PTOE Division Manager, Traffic Signals Traffic Signal Features for Pedestrians & Bicyclists.
2008 Mid-States Highway Rail Grade Crossing Safety Conference.
State Highway 6 Corridor Access Plan. SH 6 Project Description Project Initiated and funded by –City of Houston –Missouri City –City of Sugar Land –Harris.
Advanced Traveler Information System ATIS. What are Intelligent Transportation Systems (ITS) ? The application of advanced sensor, computer, electronics,
Transportation System Issues and Challenges
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
Unconventional Arterial Intersection Design University of Maryland Advanced Transportation Day Aug. 28th 2014 Traffic Safety and Operations Lab University.
A Method to Verify Railroad Interconnect with Highway Traffic Signal Systems Adam Moore Portland Bureau of Transportation Oregon ITE Winter Workshop February.
Module 13: Highway-Rail Grade Crossings (HRGC)
2015 Traffic Signals 101 Topic 7 Field Operations.
2015 Traffic Signals 101 Topic 1 Why?. Office of Traffic, Safety, and Technology Why? Who initiates a signal? Developer City/County Politician Public.
Houston Trainwatch Working together to keep our city safe and moving Jack C. Hanagriff Houston Police Department Federal Railroad Administration Law Enforcement.
Lesson 2.2 Traffic Signals  Today’s Objectives: 1. Explain what to do at a green, yellow, and red light. 2. Describe the action to take when you approach.
2015 Traffic Signals 101 Topic 11 Emergency Vehicle Preemption (EVP) and Railroad (RR) Preemption.
May 20, 2008 Train Detection 1 Train Detection Systems Mid-States Highway-Rail Grade Crossing Safety Conference Session 4 Use of New Technology for Highway-Rail.
Illinois Department of Transportation Emergency Management I-74 Reconstruction Project Peoria, Illinois ITS Midwest Annual Meeting February 7, 2006.
Transportation and Industry – Railroads come to Texas Chapter 19 Section 2.
Athens Avenue / UPRR Grade Separation Feasibility Study Thunder Valley Casino.
Trans-Texas Corridor: A Public Private Partnership Texas Department of Transportation AASHTO Spring Board of Directors Meeting May 9, 2005 Michael W. Behrens,
Advanced Preempted Crossings – A Case Study Tim Oster Railroad Project Manager City of Fort Worth Mid-States Highway-Rail Grade Crossing Safety Conference.
Texas Operation Lifesaver and TxDOT Partnership Discover the power of custom layouts.
V ehicle I nfrastructure I ntegration Jeffrey F. Paniati Associate Administrator for Operations and Acting Program Manager for ITS Joint Program Office.
Metro Gold Line Eastside Extension Four Quadrant Gate Feasibility Study Summary.
Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS.
RAILROAD-HIGHWAY GRADE CROSSING HANDBOOK AUGUST 2007 REVISION PRESENTED BY KURT ANDERSON 2008 Mid-States Highway Rail Grade Crossing Safety Conference.
Revisions to Part 8 – Traffic Control for Railroad and LRT Grade Crossings.
2015 Traffic Signals 101 Topic 2 Agreements. Office of Traffic, Safety, and Technology Agreements Signal Agreements An Agreement is a contract between.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
Greenlight Project Evaluation Community and Place Division Nikit Nain Presenter.
TxDOT Utility Installation Review (UIR) System
Use of HITL in Bus Priority Design Kevin Balke, Ph.D., P.E. TransLink ® Research Center Director Texas Transportation Institute Hardware-in-the-Loop Symposium.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Pedestrian Design at Intersections Lesson 11 Publication No.
STATE OF TEXAS BORDER PARTNERSHIP WORKING GROUP Kirk D. Fauver Statewide Planning Engineer FHWA TX Division (HPP-TX) June 30, 2004.
Indiana MUTCD: for Operations & Maintenance Issues/Solutions – Part II.
Proposed Additions to MUTCD. Chapter 8E. Busway Grade Crossings Proposed revision submitted to FHWA in June Intended for next edition of MUTCD.
PROMOTING BIKING AND WALKING AS FUN, HEALTHY FORMS OF TRANSPORTATION IN PHILADELPHIA ELEMENTARY SCHOOLS.
Ismael Garza, P.E., PTOE NDOT Traffic Operations Wednesday, September 16, 2015.
CONTEXT-SENSITIVE DESIGN 2002 Texas Department of Transportation Design Conference.
1. 2 Mobility 3 Capacity 4 Efficiency of Commerce.
Elizabeth G. Jones Assoc. Professor of Civil Engineering and
Synthesis of Recent & Ongoing Studies: Accessibility and Pedestrian Safety at Roundabouts Andrew T. Duerr, P.E. Northeast US Roundabouts Peer Exchange.
Saving the King Street Bicycle Boulevard
Fort Worth to Houston Corridor Expressway Concept
Guide for Determining Time Requirements for Traffic Signal Preemption at Highway-Rail Grade Crossings: Revisions to the TxDOT Worksheet Kevin Balke, PhD,
Lessons From Fox River Grove
Emergency Vehicle Preemption (EVP) and Railroad (RR) Preemption
Transportation and Industry – Railroads come to Texas
Transportation and Industry – Railroads come to Texas
Meeting of the Hillsborough MPO Board December 5, 2017
USAG-Ft. Bliss TX. Safety Office,
GATE SAFETY Traffic gates on JMU campus are for vehicles only. Do not cross beneath gates that are up as they may come down without warning. James Madison.
Southwest LRT METRO Green Line Extension
Presentation to City of Palo Alto Rail Committee on Quiet Zones
Welcome to Cooperative Inclusion Plan (CIP) Class #3: TxDOT Construction Prequalification (Prequalification Division-Austin, TX) & NTTA Bidding (Procurement.
Rules of the Road Chapter 10
The Use Of Hard Shoulders As A Turning Lane: A Safety Evaluation
Presentation transcript:

Mid-States Highway-Rail Crossing Safety Conference Larry J. Colclasure, P.E. Director of Transportation Operations Texas Department of Transportation Waco District

Waco District Dallas Ft Worth Austin

Waco Temple Killeen Fort Hood Copperas Cove

 Requires cooperation between agencies  Dependent on others  Catastrophic results when things don’t go according to plan Key Concerns with Preemption:

Other Key Concerns with Preemption:  Tools not available to assist.  Static (factors do not change).  Infrequent occurrences.

It equals a continual relearning process and a poor understanding by many technicians and engineers.

Waco Temple Killeen Fort Hood Copperas Cove

Copperas Cove, Texas

Pedestrian Issues to Consider:  How to account for pedestrians.  How to handle ped walk time?  How to handle ped clearance time?

Vehicular Issues to Consider:  How much time is needed to clear the queue?  How much time is needed for track clearance green?  Is preemption affected by the signal being in different phases?  What is preemption delay time?

Railroad Issues to Consider:  How much preemption time do I need?  How much advance preemption time is needed?  How much total preemption time do I have available?

Recent TxDOT Research on Preemption  Improved Traffic Signal Operation near Railroad Grade Crossings with Active Devices  Non-Vital Advance Rail Preemption of Signalized Intersections near Highway –Rail Grade Crossings  Best TxDOT Practices for Signal Timing & Detection Design at Intersection

Recent Tools Developed:  LADOT Preemption Form with Gate Interaction (Sean Skehan)  Texas Signal Coordination Optimization [Preemption page] (Michael Pratt & James Bonneson)