U N C L A S S I F I E D Changes to EPA Radiological Stack Monitoring Requirements, and Ramifications on LANL Operations David Fuehne, CHP March 22, 2005.

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration Global Results.
Advertisements

IAQ, FILTRATION AND THE CONSUMER MARKET Matthew Klein, PE-ME, MBA Indoor Air Quality Solutions, Inc.
No 1 IT Governance – how to get the right and secured IT services Bjorn Undall and Bengt E W Andersson The Swedish National Audit Office Oman
IMO 107(49)/46 CFR ppm Bilge Separators 15 ppm Bilge Alarms
County of Fairfax, Virginia 1 Department of Transportation Bus Stop Improvement Program Fairfax County Department of Transportation Transit Services Division.
Unit C: Agricultural Power Systems
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Purpose of Carburetion
NPA WG : Single and multiple releases
Municipal Solid Waste Landfill NSPS/EG Requirements Illinois EPA Bureau of Air Mike Davidson 217/
METAL FURNITURE SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART RRRR July 2006.
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
METAL CAN SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART KKKK June CFR PART 63, SUBPART KKKK June 2006.
DRAFT IRON & STEEL FOUNDRY MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART EEEEE.
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL COIL SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART SSSS May, CFR PART 63, SUBPART SSSS May, 2006.
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
Air Permitting : Process Improvement Kaizen Event June 4 – 8, 2007 Transforming Government- the challenge and opportunity of the 21st century.
Making the System Operational
Grants 3.0 Departmental Administrator Review January 22, 2014.
Guidance on New CEs Emergency Repair Projects Operational Right-of-Way Limited Federal Funds EUM – March questions to:
IAEA Training in Emergency Preparedness and Response Module L-051 General Concepts of Exercises to Test Preparedness Lecture.
CFC/HCFC MANAGEMENT Training Conference 2013 – Chicago, IL
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
Air Pollution Control « Air Pollution Control Ordinance » ( Chapter 311 ) The Air Pollution Control Ordinance(APCO) is the main legislative framework.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Module 2: General Working Conditions 2.1 Housekeeping & Slips, Trips, & Falls Susan Harwood Grant Number SH F-23.
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
EMS Checklist (ISO model)
1 To enable you to view this presentation at your own pace, we created it for manual viewing: To advance these slides, click your mouse or use the forward.
Introduction When you choose a restaurant for a meal, are you concerned with: The price of the meal How long you have to wait to be seated The quality.
Red Tag Date 13/12/11 5S.
Presented By: Dean Soultanian Director of Proposal Development & Principal in Charge of PCB Remediation Activities March 30, 2011 Managing PCB Contaminated.
New Source Review (NSR) Program Basics
Energy Using Products Directive Mark Shayler. Why? ? Rising level of electrical waste Shift in legislation Waste disposal and clean-up costs Resource.
Michael Hopkins, P.E., Assistant Chief, DAPC. GP Development PBR Updates Other Updates Short BAT History 10 ton/yr BAT.
Princeton Wastewater Servicing Study
1 What is a Universal Waste?. 2 Universal Waste is universally generated.
Hazardous Waste Section
1 Lesson 4 Computer Maintenance High School Credit.
Capacity Planning For Products and Services
Technologies for CCS on Natural Gas Power Systems Satish Reddy April 2104.
Checking & Corrective Action
Last Planner ® National Capital Region Community of Practice Victor Sanvido – Southland Industries Matt Bruening – Southland Industries 1.
Controlling Lead-Based Paint Hazards Chapter 5 Lead Abatement for Workers Course.
Certification of Compliance By Evita Lagard
Importance of Effective Sand Management - DTI View Colin Cranfield Reservoir Engineer Licensing & Consents Unit, Aberdeen.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Determining the Accuracy of SO 3 /H 2 SO 4 Measurements: Development of a Field Spiking Procedure Presented at Electric Utilities Environmental Conference.
1 Volume measures and Rebasing of National Accounts Training Workshop on System of National Accounts for ECO Member Countries October 2012, Tehran,
Topical Aspects on Monitoring Airborne Radioactive Effluents from NPPs Wan-tae KIM.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
GENERAL IDEAS IN AIR POLLUTION CONTROL
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
Implementation and Management of Leak Detection and Repair Programs – New Rules and Other Considerations Nebraska Ethanol Safety & Environmental Coalition.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Facilities Management and Planning Horace Bomar, Director November 1, 2011.
Air Emission Control Technology UWM Air Pollution Meteorology Class November 20, 2007 Frances A. Hardrick We Energies.
Tritium in The Demin Water System -- An IE Bulletin Challenge Ken Sejkora Entergy Nuclear Northeast – Pilgrim Station Presented at the 12 th Annual.
Innovative Environmental Policy Air Permits David Neleigh Chief, Air Permits Section EPA Region 6 May 10, 2006.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Recent Developments in Transportation Conformity Beverly Chenausky Multimodal Planning Division – Air Quality Breakout Session: Transportation Conformity/Air.
Proposed Amendments to Enhanced Vapor Recovery Regulations November 18, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental.
Asbestos NESHAP Inspection and Safety Procedures Workshop Section Seventeen Legal Perspectives October 2008.
01/15/16Prop 39 Update - Maintenance & Operations - Sustainability Initiatives Unit1 CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY.
Ambient Air Sampling for ARP Compliance with the NESHAP, Subpart H Paul Ritter State of Idaho – DEQ Oversight Program November 17, 2011.
Integrating Modeling and Physical Testing for Assessing Filtered Exhaust Stack Sampling Probe Location Xiao-Ying Yu, Kurtis P. Recknagle, John A. Glissmeyer,
Topical Aspects on Monitoring Airborne Radioactive Effluents from NPPs
Topical Aspects on Monitoring Airborne Radioactive Effluents from NPPs
Presentation transcript:

U N C L A S S I F I E D Changes to EPA Radiological Stack Monitoring Requirements, and Ramifications on LANL Operations David Fuehne, CHP March 22, 2005 – AMUG Meeting LA-UR

U N C L A S S I F I E D Discussion Areas EPA standard for radiological stack monitoring 2003 changes to standard Maintenance & inspection requirements – LANL impact Design criteria for new stacks – LANL impact Conclusions 2

U N C L A S S I F I E D EPA Standard for Radiological Stack Monitoring 40 CFR 61, Subpart H – DOE facilities 10 millirem per year – Entire laboratory is one facility – Receptor is residence, school, business Stack monitoring required if potential emissions exceed 0.1 mrem per year – Normal operations – No credit for pollution controls (HEPA, scrubbers, etc.) LANL – Meteorology & Air Quality group, Environmental Stewardship division 28 monitored stacks 3

U N C L A S S I F I E D Changes to the Standard in 2003 Incorporate ANSI/HPS N – Revision to 1969 standard – Maintenance & inspection criteria – Design criteria for samplers and emission stacks Existing emissions sources – Grandfathered design – Maintenance & inspection criteria apply New or Modified Stacks – All design criteria apply – M&I criteria 4

U N C L A S S I F I E D Maintenance & Inspection Criteria

U N C L A S S I F I E D Maintenance & Inspection Requirements Many minor items – calibrated electronics, clear rotameters, etc. Stack sample system inspection program – Annual inspections – Nozzles, probes, sample lines – Proper alignment – Free from damage – Free from deposition Clean the systems if deposition is observed – When? No guidance provided 6

U N C L A S S I F I E D M&I Requirements: LANL Implementation Plan Flexible borescope into stack lines Focus on nozzle openings, probes, bends in sample lines Record images – photos & video 2003: Six systems with visible deposition – Two were easy to clean – Two were difficult to clean – Two were impossible 7 Photo property of UXR

U N C L A S S I F I E D M&I Requirements – LANL Implementation: Easy to clean Accelerator stack – discrete point of deposition Caulking / sealant – HVAC maintenance? Immediately removed during inspection Small amount of rad material (sub-nanocurie Co-60) on cleaning material, include in annual source term 8

U N C L A S S I F I E D M&I Requirements – LANL Implementation: Easy to clean Rad liquid waste treatment facility Wet environment – condensed vapors Straightforward cleaning - remove, wipe down, replace Small downtime on sampler No detectable rad material in cleaning solution, cloths Completed within 60 days of discovery 9

U N C L A S S I F I E D M&I Requirements – LANL Implementation: Difficult to clean Research facility – two stacks Straightforward problem, complex solution Nuclear facility issues – Safety review process – Perchlorate concerns – bomb gear – Stack fan shutdown, coordinate with users Oil mist on surfaces – HVAC maintenance No detectable activity on surfaces, cleaning materials Completed ~18 months after discovery 10

U N C L A S S I F I E D M&I Requirements – LANL Implementation: Impossible to Clean Nuclear facility, two stacks – Original stack samplers, ~ 30 years installed – Visible scale on external surfaces Old design – 1969 samplers – Low transport efficiency <20% – Three 90-degree bends Operation issues – restricted access, no backup samplers Decision – Replace, not clean – Four sample rakes on each stack – independent – Roof level – simplify access – EPA agrees to plan – Deadline : Dec 2005 – 24 months after initial inspection 11

U N C L A S S I F I E D Effects of Deposition on Emissions Data? Already assume some particulate losses will occur Assumed rate-of-loss based on large diameter particles Emissions calculations correct for these assumptions Double-count by including rad material from inspections in annual source term – Most cleaning shows NDA – One stack with sub-nanocurie levels Result – no negative impact on program; conservatism is built-in 12

U N C L A S S I F I E D Changes to M&I Program - Audit Visually examine external surfaces as well as internal surfaces – inspect nozzle conditions Record imagery each year Formalize process with procedure, annual performance summary – Currently – IWDs, checklists 13

U N C L A S S I F I E D Design Criteria

U N C L A S S I F I E D Design Criteria for New & Modified Stacks Sample probe performance Recommend single-point shrouded probe Nozzle transmission ratio % Particle transmission to collection media >50% 10 micron particles used for analysis 15

U N C L A S S I F I E D Design Criteria for New & Modified Stacks: Sample location Well-mixed, uniform flow – Justifies single point sampler Flow angle > 20 degrees Velocity profile COV < 20% Aerosol concentration COV < 20% – Use 10 micron particles to test Iterative process – pick location & test – Failure – test new location – Swiss-cheese stack 16

U N C L A S S I F I E D Design Criteria for New & Modified Stacks Complicating factors When do these criteria apply? New source, including new construction in existing buildings Modification of existing source – Modification must cause increase in off-site dose >0.1 millirem/yr – Certain activities are NOT modifications Review new activities for sampler system design adequacy 17

U N C L A S S I F I E D Design Criteria for New & Modified Stacks Complicating factors LANL stacks – Seven systems meeting design criteria Locate new ops in these buildings More reviews required, more manpower requirements EPA notification timeline Monitoring yes/no/what System design adequacy 18

U N C L A S S I F I E D LANL Example Waste Repackaging Facility

U N C L A S S I F I E D Design Criteria, LANL Example: Waste Repackaging Facility Original plan – new construction – Easy to meet requirements – Tall stack, smooth transitions, “clean” system to test New plan – retrofit existing system – Poor fan-to-stack transitions – Aerosol injection points – Accessing sampling points – scaffolding Problems generating 10 um aerosol in quantity Stack tests unsuccessful 20

U N C L A S S I F I E D Design Criteria, LANL Example: Waste Repackaging Facility Move sampler to new location – glove box exhaust Long straight runs Lower air volume to dilute aerosol Concern – facility as a whole is not monitored, just primary glove box operation 21

U N C L A S S I F I E D Design Criteria, LANL Example: Waste Repackaging Facility Lessons Learned Time Line – Entire process – six months to get approved location Capability to perform these tests in the future – Aerosol R&D team dissolved years ago – MAQ stack engineering team “streamlined” – Collaboration among 3+ groups required – priorities? – Rely on outside vendors – clearances, training, schedule 22

U N C L A S S I F I E D LANL Example TRU Waste Vitrification

U N C L A S S I F I E D Design Criteria, LANL Example: TRU Waste Vitrification New process at LANL = new source of emissions Off-site dose potential over 0.1 millirem per year Retrofit existing stack? Cannot meet design criteria Cannot change buildings – material concerns Solution – brand new stack(s) – Not same as sampler upgrade discussed earlier Capital funding required; multiple years delay Operations cannot commence until upgrade complete 24

U N C L A S S I F I E D Conclusions

U N C L A S S I F I E D Conclusions New maintenance & inspection criteria Routine inspection requirements are good improvement Cleaning activities can impact facility operations “Gray area” on time window for completion of cleaning activities Compliance issues could arise if cleaning operations delayed 26

U N C L A S S I F I E D Conclusions, continued Design criteria Additional workload for new process reviews Retrofitting existing systems can be problematic Testing capability at LANL may not be available Iterative testing can be frustrating Can result in significant delays for planned operations 27

U N C L A S S I F I E D Thanks for your time! Questions or comments? David Fuehne LANL ENV-MAQ external web site 28