GB Queue The GB Queue – Problems and possible solutions Mark Copley.

Slides:



Advertisements
Similar presentations
Innovation Procurement Reflections on the Development of a Swedish National Policy for Innovation Procurement Göran Marklund Head of Strategy Development.
Advertisements

July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Competition Effects of the Renewable Energy Policy Reform in Flanders: Is the Flemish market for Green Electricity Certificates working properly? Annemie.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association.
Offshore Transmission Giles Stevens Head of offshore electricity transmission.
Review Group 0166 Review of Necessary Reform of NTS Offtake Arrangements 20 th September 2007 Beverley Grubb SGN.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Grid Issues Charles Davies Commercial Director, National Grid Company British Wind Energy Association April 2002.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
Exchange A1: The support required to make Energy Performance Contracting a viable energy and carbon solution (TEC) Steve Creighton, Senior Relationship.
Structure of Distribution Charges A User’s perspective David Tolley Innogy & Npower.
Grid Connections: Now and the Future Patrick Smart Head of Commercial and Regulatory 10 th November 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Congestion Management by distribution FEBEG POSITION Meeting FEBEG-VREG ( )
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
John Zammit-Haber National Grid
Zone Merger – learning from experience and developing an evidential based approach Target Model Workshop 3, London 11 April 2011 Nigel Sisman Senior Adviser.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Low Carbon Energy Futures workshop Alison Lax Project Manager – Low Carbon Communities.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Gas & Power Coordination: Growing Pains in Time of Transition Mark Stultz, BP Natural Gas Supply Association OPSI Annual Meeting Chicago, Illinois October.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Marketing Ethics and Social Responsibility
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
Monitoring as a key tool to improve energy policy & markets Cristina Cifuentes, Commissioner, ACCC/AER.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Cross Border Balancing - 2Hr Product NGET and RTE Paper.
ARODG - 2 An overview of transmission access arrangements Mark Copley & Colin Sausman 1 st and 2 nd February 2007.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
THE ECONOMIC FEASIBILITY OF POWER PLANT RETIREMENTS ON THE ENTERGY SYSTEM Presented to the LOUISIANA PUBLIC SERVICE COMMISSION November 9, 2005 Open Session.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Outline The key findings What the SGA Summit did Smart City Amsterdam Some more detail on the disrupters – Ecosystem of the Grid – Distributed Generation.
The Business Plan: Creating and Starting the Venture
Structure of Charges Year-end review for DCMF 22 November 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
Copyright © 2012 Pearson Canada Inc. 00 Chapter 11 Alliances as Vehicles.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Optimisation ARODG Seminars Glasgow & London February 2007.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
National Grid - Key Challenges Beijing 24 October 2005 Alan Smart Optimisation & Risk Manager UK Transmission.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Chapter 10 Personnel Procedures and Practices. Human Resources Perspectives Lack of attention to the needs of employees can have dire consequences for.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Presentation at REEEP Regulatory Forum, 28 September 2004
An alternative approach…..
Review Group 291- Ofgem Update
Statement of Works (SoW)
Conducting a Feasibility Analysis and Designing a Business Plan
Development of Entry Capacity Substitution
Transmission Workgroup 6th March 2014
Review Group 291- Ofgem Update
Transmission Workstream – Partial Assignment
Commercial Arrangements For Gas Quality Service – Introduction
Presentation transcript:

GB Queue The GB Queue – Problems and possible solutions Mark Copley

GB Queue Purpose  To provide background to the GB Queue  To discuss the reasons for the queue  To assess the undesirable incentives that may exist  To question whether proposals on the table will address any of these incentives  To prompt discussion on what else needs to be done

GB Queue The Queue  NGET issued 13.2GW of offers  To over 165 projects  A series of sequential reinforcements are needed  Connection is not possible in some locations until 2016 and beyond

GB Queue The problem – At a high level  Unprecedented demand for network capacity in areas of the system with relatively little transmission.  Need for significant system upgrades before this generation can connect  Upgrades take time to receive planning consents and be completed  Offers were made on a first come first served basis which doesn’t reflect the viability of projects  Significant risk that efficient projects cannot connect  Risk that transmission licensees invest inefficiently.

GB Queue The causes – In more detail  Poor information for transmission licensees –No information from existing parties –A place in the queue is frequently a costless option  Inability for the most viable projects to identify themselves –Either by trading with existing parties, –Buying a less firm/ restricted right style access product, –Advancing their connection date if capacity becomes available

GB Queue The causes (2)  Inflexible market rules –Arrangements do not promote flexibility. Incentive not to reveal information as it’ll lead to a new offer with a post 2016 connection date.  An overly lenient approach to managing contracts? –Should NGET take a more hands-on role in managing contracts?  Increasing volumes of distributed generation? –Is there a discrepancy in treatment?

GB Queue Progress to date Potential ProblemPossible SolutionComments Poor information on which to invest CAP131 – Generic user commitment 6 years commitment from new connectees, 2 years from existing A place in the queue is a costless option CAP131 – A non-refundable holding fee Limited trading opportunitiesNGET developing proposalsSee Adam’s presentation Limited range of access products CAP143 – ITECIs there scope for others to be developed No opportunity to advance dates if capacity becomes free NGET consulting on optimisation shortly How do we ensure full industry involvement? Inflexible market rulesTO BE DEVELOPED?Work ongoing Contract managementNGET to take a more hands-on approach? Is this what users want? Probably a compliment to flexibility.

GB Queue Questions for discussion  Have we correctly characterised the problems?  Are any recent developments likely to address them?  Are there any other issues to address?  What role should Ofgem/ transmission licensees/ industry play in this process?

GB Queue Promoting choice and value for all gas and electricity customers