EU 3 rd Package Clarification of points raised at Transmission Workstream 3/12/2009.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

TITRE Public Workshop on REMIT Ljubljana, 19 July 2012 Public consultation document on ACER recommendations on REMIT records of transactions and implementing.
1 st GRG meeting, Zagreb, 30 September 2005 Gas Regulatory Group Main issues to be addressed.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
GRI NW Investment Workshop 4 June Den Haag Implementation of recommendation 4: ‘Make elements transparent that help achieve the investment prerequisites’
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
TSO Transparency project Gas Regional Initiative North West Ofgem, Great Britain Regional Co-ordination Committee 18th February 2011.
Nina Grall DG TREN – Directorat C GRI SSE-EFET WS, 21/01/2008, Prague Concepts for the EU Gas Market Requirements and framework EUROPEAN COMMISSION.
Implementation of the Network Code Balancing in the Netherlands Marcel Neef 28 November 2013.
EU Developments Transmission Workgroup 3rd November 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Third Energy Package for Change of Supplier 2009/73/EC.
Framework Guideline on gas capacity allocation Stefanie Neveling, Co-Chair CAM TF 20 th Madrid Forum, 27 September 2011.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Florence Forum Third package December, The possibility given by the EC to all stakeholders to comment the ” Discussion paper on the Third Energy.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
Transmission Workstream – 6 th May 2010 National Grid EU Transparency Project Update Chris Shanley.
EU Developments. September Update  ACER Framework Guidelines on interoperability rules  Scoping paper still to be published  Rather than conduct a.
EU Developments Transmission Workgroup 6th October 2011.
European Developments Transmission Workgroup 1 March 2012.
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
1 GIE Annual Conference Madrid, November 2007 Investing in Europe‘s Future – the Role of Regulators David Halldearn Senior Adviser, European Affairs.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Transparency in the Central West Electricity Regional Energy Market Office of Energy Regulation (DTe) MINI FORUM Paul Giesbertz.
Transparency GRI SSE -- 7th Stakeholder Group Meeting Vienna, 16 October 2009 Andrea Ćirlićová GTE+ Senior Adviser.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Metering Standards and Impact on Shrinkage Issue for Consideration 1 October 2009 for Gas Transmission Workstream.
MIPI European Transparency Project (ETP) Transmission Workstream 7 th October 2010.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
European Developments Transmission Workgroup 1 st December 2011.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
European Developments Transmission Workgroup 3 rd May 2012.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
EFET PG Information Ofgem GRI transparency workshop March 2009 European Federation of Energy Traders 1 Brussels, March 2009 Cemil Altin Transparency: Minimum.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
EU Phase 3 Customer communications
Congestion Management
New transparency guidelines
EU Implementation Programme
Transmission Planning Code – Draft Document
2009 TSO Transparency Gas Regional Initiative North-West
Transmission Planning Code
EU Regulation on AVAS requirements
Update on European Network Codes
Implementation of the Network Code Balancing in the Netherlands
Transmission Workstream - EU 3rd Package Update
Information Provision for Transitional Exit Capacity
Revised Tender Timescale for DN Interruption Arrangements
Item 6 of the Agenda Balance of Payments Working Group 2-3 April 2012
Presentation transcript:

EU 3 rd Package Clarification of points raised at Transmission Workstream 3/12/2009

EU 3 rd Package Implementation Date  EU 3 rd Package  The “3 rd Package” of EU energy legislation approved on 3 rd September 2009  Includes new transparency obligations (18 Month implementation lead time)  Regulation (EC) 715/2009 replaces (EC) 1775/2005 on 3 rd March 2011  NG NTS European Transparency Project scope based upon;  Generic data publishing obligations within (EC) 715/2009  Indicative, more specific, amendments to the Annex of 1775/2005 (currently being amended via comitology process)  Timescale for Annex amendments is currently unclear;  Scale of system & telemetry change for EU TSOs is large  Implementation therefore likely to coincide with (EC) 715/2009

Interpretation of ‘Pressure in a Balancing Zone’ data item  “Pressure in a balancing zone”  NG NTS perception (shared with other EU TSOs) is that this data is not meaningful:  To enable gas to flow differing pressures exist throughout network  Entry & Exit pressure requirements will continue to be published  NG NTS recommendation to Ofgem & DECC is that pressure clause should be re-worded to provide more meaningful market information such as opening and projected closing linepack or aggregate imbalance position of all users