European Gas Codes Update. Industry-wide seminar in conjunction with Ofgem and DECC  National Grid will be holding a workshop on 15th July on European.

Slides:



Advertisements
Similar presentations
The Agency for Cooperation of Energy Regulators (ACER) – UK Government views Sue Harrison Head of European Energy Markets 13 February 2008 EPP-ED Public.
Advertisements

Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)
SVQs Business and Administration Launch Events January/February 2011.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Agenda Walsall Works Current outputs 2014/15 Apprenticeship Pledgeometer Progressions Events The Real Apprenticeships Event The Big Bang Fair European.
New structure of GRI NW following revised road map Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman GRI NW.
Mod 0260 Post-Emergency Claims: Implementation Update Transmission Workstream - December 2009.
European Developments Transmission Workgroup 5 th April 2012.
EU Developments Transmission Workgroup 3rd November 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
GMB Young Members’ Summit 2013 BUILDING POWER; Young Members in the GMB Project Manager: David Braniff-Herbert Project Sponsor: Kamaljeet Jandu Administrator:
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Dr. Frank-Peter Hansen Bundesnetzagentur.
Place your chosen image here. Turn on the Grid and Guides option under View and check the ‘display drawing guides on screen’ box for position Annual.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
EU Developments. September Update  ACER Framework Guidelines on interoperability rules  Scoping paper still to be published  Rather than conduct a.
EU Developments Transmission Workgroup 6th October 2011.
European Developments Transmission Workgroup 1 March 2012.
European Developments Transmission Workgroup 2 nd February 2012.
Mail-merge and Contact Log Shaun Elliott – Business Consultant Enhance your knowledge, improve your organisation.
Chamber Event Listing For more information or to book a place go to Chamber Website Call
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
Capacity Allocation & Congestion Management Network Codes Stakeholder Meeting 3 July 2012 Introduction & Overview \
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Senior Stakeholder Forum 04/02/2014. Agenda UK-Link Programme Update –Including Data Cleansing Update Nexus Modification Update Faster Switching EU Reform.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Gas Regional Initiative North-West Transmission Transparency Transmission Transparency Project GRI North-West Operators‘ Group Stakeholder Group Meeting.
Proposer: Matthew Hatch Panel Date: 15 th May 0501: Treatment of Existing Entry Capacity Rights at the Bacton ASEP to comply with EU Capacity Regulations.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2009, Groningen.
All Island Single Electricity Market IWFA Update Laura Brien
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
Gas SO Incentives For 1 April 09 Transmission Workstream 3 July 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 1 st December 2011.
SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 14 January 2016.
European Developments Transmission Workgroup 3 rd May 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
EU Implementation Programme
Grid Code Development Forum – 6 September 2017
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Update on European Network Codes
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
Steven Gordon ACER Gas Department
UNC Trader User – Licence obligations
Gas SO Incentives from April 2010
Exit Capacity Substitution and Revision
EU Developments.
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Gas Customer Forum 28 July 2008
Modification 0621 / GB Charging Project DSC Change Management Committee update June 2018.
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

European Gas Codes Update

Industry-wide seminar in conjunction with Ofgem and DECC  National Grid will be holding a workshop on 15th July on European Network Codes with DECC and Ofgem:  Aims to build upon the workshop held on 31st January  To cover both gas and electricity  Provide details of work plans for ACER, ENTSOE and ENTSOG  Provide update on progress with the development of framework guidelines and network codes  Venue: Elexon’s offices, 4th Floor, 350 Euston Road, London NW1 3AW  Registration from to and we are aiming to finish by  Please book a place by contacting by 11th July, unannounced attendance cannot be accepted at the venue.

Transmission Workgroup Updates  National Grid NTS continues to encourage GB stakeholders to participate in the EU network code development process (consultations, stakeholder workshops, etc.)  “European developments” is now a standing agenda item for the Transmission Workgroup  National Grid NTS intend to use this agenda item to provide further updates on European code developments  Agenda item only to be used if there is something to report!  It is envisaged that specific UNC Workgroups will be raised as European developments become clear/firm