A presentation to the Spent Fuel Management and Nuclear Materials Working Group of the West Cumbria Sites Stakeholder Group Spent Fuel Management & Nuclear.

Slides:



Advertisements
Similar presentations
Developing a Decommissioning Acquisition Strategy for
Advertisements

Jarvis plc Interim Results 26 November Strategic Highlights Continued focus on Rail, Plant and Freight Difficult trading conditions in first half.
Performance Framework
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
Regulation of Low Level Waste Management
Prepare Strategic Business Cases for NDA Consolidate nuclear materials at Sellafield –Work underway with Sellafield Ltd. –Developing final business case.
Site Director, Trawsfynydd Nuclear Site Dave Wilson Date: 22 June 2011.
NDA’s Strategy - Update
NuLeAF Opportunities for Storage Consolidation of Higher Activity Wastes 4 th November 2011.
Overview of Environment Agency Decommissioning and Clean up programme – delivering Nuclear site restoration Peter Orr, decommissioning and clean up programme.
Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
DOE Plans for Restarting Domestic Pu-238 Production
LA LLW Arisings and Capacity Analysis Nuleaf Radioactive Waste Planning Seminar 12 th March 2013 David Rossiter Head of National Programme LLW Repository.
Optimisation of New Build Spent Fuel Management and Disposal Peter Haslam Public Policy Advisor Nuclear Industry Association 25 January 2011.
1.
WIOA Timeline and Action Plan for States
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
NDIS: Preparedness Now and Going Forward Griffith University Symposium December 2014.
Research and Development in the NDA The UK National Cleanup Programme Neil Smart Nuclear Research Coordinator, NDA.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
Sellafield Site Strategy
28th March 2013 Debbie Newton Chief Operating & Finance Officer
Remediation - A Time for Learning - A Time for Action presented by Mark Bassett, Sellafield Programme Director on behalf of Mike Weightman, Chief inspector.
Dounreay Nuclear and Chemical Land Contamination.
1 Nuclear Legacy Advisory Forum NuLeaf Presentation NDA Strategy II 20 th April 2010 NDA Programme Manager Richard Arnott NDA Head of Strategy Clive Nixon.
Long Term Storage, The Failure of the Federal Government, and NIMBY.
UK Nuclear Policy Andrew Beirne
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
CH/1 © Dr. Christian Hicks and Dr Tom McGovern An analysis of the impact of the restructuring of the UK civil nuclear industry on tier 1 and tier 2 suppliers.
The UK Nuclear Market. Paul Lester CEO Lord Mandelson Secretary of State for Business, Innovation and Skills.
Indian strategy for management of spent fuel from Nuclear Power Reactors S.Basu, India.
Nuclear program of Lithuania Dr. Vidas Paulikas, Radiation Protection Department VATESI Visaginas, 29 June 2009.
MODULE “STRATEGY DEVELOPMENT”
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
UK Cleanup Market Overview A Strategic approach to Cleanup & Hazard Reduction Nov 2010 Marcus Mackay mercury stone.
Implementing NDA’s Strategy - a year on Update to NuLeaf September 2012 Bill Hamilton, NDA Head of Stakeholder Relations.
Magnox Swarf Storage Silos Programme Decommissioning Delivery Partnership Requirements February 2014 Gavin Askew.
NuLeAF presentation Magnox ILW strategy 14 th May 2015 May 14th
Decommissioning Delivery Partnership Rebecca Weston Tuesday 11 February 2014.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Prospects for Nuclear New Build Chris Savage Nuclear Industry Association 10 th July
Current and future challenges in disposing of LLW – the LLWR perspective SAFESPUR WORKSHOP 29 April 2009 Presented By: Chuck Conway, Head of Consignor.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
NuLEAF Seminar Developing the Evidence Base – LLW arisings and the need for management facilities 22 nd March 2011 Mervin McMinn – National Waste Inventory.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
NDA PhD Bursary Spent Fuel Theme Carwyn Jones, Nuclear Technologies (representing NDA) 25 th August 2015.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
First Generation Magnox Storage Pond (FGMSP) Programme Partner Requirements February 2014 Steve Topping.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Howard Cooper Head of Quality, Sellafield Ltd The Sellafield Excellence Journey Date: 2 nd November 2011.
Nuclear Decommissioning in the UK Presented by Chris Jones.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Phil Reeve Decommissioning Head of Strategy and Technical Sellafield Ltd – Key to Britain’s Energy Future 9 April 2014.
Training for Decommissioning Author – Andy Dietzold – UKAEA Presenter – David Reay - UKAEA.
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
© Project One Consulting Limited All rights reserved. 0 Introduction to Project One Slides.
It Is a Moral Issue – Why We Should Say ‘No’ to Nuclear Andrew Blowers Presentation at Thornbury, November 2010.
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
Spent Fuel Management and Nuclear Materials (SFM&NM) July 2016 Update
PhD Bursary Scheme Rick Short, Research Manager 1
Vermont Yankee Decommissioning Update
NRC’s LLW Regulatory Program: Update of Emerging Issues
NDA Draft Strategy.
NDA Draft Strategy.
Possible Transition from Operating to Decommissioning
Amendment Invoice Task Force Progress Report
Sellafield Major Permit Review
Change Assurance Report March 2019
Challenges for Robotics in Fission
Presentation transcript:

A presentation to the Spent Fuel Management and Nuclear Materials Working Group of the West Cumbria Sites Stakeholder Group Spent Fuel Management & Nuclear Materials (SFM&NM) April 2014 Update Stan Baker, Head of Business, Spent Fuel Management

12 October Recap: The NDA Mandates given to SFM Complete the reprocessing of all Magnox fuels (Magnox Operating Programme known as MOP) –Processing of First Generation Spent Fuels which have provided significant and diverse contribution to UK and International generation capacity. Receive and process other NDA material. Complete Thorp reprocessing contracts by 2018 –Processing of Second Generation Fuels (Oxide fuels) - which have continued to provide significant contribution to UK and International generation capacity Interim safe store all remaining AGR lifetime fuel arisings –Receipt and interim storage of fuel from the current generation of UK oxide reactors. The planned lifetimes of many of these reactors are being extended Managed closure of the Sellafield MOX Plant –Plant rundown and Post Operational Clean Out of the first Sellafield MOX Plant –Available to receive Dounreay material December 2014 Hazard reduction and ongoing storage of plutonium bearing materials –Treatment of reprocessing products and storage of UK plutonium Operate the Wet Inlet Facility –The receipt and storage of material from customer

12 October SFM: A reminder of the Plants and Processes Thorp Reprocessing Plant Thorp Reprocessing Plant Magnox Reprocessing Plant Magnox Reprocessing Plant Evaporation and Vitrification Evaporation and Vitrification Conditioning and Treatment Conditioning and Treatment Dismantle AGR fuel elements Dismantle AGR fuel elements Decan Magnox fuel elements Decan Magnox fuel elements Inlet Cells (3) flasks Inlet Cells (3) flasks AGR Waste Streams Uranium and Plutonium Product Finishing and Storage Uranium and Plutonium Product Finishing and Storage Fuel Handling Plant Dungeness Sizewell Oldbury Wylfa Chapelcross Calder EDF AGR Reactors (6) Transport to Sellafield SIXEP (Site Ion Exchange Plant) SIXEP (Site Ion Exchange Plant) Conditioning and Treatment Conditioning and Treatment Uranium and Plutonium Product Finishing and Storage Uranium and Plutonium Product Finishing and Storage Waste Streams

SFM Headlines January to end of March 2014 The Magnox Reprocessing revised forecast for 2013/14 of 550Tes was not achieved due to a number of plant issues within the Reprocessing facilities. The revised year end Thorp shearing target of 335Tes was exceeded - A significant achievement in the final weeks of the financial year which saw an average of 18% uplift in AGR weekly processing rates. The AGR programme achieved its dismantling target with healthy skip stocks. Fuel receipts from the stations were disrupted during March due to a suspension in fuel movements imposed by edf to enable the re-licensing of the transport flasks. The MEB removals and Boral insert removal work target was exceeded. Progress towards achieving the ability to caustic dose the pond was recovered during the period. In the Plutonium Management Facilities Receipts of both Magnox and Thorp material exceeded the in year performance plan with sufficient product storage space available to support reprocessing. The Plutonium store consolidation programme achieved its targets early. The refills and transfers target were not achieved due to delays in the return of analytical results and delays in regulator approvals.

SFM year end summary was a challenging year for SFM -Magnox Reprocessing shutdown unexpectedly because of a blockage in the ferrous sulphamate line -An earlier than planned outage in the Thorp plant was taken in support of Evaporator C inspection -Given the above, we achieved the revised targets and continued to support the strategic imperatives of our programmes. -The blockage in the Magnox Reprocessing plant was cleared successfully -Support to high hazard reduction programmes continued -SFM Post Operational Clean Out (POCO) Operating Unit was established and is preparing for the end of reprocessing. -The Magnox throughput improvement programme (MTIP) continues to deliver enhanced risk mitigation and restore capability. -Thorp delivery assurance programme (TDAP) was created and delivered to NDA

Magnox Reprocessing Strategic Aim and Key Milestones The managed closure of the fleet of UK Magnox Stations and the receipt and treatment of other NDA material. End of reprocessing between 2017 and 2020 Impact of Performance on Strategic Aim The original target was 664Tes but this was reduced throughout the year as issues emerged with the ageing facilities. The target for this financial year of 520Tes is more realistic based on demonstrated capability and current performance when operating. The full year performance supports the range of end dates described above and exceeds the 450Tes “low case” in MOP9 Full Year Performance UnitsRevised Target 2013/14 Actual achieved Target 2014/15 Fuel Received (Tes) Fuel Reprocessed (Tes)

Ongoing Receipt of AGR Fuel Strategic Aim and Key Milestones Receipt and treatment or interim storage of fuel from EDF oxide stations. Station extensions being introduced into the plan. Receipt of lifetime AGR arisings until 2037 Implement dosing of Thorp Receipt and Storage pond in November 2018 to allow long term storage of AGR fuel when Thorp reprocessing ends Obtain licence and planning consent for long term storage Impact of Performance on the Strategic Aim The full year performance continues to underpin the Strategic aim of the AGR programme and the Thorp end-date of November 2018 Full Year Performance UnitsTarget 2013/14 Actual achieved Target 2014/15 Fuel Received (Tes) Fuel Dismantled (Tes) 180 MEB Removals

Thorp Reprocessing Strategic Aim and Key Milestones Reprocessing of UK and Overseas Oxide Fuel Complete Overseas fuel shearing (excluding MoX and PIE) by end of 2016 End of shearing November 2018 Impact of Performance on Strategic Aim The target for shearing at the start of the year was 423Tes, this was amended as the year progressed for various reasons as explained in earlier presentations The outturn was higher than expected given the operational issues experienced and continues to support the Strategic aim of completing shearing by November Full Year Performance UnitsRevised Target 2013/14 Actual achieved Target 2014/15 Fuel Sheared (Tes)

Safe Storage of Plutonium Strategic Aim and Key Milestones Treatment of reprocessing products and storage of UK plutonium Identified stores empty December 2014 Re-treatment plant available 2022 SPRS extension available 2032 and 2044 Impact of Performance on Strategic Aim Performance continues to support delivery of the key strategic milestones. Full Year Performance Plutonium Finishing Lines continued to fully support reprocessing demand, stores consolidation and cross site transfers. Sufficient product storage space available to support MAGNOX and THORP reprocessing for the financial year

Overseas Plutonium Return (SMP) Strategic Aim and Key Milestones Plant rundown and Post Operational Clean Out Operational rundown complete December 2014 POCO operations commence November 2014 Available to receive Dounreay material December 2014 Impact of Performance on Strategic Aim Programme delivery is on line to meet the key future milestones. Full Year Performance Performance continues to be in line with the schedule.

Wet Inlet Facility Strategic Aim and Key Milestones The receipt and storage of material from customer Maintain and store received fuels to ~2042 Complete transfer of fuel from old pond to new pond by 2020 Impact of Performance on Strategic Aim The flask transfer forecast was decreased to 15 following the deferral of some specific fuel consignments and the cancellation of a previously planned plant trial reconfiguration. Performance continues to underpin the strategic aim. Full Year Performance UnitsRevised Target 2013/14 Actual achieved Target 2014/15 Flask Moves (Number) 15

Operations Division Spent Fuel management is now part of Operations Division under the site’s Chief Operating Officer. The Key focus of Operations Division is to drive the completion of the Magnox and Thorp reprocessing programmes and the organisation is shaped to enable this. As the Operations Division Organisation develops individuals will be released to support the Decommissioning programme