E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 AGATA Campaign at GANIL.

Slides:



Advertisements
Similar presentations
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Advertisements

Why does ERA Need to Flourish
A 2030 framework for climate and energy policies Marten Westrup
© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
Report from: the High Intensity Stable Beam Working Group HISB-WG Marie-Helene Moscatello (GANIL) Annamaria Porcellato (Legnaro) Uli Ratzinger (GSI) Faical.
PREX main detector Piotr Decowski Aimee Shore Smith College Piotr Decowski Aimee Shore Smith College Kumar Krishna Jon Wexler Patrick Rogan Vireak Yim.
Research and Innovation Why does ERA Need to Flourish ERA - State of Play Octavi Quintana Trias Brussels, 19th April 2013.
The Implementation Structure DG AGRI, October 2005
1. Name the particles in the atom and give the charges associated with each.
Richmond House, Liverpool (1) 26 th January 2004.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Circumstellar disks: what can we learn from ALMA? March ARC meeting, CSL.
A-16 Portfolio Management Implementation Plan Update
Effectively applying ISO9001:2000 clauses 6 and 7.
TAB Data Center Renovation Project Planning for Transition of Summer 2013 February 21, 2013 TAB Atrium.
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
VOORBLAD.
Installation au GANIL Installation et campagne de physique
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
SYNTHESIS OF SUPER HEAVY ELEMENTS
Table of contents 1 Manual of Operational Procedures (MOP) 2
Weekly Attendance by Class w/e 6 th September 2013.
FUSTIPEN Topical Meeting ”Structure of the neutron star crust: experimental and observational signatures" May 26-27, 2014, GANIL, Caen, France Organizers:
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Department of Nuclear Safety and Security
E.Clément Novembre  LNL 5TC 2012  GSI/FRS 5TC+5DC 2014  GANIL/SPIRAL2 15TC AGATA D.+PRISMA AGATA + VAMOS + EXOGAM2 FRS Total Eff.
E.Clément Novembre 2011 E.Clément GANIL AGATA Days February 2013 AGATA Campaign at GANIL  Setup to be integrated  Project Organization and.
N Network for Active Targets 12 institutions (France, Spain, UK, Germany, Poland) GANIL, France CENBG Bordeaux, France SPhN/DAPNIA/DSM Saclay, France IPN.
Bordeaux Meeting June 6-7th, 2005 Meeting starts at 2:30 pm, Monday June 6th 1)Summary of EURONS meeting (February 2005, Madeira) 2)Discussion of ACTAR.
Direct Reactions at Eurisol In the light of the TIARA+MUST2 campaign at GANIL B. Fernández-Domínguez.
Rare ISotope INvestigation at GSI Status of the relativistic beam campaign Introduction Fast beam physics program Experimental methods Status and perspectives.
Superheavy Element Studies Sub-task members: Paul GreenleesJyväskylä Rodi Herzberg, Peter Butler, RDPLiverpool Christophe TheisenCEA Saclay Fritz HessbergerGSI.
N. Saito The RISING stopped beam physics meeting Technical status of RISING at GSI N. Saito - GSI for the RISING collaboration Introduction Detector performance.
AGATA Pre-processing team report AGATA Week, July 2008.
Direct Reactions with ORRUBA and GRETINA Steven D. Pain Oak Ridge National Laboratory GRETINA Workshop, ANL, February 2013.
Wolfram KORTEN, JRA-02 AGATA Irfu AGATA week, Orsay (France), January 15-18, 2007 AGATA within EURONS Objectives: Development, construction, commissioning.
Neutron transfer reactions at large internuclear distances studied with the PRISMA spectrometer and the AGATA demonstrator.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
AGATA The Advanced Gamma Ray Tracking Array Ancillary Detector and Integration W.G. Status of the Working Group and Tasks A.Gadea.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
The Stripping Foil Test Stand in the Linac4 Transfer Line
R&D on complementary detectors and devices for nuclear structure and reaction mechanism studies R&D on complementary detectors and devices for nuclear.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
2010  LNL 5TC 2012  GSI/FRS 5TC+5DC 2014  GANIL/SPIRAL2 15TC AGATA D.+PRISMA AGATA + VAMOS + EXOGAM2 FRS Total Eff. InFlight ~ 10% Total Eff.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
Status on the HYDE project Collaboration: University of Huelva, Spain (coordinator) GSI-Darmstadt, Germany. University of Sevilla, Spain. CSIC-IEM Madrid,
Experiment Readiness Review P. Rossi – Hall C Coll. Meeting Jan 21, 2016.
VAMOS « Hot » results and perspectives * Spectroscopy of n-rich nuclei produced by fission * New gas-filled spectrometer-separator for fusion Getting ready.
© 2003 By Default! A Free sample background from Slide 1 JINR SCIENTIFIC COUNCIL 102 nd Session, September 2007, Dubna.
E.Clément Novembre 2011 AGATA : Organisation of the campaign and technical aspect GANIL SC- September 2013.
EURISOL DS Task 11.2 Universidad de Santiago de Compostela, Spain Eurisol DS: task 11 meeting March‘05.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Ancillary/Complementary detectors for the AD at LNL.
ELENA installation progress F. Butin / ELENA collaboration.
Entry distributions for fragments produced in deep-inelastic collisions with stable and radioactive beams For the PARIS collaboration W. Królas, M. Kmiecik,
Complementary detectors for campaign
for the EURISOL Steering Committee
Status of the AGATA installation at GANIL
for the LNL-Ganil collaboration
working group activities overview
AGATA Campaign at GANIL Scientific Goals
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Status of the AGATA installation at GANIL
Decay spectroscopy with LaBr3(Ce) detectors at RIKEN and GSI
AGATA Today at GANIL 12 Triple Cluster and 1 Double Cluster (38 detectors) on site ATC1 core B oscillating after capsule change ATC9 core B : high Voltage.
Ch. THEISEN – CEA Saclay MUSETT: the segmented Si array for the focal plane of the VAMOS spectrometer Ch. THEISEN – CEA Saclay.
Recent Highlights and Future Plans at VAMOS
Presentation transcript:

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 AGATA Campaign at GANIL

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 Outline  Status of AGATA  Preparation to the GANIL campaign  Performances simulations of the AGATA array  Project Organization and Planning  Report of the working Group

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February  2012 LNL : 5TC AGATA D.+PRISMA Total Eff (compact). ~6% Status of AGATA: LNL Campaign in Lifetime measurement of the 6.79 MeV state in 15 O. The energy and angular resolution of the AD will allow to reach a lifetime measurement in the fs range C. Michelagnoli et, in preparation C. Louchard et al, to be submitted Successful demonstration phase with a limited number of detectors concluding a long period of R&D (~ 70 NIMA papers in ~ 10 years ( ) ) First physics results are submitted or drafted within the collaboration

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February  GSI/FRS 5TC+3 DC AGATA D.+PRISMA FRS Total Eff. (  =0.5) ~ 10% Total Eff (compact). ~6% 35 LoI have been submitted in May 2010 Conveners: M. Bentley, W. Korten 144 shifts (46 days) have been allocated 4 Weeks of data taking from October to November several commissioning runs Workshop hold in December for the second beam period New proposals submitted for 6 weeks Next beam time in November-December 2013 (…2014)  Quadratic evolution of collectivity in the 208 Pb vicinity (S429)  The Pygmy Dipole Resonance in 64 Fe and the properties of neutron skin (S430)  Coulomb-excitation of the band-terminating 12 + yrast trap in 58 Ni (S433)  Shape evolution in very-neutron rich Zr isotopes (S428) 2010  2012 LNL : 5TC Status of AGATA: GSI Campaign in

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 GSI Beam time 19/20 crystals running 21 channel fully instrumented 29 th of January 2013  32 capsules have been produced  24 are operational  3 to be fixed after failure  5 waiting to be fixed after LNL annealing Status of AGATA: the array  The remaining 4 electronic chains in final stage of test  25 capsules fully instrumented with electronic version 1 for 2013  End 2012 : 3 more capsules have been ordered by IN2P3 (2) and Spain (1)  By end of 2013 : 35 capsules  By the end of the GANIL phase  1  45 capsules) New electronic to equip the next 20 capsules (1  ) Padova and Orsay designs evaluated by 7 international experts Padova electronic choosen in Autumn 2012; to be delivered in mid-2013

E.Clément Novembre 2011 Preparation to the GANIL campaign E.Clément GANIL Scientific Council February 2013

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 : Campaign spokesperson : S. Lenzi (Univ. Padova) Call for LOI sent in October 2012: dead line 8 th February st workshop on the18 th - 20 th of February organized at GANIL,dedicated to the physics of the GANIL Campaign using stable and radioactive beams (SPIRAL1)  Create the basis for defining the priorities for a detailed scientific program of the campaign  Assess the technical feasibility, constrain the infrastructure and ancillary detectors integration.  Identify common setup to be run in a row or physics case and collaborations  A summary of the physics objectives will be presented at the next SC for evaluation  1 st PAC including AGATA proposal  13 th AGATA week organized on the next 20 th -22 nd of March at GANIL The GANIL Campaign 2014  VAMOS cave toward 1 

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013   -ray spectroscopy of very neutron-rich nuclei populated in Deep Inelastic Collisions or induced fission using VAMOS to identify the reaction products in Q, A and Z.  Spectroscopy of heavy elements towards SHE and N=Z nuclei populated by fusion –evaporation with VAMOS in gas-filled mode.  Spectroscopy at high spins after fusion-evaporation  Spectroscopy of  -rich nuclei at the N=Z line using the Nwall and DIAMANT  Spectroscopy using existing and new SPIRAL1 beams  Ensuring these physics cases with the appropriate ancillaries detectors  Mechanical integration

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013  Charged particle array for transfer reaction MUST2/TIARA : (d,p) etc … program with SIB and RIB  Charged particle array for prompt tagging : DIAMANT  Neutron detector (Nwall)  Charged particle array for Recoil Decay Tagging : MUSETT  Scintillator : BaF2 array, LaBr3  Future detector : NEDA (n), GASPARD ( ?), PARIS (LaBr3) In G1 coupled to VAMOS (+ EXOGAM2): SIBs, RIBs AGATA 1  at GANIL : Ancillary devices At 0° as separator (vaccum/gas-filled) Angles >10 deg for fission & MNT

E.Clément Novembre 2011 VAMOS The VAMOS spectrometer is expected to play a major role in the campaign  Upgrades are still possible in the dispersive mode as magnetic spectrometer  Fully operational now ( M. Rejmund et al, NIM A 646 (2011) )  A test in gas-filled mode has shown the competitivity of the setup  Optimum configuration to be funded ANR (French Research Funding Agency) request for the gas-filled mode submitted by the Saclay and GANIL group (PI : Ch. Theisen & Ch. Schmitt)  If funded in 2013, should be operational mid-2015 E.Clément GANIL Scientific Council February 2013

E.Clément Novembre 2011 Performances simulations of the AGATA array E.Clément GANIL Scientific Council February 2013

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 J. Ljungvall (CSNSM) M. Labiche (STFC) for the AGATA collaboration - Preliminary × ~ 1.25 × ~ 1.5 AGATA nominal 233 mm EXOGAM nominal 145 mm Performance of the AGATA array  AGATA should leave GSI with a minimum of 25 capsules (5ATC + 5ADC) fully instrumented  Additional detectors will be delivered during the campaign  End of the campaign : 45 capsules covering 1  LNL phase GSI phase

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013  =12% More than efficiency, AGATA provides higher sensitivity × ~ 4.7 × ~ 12 Performance of the AGATA array

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 EXOGAM, LaBr3, BaF2 … AGATA Configurations at GANIL E. Farnea et al, Nuclear Instruments and Methods in Physics Research A 621 (2010) 331–343

E.Clément Novembre 2011 Project Organization and Planning E.Clément GANIL Scientific Council February 2013

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013  Local organization done  Tasks distribution and their detailed description were distributed  GANIL project : Set of spec delivered, detailed planning, resources evaluation, budget, development plan, PBS, WBS distributed  Security/safety : Installation description for DIRC01 :  1 st draft released, risk analysis beginning of 2013  The call for tender, to be launched by May 2013 after GANIL management review, are under preparation  Specific infrastructure to be delivered in December 2013 In 2012, ~4 FTE have worked on the project (20 persons involved at GANIL) For , ~80 m.month are evaluated Organisation

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 Schedule (assuming that material from GSI arrive on Jan-Feb 2014) Gas-filled installation expected in mid-2015 if funded in 2013 GANISOL beams available for physics beginning of 2016 No SPIRAL1 beam in GANIL has requested the host of AGATA until end of 2016 T2-12T3-12T4-12T1-13T2-13T3-13T4-13T1-14T2-14T3-14T4-14…T4-16 Mechanics STFC Design GANIL Impl IPHC construc Mounting Infrastructure det GANIL Studies Collecting items Installation LN2, AF GANIL Studies Collecting items InstallationTest DAQ Hardware GANIL Studies Collecting items InstallationTest DAQ Software Prep. Test Processing Room Renov Aire Proj AGATA infra Detector Mounting Source & Commi Expt …

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 ~150 k€ ~17k€ Processing room 019 Upgrade ~ 102k€ Detector lab infrastructure ~15 k€ Cryogenic upgrade, connection ~25 k€ Total investment cost ~380 k€ Optical fibers links ~70k€

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 Budget : Total cost investment ~380k€ 237 k€ guaranteed by GANIL for 2013 to be completed in the 2014 request IPHC requested 90k€ from IN2P3-AP for the mechanic ANR (French Research Funding Agency) request for the gas-filled mode submitted by the Saclay and GANIL group (PI : Ch. Theisen & Ch. Schmitt) Loan of material from LNL & GSI (cooled cabinet, racks, water distribution, Optical link) under evaluation

E.Clément Novembre 2011 Report of the working Groups E.Clément GANIL Scientific Council February 2013

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013  Detectors support design done by STFC Daresbury in close collaboration with GANIL  GANIL designs the additional platform  GANIL takes in charge the integration work  Projection T  9 months of construction estimated starting by T On-going collaboration with the IPHC workshop for the construction of the support Workshop for the extended platform not yet defined I. Burrows (STFC) M. Ozille, P. Gangnant (GANIL) Mechanic

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 I. Burrows (STFC) M. Ozille (GANIL) G. Gaudiot (IPHC) Mechanic  First 2D projections have been released in January  On-going validation and fine cost estimate  Mechanical stress and rigidity calculations validated

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 M. Ozille (GANIL) Mechanic

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 M. Ozille, P. Gangnant, G. Fremont (GANIL)  GANIL is in charge of the beam section and target chamber design for most of the experiment  Specific configuration will be treated case by case  Target loader : Detailed design on going by GANIL Final decision will be taken after the physics workshop Target loader and beam line

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 Salle G1 AGATA EXOGAM Elec. AGATA Elec. DSS 300 optical wires Water cooling 26° 8 bars 27 kW UPS L. Menager, J. Ropert, JL. Foucher (GANIL) Integration Cryogenic distribution

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 L. Menager, M. Jean, N. Menard (GANIL) The foreseen room required important investment (refurbishment, electricity, water cooling, air conditioning …) G1 cave Integration

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013 Performance simulations :on-going (final release in February) Electronic coupling: on-going (several meeting already done, transfer of knowledge in GSI during 2013) Detector:starting (transfer of knowledge in GSI during 2013) Data flow, DAQ:on-going (several meeting already done, no problem anticipated) Mechanic design : on-going (final design review) Optical link :on-going (purchase order expected on April) Data analysis :starting (first meeting on the first week of Dec.) AutoFill-cryogenic :on-going (definition of the installation, call for tender in April) Infrastructure :on-going (needs identified, final design review on going)

E.Clément Novembre 2011 Conclusion E.Clément GANIL Scientific Council February 2013  The AGATA physics prospective is on-going and physics objectives will be presented at the next CS for evaluation after the workshop organized in February 2014-mid 2015 : AGATA-VAMOS+ “light” ancillary 2015 : gas-filled, NWALL 2016 : SPIRAL1 beams  The AGATA project at GANIL made progress in all different items with a particular attention on the mechanic and the integration  The transfer of knowledge on detectors and electronic will be organized in 2013 during off and on- beam period at GSI with GANIL technical staff.  Mechanical construction should start soon, delivery by end of 2013  Call for tender are expected to be sent by May 2013 for infrastructure  Data Acquisition and Data analysis preparation will progress over 2013  GANIL technical involvement is already significant  Budget guaranteed by GANIL for 2013 to be completed in the 2014 request

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February TC 11 Without tracking E. Farnea et al, Nuclear Instruments and Methods in Physics Research A 621 (2010) 331–343

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013

E.Clément Novembre 2011 E.Clément GANIL Scientific Council February 2013