Stability Tools TPM What is TPM ?

Slides:



Advertisements
Similar presentations
Airbus Production System
Advertisements

MAINTENANCE PLANNING AND SCHEDULING
Total Productive Maintenance
MAINTENANCE MANAGEMENT Module 9
Total Productive Maintenance
KPI Familiarisation.
Stability Tools 5S How do we do a 5S Sort ? What is 5S ? Why use 5S ?
Intracompany Stock Transfer Scenario Overview
LOCKOUT TAGOUT Introduction Each year nearly 150 people die because there was a failure to control energy.
Powerfully simple work management Software for an organized, engaged and productive workforce.
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
MSE507 Lean Manufacturing
Business Studies Grade 11.
Lean Management Systems & Standard Work for Leaders
Total Productive Maintenance OVERVIEW. Target Audience : Senior Management Purpose of Module : To understand the need for TPM and the commitment required.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Computerised Maintenance Management Systems
Key Performance Indicators - KPI’s
Effectively applying ISO9001:2000 clauses 5 and 8
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
Total Productive Maintenance (TPM)
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
S/W Project Management
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
Chapter 4 5S.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
Micro sites Basic training guide. Welcome to your Micro site. Here you can create your own personal page within the Countrywide website. When you first.
Event Management & ITIL V3
Visual Management Quick Review
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Project Tracking and Monitoring QMS Training. 2 Objective To track and monitor the progress of the project and take appropriate corrective actions to.
Continuous Improvement Story Cover Page The cover page is the title page Rapid Process Improvement Story Template O Graphics are optional This CI Story.
Total Productive Maintenance (TPM)
CALIFORNIA DEPARTMENT OF EDUCATION Tom Torlakson, State Superintendent of Public Instruction Special Education Self Review (SESR) Activity Three: Corrective.
Process Confirmation & Go, Look, See. Agenda Introduction to Process Confirmation The Format Completion Example Deliverable Go, Look, See ‘T’ card system.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
PMO2000™ 1 Improved Reliability through PM Optimisation Project Team: Electrician Planner Mechanic Operator Reliability Engineer.
Session 5 Review A3 progress Error Proofing Visual Control Workplace organisation Standard Operating Procedures.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
(Project) RISK MANAGEMENT PROCESS SEPTEMBER 5, 2008.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
Project Plan Tracking – Fundamentals Lesson 8. Skills Matrix SkillsMatrix Skill Establish a project baseline Track a project as scheduled.
1 End User Support Introduction Identify and select remedies.
1 eCoRepair New Release Slide Expanded view of Circuit Details Change to Circuit Looping text4 View of closed faults up to 30 days old5 - 7 Minor.
Project Management Training
Computerised Maintenance Management Systems
Working with Resource Pools Lesson 16. Skills Matrix SkillsMatrix Skill Develop a resource pool View assignment details in a resource pool View assignment.
KANZEN INSTITUTE ASIA PACIFIC 1 What is OEE ? OEE Overall Equipment Effectiveness Why is a high OEE important for the department ? OEE Calculation How.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Causal Analysis & Resolution (CAR) Support Category
Maintenance Scheduling
RCM Turbo SQL Version.
TOTAL Productive MAINTENANCE
IMPLEMENTATION OF EIGHT PILLARS THE TOTAL PRODUCTIVE MAINTENANCE AT WATER SUPPLY COMPANY Iswandi Idris Ibrahim Ruri Aditya Sari.
MAINTENANCE PLANNING AND SCHEDULING
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Total Productive Maintenance and Quick Changeover
Mastering Change Control
Value Stream Mapping (VSM) Training
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
KPI Familiarisation
TPM Definitions Goals and Benefits Components GEOP 4316.
PREVENTIVE MAINTENANCE
Two methods to observe tutorial
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Approving Time in Kronos Manager/Supervisor Reference Guide
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Presentation transcript:

Stability Tools TPM What is TPM ? TPM stands for Total Productive Maintenance and covers two main types. Planned Maintenance:- Major activities carried out by the plant maintenance team at set intervals to prevent known failure conditions from occurring. Autonomous Maintenance:- Minor maintenance activities such as checking, lubrication and minor adjustments. All tasks carried out by the operators in their cell. Why do we need TPM ? Using TPM enables us to monitor our equipment and escalate concerns prior to failure. It encourages ownership through learning, as each operator is trained in the maintenance requirements for their particular process. TPM’s main objectives are: to ensure a quality product is produced repeatedly, and at the required volumes with the correct level of investment. Planned Maintenance Tools There are three main tools required to ensure that we have a robust Planned Maintenance System, and they are:- Detailed Standards of how to carry out maintenance activities. These standards will usually be supplied by the Equipment manufacturer and held in a known location for reference, or will be written by the maintenance department using the Standard Work Format, where manuals are not available. Visual System to show which tasks are due and when, and a reference document to show who is the best resource to achieve a timely completion. This type of visual system is known as “Kamishibai” which translated means “Story by Cards”. A predictive system which relies on the inputs of those persons carrying out the checks to ensure relevant information is produced. This system analyses breakdowns by equipment type and failure mode. The system then informs the maintenance department of the required frequency with which to carry out specific tasks. Verto Laurus Consulting

Stability Tools TPM - Cont What Does the Visual System Look Like ? Each planned maintenance task is transferred to a T-card. On this card is the following detail:- Spares & Tooling Requirements – Which spare parts or tooling are required to carry out the task successfully. This can also be linked to the predictive database and x-references with the stock levels to ensure all spare parts are or will be available and that all tooling will be in a serviceable condition for the due date of the check. Repair Manual Location – The repair manual will normally be the product manual supplied to the maintenance department by the Original Equipment Manufacturer (OEM). If there is no written standard from the OEM then a set of Standardised work documentation will be written by the Maintenance department. This documentation will detail how the task should be carried out using work element sheets to support. The reverse side of the card is similar to the front red side except for its colour which is green and an area detailing the next due date for the check and who carried out the last check. Task Description Card No Frequency Spares Required Tooling Required Repair Manual Location Your Logo Task Description – Exactly what the equipment is and what is to be checked. Card No – Each card is individually numbered and is used when frequency updates are flagged by the predictive computer system. Frequency – How often the check should be carried out to prevent failure. Verto Laurus Consulting

Stability Tools TPM - Cont Visual Display of Work Cards Every time a work task is completed by an operator the card should be turned over to display the green side of the card. This then highlights at a glance which tasks remain unfinished. Each column is reviewed by the maintenance manager at the end of the working week. All cards which remain RED are interrogated as to why the work was not carried out as planned. All Green cards are then reviewed for their next due date, in 1 week to 1 year. The card is then moved to its next due dated slot and turned to the Red side to show that it is a due task. The board should never display a Green card in any other week than the current working week. Blue cards are for outside contractors and should only be displayed for planned repetitive maintenance activities. The reverse of this card is again green to highlight completion. The Blue cards are usually placed against supervisory positions, this is mainly for performance tracking purposes. Red = Work task to be completed Green = Work Task completed Blue = Outside Contractor How the visual display system works Each column of the visual display board represents a one week period. Each row of five slots across the board represents an individual maintenance technicians workload. The work cards are usually distributed by skill set, electrical, mechanical, hydraulics etc. These skill sets are visually managed by the use of a core skill versatility matrix which should be displayed next to the work card board. Verto Laurus Consulting

Stability Tools TPM - Cont What Does Autonomous Maintenance Mean What do the sheets look like ? The definition of Autonomous is – Self Reliant. Therefore this level of maintenance focuses on the owner or user of a piece of equipment to monitor and conduct basic maintenance tasks. This aim of this Element of TPM is to reduce minor stoppages and to give advanced warning of known failure types thus reducing product defects and equipment downtime. The checks and maintenance tasks which are to be carried out by operators are simple but important. Failure to execute these checks regularly can and will result in preventable downtime. The checks are designed by the maintenance department based upon their current knowledge of regular concerns and their occurrence frequency. All checks are recorded on a common TPM schedule for the area and signed off as completed at the end of shift. Maintenance Check Sheet The detailed check sheets are placed in the back of each standardised work process folder. This ensures that as part of the operator’s standard training all TPM checks are covered and understood. Your Logo Each check has a photograph or drawing of the piece of equipment to be checked, with numbered arrows pointing to each check area and corresponding to the numbered check item detail on the right hand side of the sheet. Each detailed check item then has its frequency placed in the far right hand column. Verto Laurus Consulting

Stability Tools TPM - Cont TPM Check Schedule The schedule covers each check to be carried out over a one month period by the entire team. Obviously this depends upon the size of the team. When the team leader to operator ratio of 1:5 – 1:8 has been exceeded then more than one schedule may be required. Green – Ok; no problems can be seen or task has been carried out successfully. Orange – An issue has been found whilst carrying out a check. This issue will not cause imminent failure or a stoppage but if not addressed within the next day could result in equipment downtime. Red – A critical failure was highlighted and maintenance were called immediately. At the end of each shift the team leader signs off on all checks to ensure that they have all been carried out as planned. These documents are handed back to maintenance at the end of each month for data collection, and the new sheet is placed at the team board or on the relevant piece of equipment. New or re-occurring problems are dealt with via the problem and countermeasure meeting to help reduce or eliminate the problem or it’s effects. Your Logo As each check is carried out at the desired frequency then the circle corresponding to that check is coloured in one of the following colours. Verto Laurus Consulting

Stability Tools TPM - Cont The maintenance manager then conducts a weekly walk of all production areas to review maintenance issues with all areas. During these walks all visible red tags will be reviewed as to their date of placement. Any tags which have not been addressed, which means work is in progress or completed, will be escalated at the next maintenance shift handover meeting. The outcome of this meeting will be fed back immediately to the team leader. TPM Tag System The Tag system has been developed to enable communication on non critical issues. The Tag is supplied in one piece and is perforated through the middle. The top half and bottom half of the tag hold duplicate information and are completed by the team leader on notification of an orange mark on the schedule or via an Andon call from an operator. The top half of the Tag is tied with a piece of chord to the piece of equipment with the concern. The tag must be tied as close as is feasibly possible to the failing area so as to act as a visual guide to the assigned maintenance operator. The bottom half of the Tag is then torn off and taken to the maintenance post box at the end of the shift. Maintenance review the post box at the start of the next shift and assign the Tags to a technician with the relevant skill sets to carry out the task to the required standard. Once the task has been completed successfully the Top half of the Tag is removed and signed off by both technician and the Team leader for that area. Verto Laurus Consulting