P2P R12 Go Live Plan P2P R12 Upgrade – Go Live Plan.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

LEUCEMIA MIELOIDE AGUDA TIPO 0
Weather Discussion Synopsis Final check-up on Hurricane Adrian NC weather conditions from 6/9 (Thursday) through 6/14 (Tuesday)
Weather Discussion August 11-16, Chaff detected by Jacksonville, FL radar…
Chapter 1: Introduction to MYOB Accounting Plus
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Munich, 21. – 23. October 2005 Welcome to the UEMS Management Council Meeting 2005.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
ENTREPRENEURSHIP (Ms. Hawkins)
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 8 Purchasing/ Human Resources/ Payment Process: Recording.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
1 Lisa Alexander and Helen Dennis April 16, 2008 Data Updates/Data Review Form District Test Coordinator Meeting.
Frigid Fridays On each Friday last January, the temperature was a record low temperature for the date. On Friday, January 30, the mercury dropped to 5°F,
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Year 6 mental test 5 second questions
ZMQS ZMQS
End of financial year procedures.
Weather diary 31ST March-6 April hungary,Marcali.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Payment & Remittance Processes
1 CIFTlab1.2 Software for Clinical Diagnostic Laboratories 1.
FAMIS Library Module (FLM)
Ultriva Users Conference 2012 RTS And Pick List Presented by Nandu Gopalun.
ABC Technology Project
Day of the week 9:00 – 10:00 10: :00 12: :00 13: :00 14: :00 15: :00 16:00 – 17:00 17: :00 18:00 – 19:00 19:00 – 20:00.
1 Contract Inactivation & Replacement Fly-in Action ( Continue to Page Down/Click on each page…) Electronic Document Access (EDA)
MONDAY TUESDAY WEDNES THURSDAY FRIDAY SATURDAY SUNDAY APRIL 2013 SPRING.
© S Haughton more than 3?
VOORBLAD.
1 Payroll Coordinator’s Meeting Judy Golisch Spring 2014.
1 Displaying Open Purchase Orders (F/Y 11). 2  At the end of this course, you should be able to: –Run a Location specific report of all Open Purchase.
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Squares and Square Root WALK. Solve each problem REVIEW:
We are learning how to read the 24 hour clock
LESSON 4-1 Preparing a Chart of Accounts
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Januar MDMDFSSMDMDFSSS
Week 1.
20&27 May Agenda 1.Highlight the difference between system flow of e- Invoice and paper invoice – 15 minutes 2.Demonstrate the operation procedure.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
First Kicks is all about having fun playing Soccer. It is an excellent program to introduce your child to the wonderful sport of Soccer. The program allows.
09:00 – 13:00h 13:00 – 17:00h 17:00 – 21.00h 20:00 – 22:00h TRAINING ROUND AMBIENT MUSIC TRAINING ROUND DJ “CHERYL DANGER” SUNDAY 20th AGENDA Approximate.
FINAL EXAMINATION SCHEDULE SPRING 2009 MAY 15 – MAY 22 NOTE: A class that meets at more than one of the times on this final examination schedule will take.
© ABB University - 1 Revision C E x t e n d e d A u t o m a t i o n S y s t e m x A Chapter 20 Import and Export Course T314.
ALL 2014 FIFA WORLD CUP BRAZIL GAMES SHOWN here at the THE FRONT PAGE DC!
Test Information Distribution Engine (TIDE) Copyright © 2014 American Institutes for Research. All rights reserved. Training Module.
FISCAL YEAR END CLOSE AND ACCRUALS Presented by Laura Putz & Doug Nelson April 12 & 13,
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
Presentation transcript:

P2P R12 Go Live Plan P2P R12 Upgrade – Go Live Plan

Go Live Plan  Monday 7 th July : BAU transaction clearing completed by MOD. Final BLTs, Catalogue Load, Category Loads and Inventory Inbound Errors to be resolved 17:00 – Final Emerge Catalogue Upload to P2P 18:00 – Access to P2P is removed for P2P users 18:01 – Final Inbound Files received in P2P (Inventory POs, Inventory Receipts, Purchase Order Acknowledgements, Invoices, Supplier etc) 18:01 – Final Outbound Files sent out of P2P excl Pay Run (Purchase Order Outbound, Purchase Order Change Order etc) 18:30 – Access to P2P is granted to approx 10 SMEs Evening – take full back up of P2P in case a restore is necessary.

Go Live Plan  Tuesday July 8 th : SME Users perform Pre-Upgrade Checks and Reports. This will include the Final Pay run in P2P. Tuesday 8 th : 2:00pm (or as soon as afterwards) P2P will be given to Capgemini to begin the upgrade tasks Tuesday 8 th : Capgemini begin upgrade  Tuesday 8 th to – Sunday 13 th: Capgemini upgrade P2P Go Live Plan

 Sunday 13 th July 8:00 pm Initial access checks to be performed by Senior User and DePS EBO – Atlas on standby  Monday 14 th July: MOD SME users perform post upgrade checks Run initial interfaces with limited records Perform access & desktop checks – Atlas on standby  Monday 14 th /Tuesday 15 th Decision to open system to all P2P users  Tuesday 15 th System open to all Users

Go Live Plan  Tuesday 15 th July – Friday 18 th July : Feed interfaces through  Friday 18 th July : 18:00 – System down for Discoverer upgrade  Saturday 19 th July : Discoverer upgrade by Capgemini Run first Sub Ledger Accounting (SLA) Loads  Sunday 20 th July : MOD users Test Discoverer  Monday 21 st July : Discoverer available to MoD Users Agree further SLA load schedule