10 July 2006ATLAS Plenary1 Welcome to the ATLAS Overview Week in Stockholm - A few words introducing ATLAS to our hosts - The new LHC schedule - Financial.

Slides:



Advertisements
Similar presentations
EPP-ED WORKSHOP ON RULES OF PARTICIPATION ON THE IMPLEMENTATION OF THE 7 th FRAMEWORK PROGRAMME ( ) Viewpoint from the European University Association.
Advertisements

Management’s preliminary comments to the ERC Report.
1 Japanese activities in LHC Takahiko Kondo, KEK November 28, 2005 KEK-DESY 1st Collaboration Meeting in Tokyo.
JWG, 14 October, 2009, Vladislav Manko Status of work and plans of the Russian group in the ALICE Collaboration as of October, 2009.
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
10/26/2005 ATLAS Visit Dr Pierre Coulombe President, National Research Council Canada Short introduction by Peter Jenni and Robert Orr.
1 st International Conference "Discoveries of Higgs and Supersymmetry to Pioneer Particle Physics in the 21st Century" Concluding Remarks (LHC Status)
Status of the ATLAS MM project
Roger Jones: The ATLAS Experiment Ankara, Turkey - 2 May The ATLAS Experiment Roger Jones Lancaster University.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
. APS meeting April 14 h, ATLAS Detector – status and plans David Lissauer Brookhaven National Lab. ATLAS Technical Coordination APS meeting April.
Japanese Commitment to the LHC experiments Katsuo Tokushuku (KEK) May 17, 2008 The KEK-CNRS/IN2P3-CEA/DSM/DAPNIA Collaboration Meeting at CRNS.
Bengt Lund-Jensen, AlbaNova, Status of the ATLAS experiment.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Alexei Klimentov : ATLAS Distributed Computing NEC2009 Varna- 10 September Alexei Klimentov Brookhaven National Laboratory XXII-th International.
1 ATLAS installation: Status about 3 years ago…. 2 ATLAS installation: Status half a years ago…
Andrea Ventura University of Salento & INFN Lecce on behalf of the ATLAS Collaboration New Trends in High-Energy Physics Alushta, Crimea, Ukraine, September.
Taming the beast: Using Python To Control ATLAS Software David Quarrie NERSC Division Lawrence Berkeley National Laboratory 3 July 2006.
The Large Hadron Collider project is a global scientific adventure, combining the accelerator, a worldwide computing grid and the experiments, initiated.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
Report from the Program Advisory Committee for Particle Physics to the JINR Scientific Council T. Hallman for J. Nassalski JINR Scientific Council Meeting.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  now recent news on schedule  ‘closure of beam on 31 August’, first injected.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 “Steering the ATLAS High Level Trigger” COMUNE, G. (Michigan State University ) GEORGE, S. (Royal Holloway, University of London) HALLER, J. (CERN) MORETTINI,
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
January 21, 2003 Transition from the Construction Project to Pre-Ops and Operations Howard Gordon.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
ATLAS, ATLAS through first data Fabiola Gianotti (on behalf of the ATLAS Collaboration)
COMPASS FRC – November 29, COMPASS FRC Novembre 29, 2013 COMPASS – phase II MoU Technical Coordinator Preparations for 2014 run Publications.
F.Gianotti, ATLAS RRB, Collaboration and Management matters First results from 900 GeV and 7 TeV collision data (in particular: first observation.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  continuing well, approx 2-4 month delay in some areas  NEW schedule:
TAU08, NovosibirskM. Pilar Casado (IFAE & UAB) 1 ATLAS Tau Trigger Belanger-Champagne, C; Benslama, K; Bosman, M; Brenner, R; Casado, MP; Czyczula, Z;
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
2nd annual ARTEMIS meeting Le Carré des Sciences Paris 3-4 July 2008 Rosy Nikolaidou CEA Saclay.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
Establishing large international research facilities: the HEP case 1st ASEPS Summit Tsukuba March 25, 2010 Sergio Bertolucci CERN LHC.
Searching for Compositeness with ATLAS Kaushik De University of Texas at Arlington For the ATLAS Collaboration DPF/JPS 2006, Hawaii November 1, 2006.
The ATLAS Trigger and Data Acquisition System John Strong Royal Holloway, University of London.
DOE/NSF Project Experience Key Ingredients to Success
ATLAS as an example of a large scientific collaboration
Depleted CMOS Pixel Detectors
CLIC work program and milestones
ATLAS through first data
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
TDAQ Phase-II kick-off CERN background information
PANDA Muon Group Meeting, Protvino 7 June 2011 G
LHC schedule.
EUDET Detector R&D towards the International Linear Collider
ATLAS Progress Report (part II)
Overview & baseline of LS2 and roadmap for CRG
Francesco Forti University and INFN, Pisa
Status of ATLAS Resources
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Presentation transcript:

10 July 2006ATLAS Plenary1 Welcome to the ATLAS Overview Week in Stockholm - A few words introducing ATLAS to our hosts - The new LHC schedule - Financial status - Implementation of the Operation Model and goals of the ATLAS Week

10 July 2006ATLAS Plenary2 Thank you for the friendly welcome to Stockholm ! Professor Kare BremerStockholm University, Vice-Chancellor Professor Anders FlodstroemKTH Stockholm, President Professor Arne JohanssonSwedish Research Council, Secretary General Natural and Engineering Sciences … but of course also already now to Kerstin Jon-And and Bengt Lund-Jensen for all the careful preparations for the meeting!

10 July 2006ATLAS Plenary3 ATLAS Collaboration (As of the March 2006) 35 Countries 158 Institutions 1650 Scientific Authors total (1300 with a PhD, for M&O share) New application for CB decision in July DESY, Humboldt U Berlin (Germany) SLAC, New York U (US) Albany, Alberta, NIKHEF Amsterdam, Ankara, LAPP Annecy, Argonne NL, Arizona, UT Arlington, Athens, NTU Athens, Baku, IFAE Barcelona, Belgrade, Bergen, Berkeley LBL and UC, Bern, Birmingham, Bologna, Bonn, Boston, Brandeis, Bratislava/SAS Kosice, Brookhaven NL, Buenos Aires, Bucharest, Cambridge, Carleton, Casablanca/Rabat, CERN, Chinese Cluster, Chicago, Clermont-Ferrand, Columbia, NBI Copenhagen, Cosenza, AGH UST Cracow, IFJ PAN Cracow, Dortmund, TU Dresden, JINR Dubna, Duke, Frascati, Freiburg, Geneva, Genoa, Giessen, Glasgow, LPSC Grenoble, Technion Haifa, Hampton, Harvard, Heidelberg, Hiroshima, Hiroshima IT, Indiana, Innsbruck, Iowa SU, Irvine UC, Istanbul Bogazici, KEK, Kobe, Kyoto, Kyoto UE, Lancaster, UN La Plata, Lecce, Lisbon LIP, Liverpool, Ljubljana, QMW London, RHBNC London, UC London, Lund, UA Madrid, Mainz, Manchester, Mannheim, CPPM Marseille, Massachusetts, MIT, Melbourne, Michigan, Michigan SU, Milano, Minsk NAS, Minsk NCPHEP, Montreal, McGill Montreal, FIAN Moscow, ITEP Moscow, MEPhI Moscow, MSU Moscow, Munich LMU, MPI Munich, Nagasaki IAS, Naples, Naruto UE, New Mexico, Nijmegen, BINP Novosibirsk, Ohio SU, Okayama, Oklahoma, Oklahoma SU, Oregon, LAL Orsay, Osaka, Oslo, Oxford, Paris VI and VII, Pavia, Pennsylvania, Pisa, Pittsburgh, CAS Prague, CU Prague, TU Prague, IHEP Protvino, Ritsumeikan, UFRJ Rio de Janeiro, Rochester, Rome I, Rome II, Rome III, Rutherford Appleton Laboratory, DAPNIA Saclay, Santa Cruz UC, Sheffield, Shinshu, Siegen, Simon Fraser Burnaby, Southern Methodist Dallas, NPI Petersburg, Stockholm U, KTH Stockholm, Stony Brook, Sydney, AS Taipei, Tbilisi, Tel Aviv, Thessaloniki, Tokyo ICEPP, Tokyo MU, Toronto, TRIUMF, Tsukuba, Tufts, Udine, Uppsala, Urbana UI, Valencia, UBC Vancouver, Victoria, Washington, Weizmann Rehovot, Wisconsin, Wuppertal, Yale, Yerevan

10 July 2006ATLAS Plenary4 Diameter25 m Barrel toroid length26 m End-cap end-wall chamber span46 m Overall weight 7000 Tons The ATLAS detector ATLAS superimposed to the 5 floors of building 40

10 July 2006ATLAS Plenary5 The underground cavern at point-1 for the ATLAS Detector Length = 55 m Width= 32 m Height= 35 m

10 July 2006ATLAS Plenary6 An aerial view of point-1 (Across the street from the CERN main entrance)

10 July 2006ATLAS Plenary7 The ATLAS detector being installed now in the underground cavern

10 July 2006ATLAS Plenary8 Simulation of a H   ee event in ATLAS

10 July 2006ATLAS Plenary9 The impressive progress on the construction, installation, and commissioning of the detector, as well as on the preparation for the data collection, the distributed analysis and the physics, will be covered over this week As the details we will be presented all ‘first hand’ by those doing actually the work, there is no point for me to cover any of this now… Integration work on one of the two SCT end-caps

10 July 2006ATLAS Plenary10 News from the LHC machine

10 July 2006ATLAS Plenary11 New LHC machine schedule A new LHC schedule and turn-on strategy was presented to the CERN SPC and Council three weeks ago The experiments were informed only shortly before, and allowed to communicate it just after the SPC meeting The main features of the new schedule are: - The beam pipe closure date will be end of August 2007 (instead of end of June 2007) - After that there will still be a few weeks of controlled access to the cavern - This is followed by an LHC commissioning run with collisions at the injection energy ( GeV), until the end of Then there will be a shut-down (typically 3 months) during which the remaining machine sectors will be commissioned without beam to full energy (7 TeV) - After that the LHC will be brought into operation for the first physics run at 14 TeV, with the aim to integrate substantial luminosity by the end of 2008 The LHC Machine Advisory Committee (MAC) has strongly endorsed this new start-up strategy as the most efficient way to reach 14 TeV collisions The SPC stressed that the goal should be several fb -1 integrated luminosity at the end of 2008

10 July 2006ATLAS Plenary12 Last magnet deliveredOctober 2006 Last magnet testedDecember 2006 Last magnet installedMarch 2007 Machine closedAugust 2007 First collisionsNovember 2007 Milestones for the machine - Sectors 7-8 and 8-1 will be fully commissioned up to 7 TeV in If we continue to commission the other sectors up to 7 TeV, we will not get circulating beam in The other sectors will be commissioned up to the field needed for de-Gaussing. - Initial operation will be at 900 GeV (CM) with a static machine (no ramp, no squeeze) to debug machine and detectors. - Full commissioning up to 7 TeV will be done in the winter 2008 shutdown LHC commissioning (Presented by CERN to SPC and Council)

10 July 2006ATLAS Plenary13

10 July 2006ATLAS Plenary14 LSS installation Installation activities in a sector QRL installation QRL consolidation after pressure test Cryo-magnet transport Interconnection phase 1 Pressure test Cryostat closure – Interconnect consolidation ELQA at warm Cool-down Power tests Machine check-out Beam at 450 GeV/C Insulation // Interconnect phase 1 Beam pipes & bake-out End of 1 st interconnect activity

10 July 2006ATLAS Plenary15

10 July 2006ATLAS Plenary16 We now have enough information to produce a consolidated plan for commissioning. Three quarters of the machine has been liberated for magnet installation and interconnect work is proceeding in 2 octants in parallel. Magnet installation is now steady at 25/wk. Installation will finish March The machine will be closed in August Every effort is being made to establish colliding beams before the end of 2007 at reduced energy. The full commissioning up to 7 TeV will be done during the 2008 winter shutdown ready for a Physics run at full energy in spring CERN management’s conclusion (Presented last week by J Engelen at the Cracow Physics at LHC conference)

10 July 2006ATLAS Plenary17 W  e Z  ee (Data taking efficiency (machine x detector) of 30% included Efficiency of all analysis cuts included)  s = 900 GeV, L =10 29 cm -2 s -1 Given this new schedule situation, ATLAS stated that the start-up strategy should be such that the useful integrated luminosity at 14 TeV at the end of 2008 will be maximized This points towards preferring a few weeks of stable running conditions at the injection energy as compared to possibly lengthy attempts to reach the maximum possible beam energy of 1.1 TeV before the full commissioning of LHC power components in the winter shut-down Primarily the run in 2007 will be a detector and computing commissioning run, much more than a physics run

10 July 2006ATLAS Plenary18 Overall financial situation (more details in the CB) Main financial framework (a simplified summary) ATLAS construction budgetinitial MoU MCHF updated baseline contributions468 MCHF Cost-to-Completion (CtC) evaluation 68 MCHF (in addition to deliverables, accepted by the RRB in October 2002 based on the Completion Plan) Main funding issues today There are remaining outstanding contributions to the baseline & Common Fund 9 MCHF Not all the calculated CtC shares have been pledged, in fact the situation only looks quite good because CERN has committed 5 MCHF more than its calculated share The following table shows the details

10 July 2006ATLAS Plenary19 Status of the Cost to Completion funding (CERN-RRB )

10 July 2006ATLAS Plenary20 Updated Cost to Completion estimates The RRB was warned in the April 2006 meeting that the ATLAS management is re-evaluating the financial situation and evolution since the CtC estimates accepted in October 2002 The situation as we understand it now is that there are new overcosts projected at the level of 4.4 MCHF for the completion, over the 68 MCHF estimated in 2002 Further delays in installation work beyond August 2007 would require additional resources for manpower to be paid (order 200 – 400 kCHF per month) SystemItem Item Over Run System Over Run System Total Cost System Over Cost MCHF % Magnet % Technical Coordination % Muon Big Wheels1.39 TCn installation manpower efforts at Point LArCC project % ATLAS % Not initially part of TCn The following table has been made by the CB Audit Group (see C Oram’s CB presentation) Largely due to the engineering contracts Workforce not available from CERN and Institutes

10 July 2006ATLAS Plenary21 Note that these overcosts could still be absorbed within the initial completion plan provided that all FAs would provide the full calculated share of the initial CtC funds, given the extra contribution provided by CERN Alternative funding schemes have been discussed with the CB Audit Group, and will be discussed in the CB meeting Restoration of the full TDR detector The RRB has been reminded regularly that for the standard LHC design-luminosity the ATLAS detector will have to be restored to its approved TDR configuration At the time of the establishment of the Completion Plan (October 2002), this was estimated to be in the 20 MCHF range (usual CORE material accounting) The ATLAS management will have to examine and coordinate plans for reaching the full detector in the coming months; we are also requested to give first indications about this at the next RRB

10 July 2006ATLAS Plenary22 Remaining is also the cash flow problem… (see M Nordberg’s regular presentations for details)

10 July 2006ATLAS Plenary23 Executive Board ATLAS management: SP, Deputy SP, RC, TC Collaboration Management, experiment execution, strategy, publications, resources, upgrades, etc. Publication Committee, Speaker Committee CB Detector Operation (Run Coordinator) Detector operation during data taking, online data quality, … Trigger (Trigger Coordinator) Trigger data quality, performance, menu tables, new triggers,.. Data Preparation (Data Preparation Coordinator) Offline data quality, first reconstruction of physics objects, calibration, alignment (e.g. with Z  ll data) Computing (Computing Coordinator) Core Software, operation of offline computing, … Physics (Physics Coordinator) optimization of algorithms for physics objects, physics channels Figure 2 (Sub)-systems: Responsible for operation and calibration of their sub-detector and for sub-system specific software TMB During this ATLAS Week it will become evident that the ‘Operation Model’ is being implemented in a gradual and pragmatic way (Details can be found at )

10 July 2006ATLAS Plenary24 Steps on the way to the gradual implementation of the Operation Model (OM) Setting up of the five activity areas: Detector operationWill evolve from the present commissioning organization which is well functional and growing TriggerWill evolve from the present TDAQ system and physics-related trigger activities, and the TDAQ management changes underway anticipate the reorganization ComputingBasically existing, OM adaptations being implemented Data PreparationIs being set up now, will regroup many present activities PhysicsBasically existing, OM adaptations being implemented An important step was the introduction of explicit combined Trigger and Physics Weeks driving this central activity for preparing the data taking era Both the cosmic ray running, gradually starting at Point-1, and the forthcoming large-scale ‘Calibration Data Challenge’ simulations can be seen as important ‘shake-down’ actions for the OM implementation We have also initiated a major effort (OTSMOU Working Group) to define the fair sharing of all operation tasks between all the Institutions, and to review the M&O sharing for the running phase This will include a definition of obligations for new Institutions joining ATLAS in this new phase

10 July 2006ATLAS Plenary25 Main goals in very general terms Get a global view of where we stand in all aspects in the preparations for our experiment Recall that global aspects concern us all, and that we need to care about much more than just the areas of our own activities  This OW should make us particularly aware of the ongoing transition from construction to operation The major focal points are clear - Completion of the construction - Assembly, integration and commissioning of the detector components - Computing and software - Trigger and physics preparation - Installation - Commissioning - In general: preparation of the operation phase Last, but not least, enjoy a stimulating and motivating time together Recalling the Goals of the Overview Weeks: