Asset & Facilities Management: The value of whole life perspective.

Slides:



Advertisements
Similar presentations
19/02/2006 The NESSI European Technology Platform 2nd Workshop – Shanghai Feb 2006 Stefano De Panfilis R&D Laboratories Engineering Ingegneria.
Advertisements

057 CONSTRUCTION PRODUCTIVITY (MAJOR INFLUENTIAL FACTORS)
Principle 2 Promoting the public good. Because the public sector is the mechanism through which governments deliver programs and services for the benefit.
Slide 1 Design in Innovation Coming out from the Shadow of R&D Bruce Tether Centre for Research on Innovation & Competition and Manchester Business School,
How co-operative service delivery can impact residents and communities? Clare Oakley.
Professionalism in IT - the UK perspective Susie Kay BCS Director of Professionalism.
Enterprise Architecture at Penn State Brian H. Cameron, Ph.D. Executive Director Center for Enterprise Architecture The Pennsylvania State University ea.ist.psu.edu.
Client's aspirations, briefing and alignment of needs both within the client organisation and throughout the supply chain.
 What we plan to do next Digital Thinking, Smart Building: Driving Building Lifespan and Resource Efficiencies The Performance Gap Reid
Towards Active Engagement
EMPA Forum 2015 Workshop 3 - Endeavour BIM (Building Information Modelling) (2nd Lesson) & Using Augmented Reality February 2015.
TRAINING AGENDA Planner Module – September 20, 2005 Afternoon Session: 1:30 pm to 4:00 pm Planners Training Exercise I.Review Marie Headquarters Case Study:
BIM Sarah Birchall and Jo Harris 25 th September 2014.
© 2013 IBM Corporation Upgrade Best Practices September 2014.
Incremental Model Requirements phase Verify Specification phase Verify
The Integrated Care Record Service - a Local Trusts Perspective Peter Knight Head of IM&T Winchester & Eastleigh Healthcare Trust.
Lean Organizational Structure Lean Leadership Series.
DESKTOP MANAGEMENT 2004 Advancing the State of the Art.
INTEGRATION OF E - BUSINESS WITH ERP SYSTEM P RESENTATION ON INTEGRATION OF E - BUSINESS WITH ERP SYSTEM Presenting by Presenting by, Shruti raj Anushree.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Playing a leading role as Clients in 2015/16 Looking ahead to
Building a Mutually Rewarding Partnership [Your Company Name]’s Commitment to Delivering Unequaled Value to [Client Name] (Replace with client logo)
The Importance of the Qualifications Based Selection (QBS) Process
Construction Category Management Planning Version 1.1 (May 2015)
Vertex Start Here Oracle & iT Recruitment and solutions …with a differenceEthos We work within a consultative framework aimed at organisational needs.
Constructing West Midlands Martin Merrix Divisional Manager, Urban Design.
P ROJECT D ELIVERY M ETHODS. EFCA … is the sole association representing the engineering consultancy and related services industry in Europe represents.
Agenda - continued Defects Have we delivered value for members? Refreshments Challenges for clients 2015 and beyond? Strategic Direction – our priorities.
CLIFF HOCKING TODAY’S FACILITIES MANAGER AND TECHNOLOGY.
Commissioning Self Analysis and Planning Exercise activity sheets.
Health and Social Care Integration in Kent James Lampert Families and Social Care Kent County Council Kent Adult Social Care Conference 2012: Shaping Care.
Field Service Management
Data collected at Grassroots 2003 and Convention 2003 Are you the president of a local AIA chapter? Grassroots N/A.
CS 5150 Software Engineering Lecture 3 Software Processes 2.
Data Centre Masterclass Mend and Make do, or build from new Colin Richardson, on365 CEO.
Employer Portal. Customers will migrate to the new employer portal on their plan’s migration date. Customers and brokers (with portal access) will have.
CDM 2015 What we’ve learnt so far 20 October 2015.
Building Performance Evaluation £8m funding between 2010 & 2014 Case study investigations Identify factors that encourage good performance Domestic &
Software Engineering At Glance. Why We Need Software Engineering? The aim of software engineering is to solve the software crisis Software is delivered.
Digital Doorway to Rural Connectivity Network. Free / subsidised exposure to ICT ICTs as information tools Actively participate in information society.
CESA Conference 2014 Draft Resolutions. Procurement 1.Distribute CESA position paper to members and invite comment 2.Work with clients on improving procurement.
Presentation to The BIM Summit 2016 HOW BIM WILL ADVANCE THE RAILWAYS A Client’s Perspective Bernard Fanning Scheme Project Manager Network Rail Mainly.
Australian College of Health Services Executives (ACHSE) Understanding Important Influences on Hospital Designs: Building for a Responsive Future Topic:
CLC1501 Introduction to the PPP Procurement Approach – Principles of PPP Procurement.
TMA Systems Twenty Years of Experience (Incorporated 1988) More than 1,400 Clients Worldwide Over 45,000 Facilities – 3.2 Billion Square Feet Privately.
BEST East – Introduction Developing the capability to deliver more with less Neil Jarrett CWC.
Module Code : AURH453 Management Principles Assessment Number 1 (a) Nature of Industry In the form of an illustrated written report Weighting : (part)
Bridging Business & Buildings:
Eco Construction: Enhancing the Bidding Process with the Ariba® Discovery AdvantagePlus Program​ Company (Seller) Eco Construction and Maintenance Management.
Parliamentary Business The Parliamentary Service
UW T2O = Transition to (Sustainable) Occupancies
17 years of videogames industry
© 2011 Db-Line Srl  
INTEGRATION BASIC FACTS Third Sector Health & Social Care Support Team
ENTERPRISE RESOURCE PLANNING- ERP UNIT-1 INTRODUCTION Overview of Enterprise System Evolution Risks and Benefits Fundamental Technology Issues to be consider.
Becoming a Successful Construction Manager
Case Study – Energy Conglomerate from Australia
Presented by: Mike Younghusband Graham Barrow
We offer a global reach and help developing and advanced nations implement cutting-edge solutions.
Enterprise Resource Planning (ERP)
Rational Unified Process (RUP)
QE 107: Workshop Technology Section 5: Manufacturing Organisation
INTEGRATION BASIC FACTS IntegrationSupport Team
Project delivery RIBA stages Define design deliver Key Objectives 1 2
The National Society of Institutional Investment Professionals
Workshop Activity 1 (in groups – 4 students in each) – 15 minutes
This slide is in widescreen 16:9 format
Business challenge Without easy access to engineering and asset data, Enerjisa struggled to manage construction and maintenance at power plants—putting.
Activities of Formal Methods
Presentation transcript:

Asset & Facilities Management: The value of whole life perspective

Over the last 5 years traditional projects have been up to 44% less likely to deliver on cost, 35% less likely to deliver on design time and 48% less likely to deliver on construction time than other way of working Be report “Don’t risk the historic approach”

CCG Supports Current Industry Change CCG counts amongst its membership some of the leading best practice exponents in the industry CCG members fully support the need for change and the direction in which change is currently moving CCG believe the industry cannot reach high performance until all parts of the industry are able to contribute and benefit

DEVELOP PROCURE IMPLEMENT NEED The “Historic” Process

NEED DEVELOP PROCURE IMPLEMENT The “Transitional” Process

NEED PROCURE DEVELOP IMPLEMENT

NEEDPROCURE DEVELOP IMPLEMENT The “Aspirational” Process

OPERATE NEEDPROCURE DEVELOP IMPLEMENT

Source: Royal Academy of Engineering Business Function Construction Operation and Maintenance Process Push User Pull 250 – 2,500 ? Design 0.1 Business Benefit Why is FM Important to CCG?

What should CCG do next? What might be the benefits be if CCG were better integrated with Asset & Facilities Managers? (for FM Providers/CCG Clients/ Industry?)