Historical Hydro-Quebec Phase II Flow and Transfer Capability Limit Data Peter Wong, ISO New England Power Supply Planning Committee Meeting June 4, 2007.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
ASM Phase II Real Time Dispatch and Reserve Constraint Penalty Factors rev2.0 NEPOOL Markets Committee June 28/29, 2005 Jim Milligan ISO-NE Markets Development.
Advanced Piloting Cruise Plot.
Chapter 13 INCOME INEQUALITY.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
1. 2 PERCENTAGE FOR IACHR IN THE OAS 2009 BUDGET (US$ 3,746,100)
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
FIGURE 12.1 Two variable process-control loops that interact.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
NECPUC SYMPOSIUM Concurrent B Natural Gas Conditions Facing New England Mark R. Babula ISO New England Inc. Supervisor - Power Supply & Reliability June.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
BALANCING 2 AIM: To solve equations with variables on both sides.
ZMQS ZMQS
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
July 11, 2013July 18, 2013July 25, 2013August 1, 2013 August 8, 2013August 16, 2013August 29, 2013September 5, 2013 September.
ABC Technology Project
Primary research figuresPrimary research figures These are some of the results from my primary research. percentages of people who like/dislike the show.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
APRIL 9-10, 2013 MARKETS COMMITTEE Christopher Parent MARKET DEVELOPMENT | Creating a tiered Reserve.
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
DRAFT Installed Capacity Requirement (ICR) and Related Values for the 2014/15 Forward Capacity Auction (FCA5) Maria Agustin.
DECEMBER 17, 2013 | WESTBOROUGH, MA Reliability Committee & Transmission Committee & Markets Committee Capacity Zone Modeling Al McBride MANAGER, AREA.
Hydro Peaking Capacity Analysis & Northwest Regional Forecast Comparison Resource Adequacy Technical Committee July 28, 2010.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Squares and Square Root WALK. Solve each problem REVIEW:
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Test B, 100 Subtraction Facts
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
Atlantic Water temperature and climate in the Barents Sea in Vladimir Boitsov, Alexey Karsakov, Alexander Trofimov Polar Research Institute of.
1 Unit 1 Kinematics Chapter 1 Day
Congestion Management Settlement Credits December, 2002.
Taina Wilhelms 1 ENERGY YEAR 2010 Finnish Energy Industries
How Cells Obtain Energy from Food
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
Energy Year 2014 Electricity Finnish Energy Industries.
Presentation transcript:

Historical Hydro-Quebec Phase II Flow and Transfer Capability Limit Data Peter Wong, ISO New England Power Supply Planning Committee Meeting June 4, 2007 Agenda Item PSPC Meeting 229 June 4, 2007

Hydro-Quebec Phase II Flow and Transfer Capability Limit Data © 2007 ISO New England Inc. 2 Historical data presented at the April 19, 2007 PSPC meeting

Hydro-Quebec Phase II Flow and Transfer Capability Limit Data © 2007 ISO New England Inc. 3 Historical HQ Phase II Total Transfer Capability and Energy Flows ISO investigated historical Phase II Total Transfer Capability and energy flows during the January 2003 through August 2006 period. Results show that when loads are at 24,000 MW or above: –The Total Transfer Capability was equal to or greater than 1,400 MW approximately 85% of the time. –There is some uncertainty with the historical Total Transfer Capability data because the default TTC is set at 2,000 MW and it is not adjusted by the operator if the expected energy flow on the HQ Phase II is low. For example, if the TTC shows a 2,000 MW value and the scheduled energy flow is 200 MW, then the operator does not check the actual limits and as a result, the TTC is not updated to reflect the actual limit. –These data are consistent with actual flow data, as energy imports from the HQ Phase II tie were seldom higher than 1,400 MW, especially at high loads.

Hydro-Quebec Phase II Flow and Transfer Capability Limit Data © 2007 ISO New England Inc. 4 Historical HQ Phase II Energy TTC January 2003 through August 2006 HQ Phase II Total Transfer Capability

Hydro-Quebec Phase II Flow and Transfer Capability Limit Data © 2007 ISO New England Inc. 5 Historical HQ Phase II Energy TTC January 2003 through August 2006 HQ Phase II Total Transfer Capability TTC (MW)Count% of TTC% Cumulative

Hydro-Quebec Phase II Flow and Transfer Capability Limit Data © 2007 ISO New England Inc. 6 Historical HQ Phase II Energy Flows January 2003 through August 2006 Energy Flow vs. NE Hourly Load

Hydro-Quebec Phase II Flow and Transfer Capability Limit Data © 2007 ISO New England Inc. 7 Graphs presented at the May 17, 2007 PSPC meeting

Hydro-Quebec Phase II Flow and Transfer Capability Limit Data © 2007 ISO New England Inc. 8 Hydro-Quebec Phase II TTC and Flow All Hours

Hydro-Quebec Phase II Flow and Transfer Capability Limit Data © 2007 ISO New England Inc. 9 Hydro-Quebec Phase II TTC and Flow Summer On-Peak Hours

Hydro-Quebec Phase II Flow and Transfer Capability Limit Data © 2007 ISO New England Inc. 10 Additional Graphs and data as you have requested at the May 17, 2007 PSPC meeting

Hydro-Quebec Phase II Flow and Transfer Capability Limit Data © 2007 ISO New England Inc. 11 HQ Phase II Flow and Transfer Capability Limit During the Top Ten Summer Peak Load Days Hours

Hydro-Quebec Phase II Flow and Transfer Capability Limit Data © 2007 ISO New England Inc. 12 HQ Phase II Flow and Transfer Capability Limit During the Top Ten Summer Peak Load Days at Hour of Daily Peak Limit Data Not Available in 2004

Hydro-Quebec Phase II Flow and Transfer Capability Limit Data © 2007 ISO New England Inc. 13 Hydro-Quebec Phase II Flow and Transfer Capability Limit Top Ten Summer Daily Peak Load Days at Hour of Peak

Hydro-Quebec Phase II Flow and Transfer Capability Limit Data © 2007 ISO New England Inc. 14 Questions & Comments ?