T O S Tendon Hammer Ophthalmoscope Stethoscope. Methods Prospective data collection March – May 2011 In-patients referred to neurology at University Hospital.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Fill in missing numbers or operations
Types of Number.
1
Slide 1Fig 24-CO, p.737. Slide 2Fig 24-1, p.740 Slide 3Fig 24-2, p.741.
& dding ubtracting ractions.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
David Burdett May 11, 2004 Package Binding for WS CDL.
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Create an Application Title 1Y - Youth Chapter 5.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
CALENDAR.
1 1  1 =.
27  9 =.
1  1 =.
CHAPTER 18 The Ankle and Lower Leg
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
The 5S numbers game..
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
MM4A6c: Apply the law of sines and the law of cosines.
Look at This PowerPoint for help on you times tables
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Before Between After.
Subtraction: Adding UP
Equal or Not. Equal or Not
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
Static Equilibrium; Elasticity and Fracture
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
PSSA Preparation.
& dding ubtracting ractions.
Weekly Attendance by Class w/e 6 th September 2013.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Graeme Henchel Multiples Graeme Henchel
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

T O S Tendon Hammer Ophthalmoscope Stethoscope

Methods Prospective data collection March – May 2011 In-patients referred to neurology at University Hospital Birmingham (UHB) (Trust A) and City Hospital (Trust B) – first contact with neurology – asked if they have been examined during this admission with a tendon hammer, ophthalmoscope and stethoscope Additional data included: admission date, age, sex, ward, referral reason, documented neurology examination, diagnosis

Results- Phase 1 (March-May 2011) Trust A – 30 patients included Trust B – 26 patients included Tendon hammer (T) Ophthalmoscope (O) Stethoscope (S) UHB Yes1550%620%2996.7% No1550%2480%13.3% City Yes2284.6%1973.1%2596.2% No415.4%726.9%13.9%

Diagnoses at Trust A

Diagnoses at Trust B

Source of Referrals at Trust A

Ward (Trust A) Tendon HammerOphthalmoscopeStethoscope Yes (%)No (%)Yes (%)No (%)Yes (%)No (%) A&E1 (50) 0 (0)2 (100) 0 (0) CDU (Clinical Decision Unit) 8 (72.7)3 (27.3)2 (18.2)9 (81.8)11 (100)0 (0) Medical4 (57.1)3 (42.9)2 (28.6)5 (71.4)7 (100)0 (0) Surgical2 (28.6)5 (71.4)2 (28.6)5 (71.4)7 (100)0 (0) ITU0 (0)3 (100)0 (0)3 (100)2 (66.7)1 (33.3)

Ophthalmoscopes at Trust A 36 in total – 20 (55.6%) working – 15 (41.7%) not working – 1 (2.8%)missing

Trust A- Ophthalmoscopes & TOS A&E – 9 (100%) working ophthalmoscopes, but... – 2 (100%) patients don’t remember being examined with an ophthalmoscope CDU – Total 4, 1 (25%) working – 9 (81.8%) patients don’t remember being examined with an ophthalmoscope

Phase 2- Results UHB – 15 patients included City – 22 patients included Tendon hammer (T) Ophthalmoscope (O) Stethoscope (S) UHB Yes853.3%640%1493.3% No746.7%960%16.7% City Yes1777.2%1777.2%22100% No522.7%5 00%

Phase 2- Diagnoses at Trust A

Phase 2- Diagnoses at Trust B

Tendon hammer (T) Ophthalmoscope (O) Stethoscope (S) Marc h – May 2011 UHB Yes1550%620%2996.7% No1550%2480%13.3% City Yes2284.6%1973.1%2596.1% No415.4%726.9%13.9% June – July 2011 UHB Yes853.3%640%1493.3% No746.7%960%16.7% City Yes1777.2%1777.2%22100% No522.7%5 00%