BS 8545: From Nursery to Independence in the Landscape Keith Sacre. Sales Director Barcham Trees.

Slides:



Advertisements
Similar presentations
COMMISSIONING IS CHANGING! Feedback on the Deanerys annual Commissioning Visit process over recent years has demonstrated that it provides a comprehensive,
Advertisements

HELPING THE NATION SPEND WISELY Performance audit and evaluation: common ground with Internal Audit ? The UK National Audit Office experience Jeremy Lonsdale.
Options appraisal, the business case & procurement
Barhale Procedure for Site Establishment
Strengthening our Community Tree Canopy Through Education Module #8: Transplanting Trees & Palms in the Urban Landscape Laura Sanagorski, Environmental.
Independent schools inspection annual conferences 2014 Bradley Simmons, National Director, Independent schools John Seal HMI, Special Advisor to Independent.
Health and Social Impact Assessment of the South East Queensland Regional Plan NSW HIA Colloquium Sydney, 9 December 2006 Kate Copeland, Director, Statewide.
Assessment and eligibility
Urban Forest Hurricane Recovery Program
 The ideal time to plant trees and shrubs is during the dormant season-fall after leaf drop or early spring before bud-break.  Weather conditions are.
Tree Planting MMXI.
1 Strategic Environmental Assessment and SFs Operational Programmes: An assessment Jonathan Parker DG ENV ENVIRONMENT EUROPEAN COMMISSION Aarhus Workshop.
Keith Sacre, Barcham Trees PLC Keith Sacre, Sales Director Barcham Trees PLC Nursery Production Methods and their Impact on Transplanting Success.
Landscape Pitfalls Myths, Mistakes, and Misconceptions.
Planting & Care Guide for Your Pawpaw Trees We want to give you the best and most complete information possible to ensure your success in growing and enjoying.
Report Writing Unit III. What is a business report?  A business report is an oral presentation or written business document that provides information,
Project Monitoring Evaluation and Assessment
© Grant Thornton UK LLP. All rights reserved. Review of Sickness Absence Vale of Glamorgan Council Final Report- November 2009.
Tree Appraisals in Urban and Rural Settings Jeff Heintz Assistant City Forester – Bismarck Private Forestry Consultant.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
10 th July 2008 Keith Sacre, Barcham Trees PLC From Research to Reliability Through Professional Alliances Keith Sacre, Sales Director Barcham Trees PLC.
ISO 9000 Certification ISO 9001 and ISO
Proposed Code of Practice for Inspections 3 rd Edition David Capon JAG UK Manager Keith O’Brien Cable & Wireless Worldwide.
Peter Defranceschi ICLEI - Local Governments for Sustainability An Introduction European Commission GPP Training Toolkit.
VIRGINIA PUBLIC-PRIVATE EDUCATION FACILITIES AND INFRASTRUCURE ACT OF 2002 (PPEA) Augusta County Board of Supervisors Wednesday, January 6, 2009.
Presenter-Dr. L.Karthiyayini Moderator- Dr. Abhishek Raut
Business records providing people with information/examining a particular subject.
1 The Initial Report Preparation Guidelines. 2 The Initial Report u Definition of project scope u Project aims and objectives u Initial project plan.
Validation of Non-formal Adult Education courses REACTION No CP LT-GRUNDTVIG-G1.
Guidance for AONB Partnership Members Welsh Member Training January 26/
Lecture 3 THE KEY SKILLS TESTED IN A DISSERTATION.
1 Unit 1 Information for management. 2 Introduction Decision-making is the primary role of the management function. The manager’s decision will depend.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
Important informations
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Review of the implementation in England of the Habitats and Wild Birds Directives Nature Directors 23 May 2012 Robin Mortimer, Defra.
Woody Plant Installations to Ensure Survival Lync Training (12 March 2013) Dr. William M. Fountain Extension Professor of Arboriculture UK College of Agriculture.
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
The Law Commission Parliamentary Law Making - Influences © The Law Bank Influences on Parliamentary Law Making The Law Commission 1.
1 Part 4 Self-review and certification Your progress as a curriculum developer Part 4 Self-review and certification Your progress as a curriculum developer.
Primer Briefing “Brand Name or Equal” Purchase Descriptions Ask a Professor - # Date:
Matthew Logan Tree Health Care Plant Well, Prune Property & Promote Healthy Roots.
REMEDIATION OF CONTAMINATED LAND IN SOUTH AFRICA Part 8 of the Waste Act Ms Mishelle Govender Chemicals and Waste Management.
Project management Topic 7 Controls. What is a control? Decision making activities – Planning – Monitor progress – Compare achievement with plan – Detect.
Project 1 (CGNB 413) Briefing
Presentation By L. M. Baird And Scottish Health Council Research & Public Involvement Knowledge Exchange Event 12 th March 2015.
CIL vs S106 The Regulation 123 list. The levy cannot be expected to pay for all of the infrastructure required: – 10-30% – Consider CIL as just one part.
ROAD INFRASTRUCTURE SAFETY MANAGEMENT DIRECTIVE (RISM) Harry Cullen SPM Road Safety, National Roads Authority, Ireland Chairman of CEDR Technical Group.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
9 th International HIA Conference A framework for public health officials to integrate HIA considerations in municipal project undertakings for the City.
APPRAISAL OF THE HEADTEACHER GOVERNORS’ BRIEFING.
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
Administration of a FIDIC Contract - Project Control
Strengthening our Community Tree Canopy Through Education
“No shade tree? Blame not the sun but yourself.”
“That’s my old place?!”.
Flooding Walkdown Guidance
Temporary Works Co-ordination
Beyond the Nursery Gates
Standards and Certification Training
General overview of Module
BASIC IRRS TRAINING Lecture 14
Tree related planning legislation
the Public Procurement Audit Practical Guide
Russell Center Small Research Grants Program
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
GPP Training Toolkit An Introduction European Commission
General overview of Module
Fitness Check EU Water Policy
Presentation transcript:

BS 8545: From Nursery to Independence in the Landscape Keith Sacre. Sales Director Barcham Trees.

Reasons a new standard was considered necessary: Lack of any existing standard which recognised the transition from nursery to independence in the landscape as a continuous process. Trees in Towns II. Suggests that up to 25% of the young trees planted by local authorities into the landscape fail.

Some examples. Absence of roots inside a supposed root ball Trees planted too deep. Drought ? Poor nursery production methods Poor root system

Some more Distorted and damaged root systems early in the production process Poor quality and ill specified nursery stock Lack of formative pruning post planting. Inadequate maintenanceUnfair competition !!!!!

And to finish: Stake and or tie !!!!! Reliable means of assessing physiological health. Failure to incorporate latest research into best practice guides and standards

Progress so far: Business plan and scoping document submitted to British Standard Institute and accepted. BS number created. BS Initial drafting panel met in June agreeing to undertake a comprehensive literature review of relevant subject material. Date set for second meeting: 5 th October 2010.

Scoping document: Headings Nursery production methods Despatch and Storage Transplanting Post planting maintenance Formative pruning

PROPOSED BRITISH STANDARD. YOUNG TREES: FROM THE NURSERY THROUGH TO INDEPEDENCE IN THE LANDSCAPE: A CONTINUOUS PROCESS. Scope: The proposed new standard, titled as above, would be aimed at tree nurseries, local authority tree officers, landscape contractors, landscape architects, arboricultural consultants, landscape designers and any other professionals involved in the process of transplanting young trees from the nursery into the landscape. The aim is to establish a guide to best practice which recognises the transplanting of young trees from the nursery into the landscape as a continuous process rather than a series of unrelated operations, as represented by current British Standards and other guidelines/ recommendations. The new BSI would concentrate on nursery trees from 8-10 cm girth upwards. The new BSI would not be concerned with whips, transplants and seedlings.

1:0. The Nursery. To identify and describe the productions methods used on tree nurseries in the UK and continent. To outline the advantages and disadvantages of each. (It is not the intention to make a case for one method to be favoured over another) To outline the current best practice for each of those production methods and introduce specifiable criteria based on current research. To increase the specifiable morphological parameters/characteristics beyond those currently in use. To introduce specifiable criteria, based on current research, which reflect tree health on the nursery. To use such specifiable criteria to produce a nursery benchmark for tree health which can then be used as a baseline post transplanting To re-assess what is actually needed from the nursery in terms of a fit for purpose product particularly for the urban environment. (Up until now the nursery has produced the criteria as opposed to producing what is actually required by the end user)

2.0. Despatch and storage. To review current best practice in despatching and transporting young trees from the nursery to either transplanting site or storage area prior to transplanting. To review storage practices prior to transplanting and the impact these have on transplanting success Transplanting. To review current best practice and recommendations for transplanting to include support systems, tree pit design, structural soils and other backfill mediums. To review the use of nutrient supplements and mychorrizal inoculations, considering when and how and of what value such supplements offer in enhancing transplanting success To relate the above to the nursery production system being used in any particular instance.

4.0. Post planting maintenance. To review the use of mulches and their value. To review post planting watering regimes and the methods of water delivery. (Do systems currently in use actually work?) To review the impact of herbicide applications, grass competition, grass management, soil compaction on transplanting success. To investigate and define the use of plant health assessment, measured against a nursery benchmark, to evaluate and identify stresses post transplanting allowing remedial action to be taken early Formative pruning. To review current best practice, including aims and objectives, of formative pruning and how this relates back to nursery practice.

The principal aim of the above is to achieve recognition that transplanting trees into the landscape is a process. All the above are parts of that process. The process itself needs a new vocabulary recognising it as such. The word establishment, for instance, is widely used as a definitive term yet its actual meaning has become nothing more than a vague description of an ill defined condition two/three years after transplanting. There is nothing which defines independence and permanence in the landscape. The proposed new standard can be best described as a comprehensive flow chart beginning with a nursery production system and traceable through to independence in the landscape. The flow chart will produce a series of questions and specifiable criteria which can be asked and used at all stages of the process irrespective of the actual methodology chosen. It will not be the purpose of the new standard to define and recommend any particular methodology or production process but to highlight the best practice which should be achieved for any of those production processes or methodologies to work successfully.

Strategic reasons for planting Site Assessment Climate/sun shade Micro climate:Soil FactorsStructural Factors Existing trees and other vegetation Species selection Size FormAvailabiltyCharacteristics

Nursery Production Method Open ground/bare root Rootballed Containerised Factors which can be specified (see rootballed for example Trees 3x transplanted Size of rootball relative to stem girth Additional factors Physiological health Stem taperProduction site Height stem diameter ratio

Draw up comprehensive specification and submit for quotation, if necessary Visit Nursery and select stock Transport from Nursery to Site Bare root / open ground Rootballed Containerised Lifting and handling Protection Lifting handling storage Lifting and handling Protection Lifting handling storage Planting

General Physical Pit Design Support Planting depth Hard surface GrassAbove ground Underground Pit size Staking systemsAnchors Soil volume Soil type Surfacing Specific Bare root/open ground Rootballed Containerised

Post planting maintenance Irrigation Nutrition Formative Pruning Mulch Independence in the landscape (Definition)

The drafting panel: Tony Kirkham Pete Wells Brian Crane Glynn Percival Mike Volp Keith Sacre Gary Scammell Andy Tipping Jeremy Barrell Ian Phillips Dave Gilchrist Mick Boddy

In my opinion, to be successful, there cannot be a reliance on the drafting panel to research, provide information and expertise, assimilate and draft the new document There will be a need for ongoing consultation with all those involved in the whole process of successfully transplanting young trees from nursery to permanence in the landscape. The London Tree Officers Association have already set up a working party to provide information on current practice in the London area. Any thoughts, views, items for consideration, examples of considered best practice would be most welcome and can be sent to If anyone would like to discuss further or be involved in anyway then please telephone me on or mobile

Thanks for listening.